Goldswain & Anor v Beltec Ltd (t/a BCS Consulting) & Anor
Beltec Limited was not negligent as its design was competent, industry standard, and capable of safe implementation by a competent contractor. There was no contractual obligation to supervise or warn beyond what was provided. The collapse was caused by AIMS' failure to follow the design, install propping, and construct the slab and kicker as specified. No causative breach was established against Beltec. AIMS was liable for the collapse and resulting losses.
- Parties
- Claimant: Edward Goldswain; Claimant: Jacqueline Hale; First Defendant: Beltec Limited (t/a BCS Consulting); Second Defendant: AIMS Plumbing and Building Services Limited
- Jurisdiction
- England and Wales
- Judgment Date
- 10 March 2015
- Procedural Posture
- Civil Professional Negligence / Judgment After Trial
- Outcome
- Claim against Beltec Limited dismissed; judgment for Beltec. Judgment for Claimants against AIMS Plumbing and Building Services Limited for damages assessed at £287,754.55.
- Legal Topics
- Duty to Warn, Standard of Care, Liability of Engineers, Temporary Works, Causation, Quantum of Damages
Case Brief
Summary, issues, holding and outcome
More case intelligence is available
Unlock the full research layer for this judgment.
Parties
Edward Goldswain
Claimant
Jacqueline Hale
Claimant
Beltec Limited (t/a BCS Consulting)
First Defendant
AIMS Plumbing and Building Services Limited
Second Defendant
Procedural Posture
Civil Professional Negligence / Judgment After Trial
Legal Issues
- 1 Whether Beltec Limited was negligent in its design and/or failed to warn of risks in the basement works
- 2 Whether AIMS Plumbing and Building Services Limited was negligent in carrying out the works
- 3 Whether any breach by Beltec caused the collapse and loss
Ratio Decidendi
Beltec Limited was not negligent as its design was competent, industry standard, and capable of safe implementation by a competent contractor. There was no contractual obligation to supervise or warn beyond what was provided. The collapse was caused by AIMS' failure to follow the design, install propping, and construct the slab and kicker as specified. No causative breach was established against Beltec. AIMS was liable for the collapse and resulting losses.
Court Disposition
Claim against Beltec Limited dismissed; judgment for Beltec. Judgment for Claimants against AIMS Plumbing and Building Services Limited for damages assessed at £287,754.55.
Orders
- Claim against Beltec Limited dismissed.
- Judgment for Claimants against AIMS Plumbing and Building Services Limited.
Full Case Text
Judgment text and source record
Sign in to read
Sign in to read the full judgment text
Sign in to read the full judgment text. Downloads and additional research tools may depend on your plan.
Sign in to read the full judgment