Cryer v Flocchini [2017] NSWDC 247
The defendant breached specific oral stipulations in the contract by performing defective concreting work, including supplying a substantial proportion of concrete below the agreed 32 mpa durability and failing to meet required drainage, thickness, reinforcement and workmanship standards. The unchallenged expert evidence established that rectification was not viable and that complete demolition and reconstruction were required, causing both direct rectification costs and consequential economic losses proved by the plaintiffs.
- Jurisdiction
- Australia
- Judgment Date
- 02 June 2017
- Procedural Posture
- Civil Contract Claim for Damages Arising From Defective Concreting Work / Principal Judgment After Hearing
- Outcome
- Verdict and judgment for the plaintiffs against the defendant for $665,765.46, with the defendant to pay the plaintiffs' costs.
- Legal Topics
- ['oral Contract' 'defective Workmanship' 'concrete Slabs for Dairy and Fodder Shed' 'consequential Economic Loss' 'default Judgment Set Aside' 'unchallenged Expert Evidence']
Case Brief
Summary, issues, holding and outcome
More case intelligence is available
Unlock the full research layer for this judgment.
Procedural Posture
Civil Contract Claim for Damages Arising From Defective Concreting Work / Principal Judgment After Hearing
Legal Issues
- 1 ["Whether the defendant breached the oral contract to construct concrete slabs and a concourse according to the plaintiffs' specifications." 'Whether the concrete work was defective and required demolition rather than rectification.' 'What damages, including consequential economic losses, flowed from the defective work.']
Ratio Decidendi
The defendant breached specific oral stipulations in the contract by performing defective concreting work, including supplying a substantial proportion of concrete below the agreed 32 mpa durability and failing to meet required drainage, thickness, reinforcement and workmanship standards. The unchallenged expert evidence established that rectification was not viable and that complete demolition and reconstruction were required, causing both direct rectification costs and consequential economic losses proved by the plaintiffs.
Court Disposition
Verdict and judgment for the plaintiffs against the defendant for $665,765.46, with the defendant to pay the plaintiffs' costs.
Orders
- ['Verdict and judgment for the plaintiffs against the defendant for $665,765.46.' "The defendant is to pay the plaintiffs' costs."]
Full Case Text
Judgment text and source record
Sign in to read
Sign in to read the full judgment text
Sign in to read the full judgment text. Downloads and additional research tools may depend on your plan.
Sign in to read the full judgment