R. v. Meridian Construction Inc.
Defendants had actual notice or constructive responsibility for the unsecured skylight openings and failed to take immediate, reasonable corrective action after being informed; therefore both Meridian Construction Inc. and Donald London breached s.15(d)/s.17(1) and are guilty on Count 1. The mezzanine was not a "work area" under the Regulations so guardrails were not required and defendants are not guilty on Count 2. Count 3 failed because the Crown did not prove all particularized failings beyond a reasonable doubt.
- Citation
- 2004 NSPC 51
- Parties
- Crown: Her Majesty the Queen; Defendant: Meridian Construction Inc.; Defendant: Donald London
- Court
- Nova Scotia Provincial Court
- Jurisdiction
- Canada
- Judgment Date
- 18 October 2004
- Procedural Posture
- Criminal Occupational Health and Safety Act / Trial Judgment (written Decision)
- Outcome
- Meridian Construction Inc. convicted on Count 1 (failure to ensure fall protection at skylight openings); acquitted on Count 2 (mezzanine guardrails) and Count 3 (particularized failures not fully proven). Donald London convicted on Count 1; acquitted on Count 2.
- Legal Topics
- Fall Protection, Guardrails, Duty of Constructor, Due Diligence, Internal Responsibility System, Site Inspections, Reporting Systems
- Source Language
- English
Case Brief
Summary, issues, holding and outcome
More case intelligence is available
Unlock the full research layer for this judgment.
Parties
Her Majesty the Queen
Crown
Meridian Construction Inc.
Defendant
Donald London
Defendant
Procedural Posture
Criminal Occupational Health and Safety Act / Trial Judgment (written Decision)
Legal Issues
- 1 Whether defendants failed to take every reasonable precaution to ensure fall protection at the skylight openings
- 2 Whether guardrails were required at the second floor mezzanine and whether that area qualified as a "work area" under the Regulations
- 3 Whether Meridian Construction Inc. failed to take corrective action for hazards identified by workers including snow/ice, insufficient lighting, unguarded edges, unsecured skylights and lack of fall protection
Ratio Decidendi
Defendants had actual notice or constructive responsibility for the unsecured skylight openings and failed to take immediate, reasonable corrective action after being informed; therefore both Meridian Construction Inc. and Donald London breached s.15(d)/s.17(1) and are guilty on Count 1. The mezzanine was not a "work area" under the Regulations so guardrails were not required and defendants are not guilty on Count 2. Count 3 failed because the Crown did not prove all particularized failings beyond a reasonable doubt.
Court Disposition
Meridian Construction Inc. convicted on Count 1 (failure to ensure fall protection at skylight openings); acquitted on Count 2 (mezzanine guardrails) and Count 3 (particularized failures not fully proven). Donald London convicted on Count 1; acquitted on Count 2.
Orders
- Meridian Construction Inc. found guilty on Count 1 of the Information
- Meridian Construction Inc. found not guilty on Counts 2 and 3 of the Information
Full Case Text
Judgment text and source record
Sign in to read
Sign in to read the full judgment text
Sign in to read the full judgment text. Downloads and additional research tools may depend on your plan.
Sign in to read the full judgment