McCallum v Pittwater Council [2010] NSWLEC 1136
The Court upheld the appeal because, although the proposed deck did not numerically comply with the rear setback and site coverage controls in Pittwater 21 Development Control Plan, the site’s steep topography, existing built form and limited open space justified variation of those controls. A 2m rear setback, with an exception for the 1.8m pool cover area, together with landscaping, stormwater and engineering conditions, would satisfactorily achieve the DCP outcomes by reducing perceived bulk, providing usable private open space, avoiding unreasonable overlooking and addressing stormwater and retaining wall concerns.
- Jurisdiction
- Australia
- Judgment Date
- 24 May 2010
- Procedural Posture
- Class 1 Appeal Pursuant to S 97(1) of the Environmental Planning and Assessment Act 1979 Against Refusal of a Development Application / Ex Tempore Judgment After Hearing
- Outcome
- Appeal upheld; development consent granted subject to conditions.
- Legal Topics
- ['construction of Timber Deck' 'rear Boundary Setback' 'site Coverage' 'development Control Plan Variation' 'privacy and Overlooking' 'stormwater Runoff' 'geotechnical Stability and Retaining Wall']
Case Brief
Summary, issues, holding and outcome
More case intelligence is available
Unlock the full research layer for this judgment.
Procedural Posture
Class 1 Appeal Pursuant to S 97(1) of the Environmental Planning and Assessment Act 1979 Against Refusal of a Development Application / Ex Tempore Judgment After Hearing
Legal Issues
- 1 ['Whether the Court had jurisdiction to determine the appeal as an appeal under s 97(1) of the Environmental Planning and Assessment Act 1979 for a new deck and use of existing piers as supports.' 'Whether non-compliance with the 6.5m rear setback control in clause D12.6 of Pittwater 21 Development Control Plan was acceptable.' 'Whether the proposed deck would result in unacceptable site coverage under clause D12.10 of Pittwater 21 Development Control Plan.' 'Whether privacy, overlooking, landscaping, stormwater runoff and retaining wall concerns could be adequately addressed by conditions.']
Ratio Decidendi
The Court upheld the appeal because, although the proposed deck did not numerically comply with the rear setback and site coverage controls in Pittwater 21 Development Control Plan, the site’s steep topography, existing built form and limited open space justified variation of those controls. A 2m rear setback, with an exception for the 1.8m pool cover area, together with landscaping, stormwater and engineering conditions, would satisfactorily achieve the DCP outcomes by reducing perceived bulk, providing usable private open space, avoiding unreasonable overlooking and addressing stormwater and retaining wall concerns.
Court Disposition
Appeal upheld; development consent granted subject to conditions.
Orders
- ['The appeal is upheld.' 'Development consent to DA417/09 is granted subject to the conditions that are annexure A to this judgment.' 'The exhibits apart from exhibit 2 and exhibit 1(the plans) are returned to the parties.']
Full Case Text
Judgment text and source record
Sign in to read
Sign in to read the full judgment text
Sign in to read the full judgment text. Downloads and additional research tools may depend on your plan.
Sign in to read the full judgment