Jam Ventures Australia Pty Ltd v Inner West Council [2019] NSWLEC 1456
The proposed stormwater drainage plan is adequate to capture, retain and dispose of site stormwater without adverse impact on adjoining properties and achieves the objectives of the Leichhardt Local Environmental Plan 2013 and Leichhardt Development Control Plan 2013. Flexibility can be exercised to allow a departure from specific DCP controls when the objectives are met and reasonable attempts to obtain an easement have failed.
- Parties
- Applicant: Jam Ventures Australia Pty Ltd; Respondent: Inner West Council
- Jurisdiction
- Australia
- Judgment Date
- 26 September 2019
- Procedural Posture
- Appeal / Judgment on Appeal of Refusal of Modification Application
- Outcome
- Appeal upheld; consent is modified as proposed.
- Legal Topics
- Development Consent Modification, Stormwater Drainage, Flexibility in Development Control Plans, Deferred Commencement Conditions
Case Brief
Summary, issues, holding and outcome
More case intelligence is available
Unlock the full research layer for this judgment.
Parties
Jam Ventures Australia Pty Ltd
Applicant
Inner West Council
Respondent
Procedural Posture
Appeal / Judgment on Appeal of Refusal of Modification Application
Legal Issues
- 1 Whether deferred commencement condition requiring easement should be deleted
- 2 Whether proposed alternative stormwater drainage plan is adequate
- 3 Whether flexibility should be afforded where LDCP 2013 standards are not strictly met
Ratio Decidendi
The proposed stormwater drainage plan is adequate to capture, retain and dispose of site stormwater without adverse impact on adjoining properties and achieves the objectives of the Leichhardt Local Environmental Plan 2013 and Leichhardt Development Control Plan 2013. Flexibility can be exercised to allow a departure from specific DCP controls when the objectives are met and reasonable attempts to obtain an easement have failed.
Court Disposition
Appeal upheld; consent is modified as proposed.
Orders
- The appeal is upheld.
- The application to modify development consent D/2015/680 is granted by amending condition 1 of Part B, deleting the deferred commencement conditions and deleting conditions 3, 22, and 40(d) of Part B.
Full Case Text
Judgment text and source record
Sign in to read
Sign in to read the full judgment text
Sign in to read the full judgment text. Downloads and additional research tools may depend on your plan.
Sign in to read the full judgment