Equipe Regeneration Ltd v Higgins Construction Ltd & Ors
The extension of time for service of the Particulars of Claim was granted as the Claimant demonstrated reasonable grounds, including the need to review a large volume of documents and the impact of the public health crisis. The disclosure application was refused because the documents were not shown to be required for the proper performance of contractual obligations, the time for pre-action disclosure had passed, and the requirements for specific disclosure under CPR 31.12 were not met.
- Parties
- Claimant: Equipe Regeneration Limited; First Defendant: Higgins Construction Limited; Second Defendant: Higgins Group PLC; Third Defendant: Mott MacDonald Limited
- Jurisdiction
- England and Wales
- Judgment Date
- 03 December 2020
- Procedural Posture
- Civil (construction/contract) / Interlocutory Applications (extension of Time and Disclosure)
- Outcome
- Extension of time granted; disclosure refused; costs in the case.
- Legal Topics
- Extension of Time for Service of Particulars, Disclosure of Documents, Pre Action Protocol, Costs
Case Brief
Summary, issues, holding and outcome
More case intelligence is available
Unlock the full research layer for this judgment.
Parties
Equipe Regeneration Limited
Claimant
Higgins Construction Limited
First Defendant
Higgins Group PLC
Second Defendant
Mott MacDonald Limited
Third Defendant
Procedural Posture
Civil (construction/contract) / Interlocutory Applications (extension of Time and Disclosure)
Legal Issues
- 1 Whether to grant an extension of time for service of the Particulars of Claim
- 2 Whether to order disclosure of specified categories of documents from the First and Second Defendants
- 3 Appropriate costs order for the applications
Ratio Decidendi
The extension of time for service of the Particulars of Claim was granted as the Claimant demonstrated reasonable grounds, including the need to review a large volume of documents and the impact of the public health crisis. The disclosure application was refused because the documents were not shown to be required for the proper performance of contractual obligations, the time for pre-action disclosure had passed, and the requirements for specific disclosure under CPR 31.12 were not met.
Court Disposition
Extension of time granted; disclosure refused; costs in the case.
Orders
- Extension of time for service of the Particulars of Claim to 11 March 2021, subject to service of a Pre Action Protocol letter by 8 January 2021 and liberty to apply for further extension at least 14 days before 11 March 2021.
- No order for disclosure of the two remaining categories of documents sought.
Full Case Text
Judgment text and source record
Sign in to read
Sign in to read the full judgment text
Sign in to read the full judgment text. Downloads and additional research tools may depend on your plan.
Sign in to read the full judgment