Tesco Stores Ltd. v Costain Construction Ltd & Ors
No contract was concluded between Tesco and Costain on Tesco’s standard terms or under seal; only a simple contract to commence construction existed, with no design responsibility or extended limitation period. Estoppel by convention cannot create a contract or extend limitation. Costain owed a duty of care in tort only for its own construction work, not for design by others, and not for economic loss absent a contract. PHJ’s contract was not a specialty, but clause 9.1 operated as a contractual agreement to a 12-year limitation period. Causes of action in tort accrued when Tesco first suffered economic loss, not at the time of the fire. Costain alone inspected the store in 1993; PHJ owed...
- Parties
- Claimant: Tesco Stores Limited; First Defendant: Costain Construction Limited; Second Defendant: Costain Limited; Third Defendant: Peter Hing and Jones (A Firm); Fourth Defendant: Vale (UK) Limited; Fifth Defendant: Whitelight Industries Limited
- Jurisdiction
- England and Wales
- Judgment Date
- 02 July 2003
- Procedural Posture
- Judgment on Preliminary Issues (high Court, Technology and Construction Court, England and Wales) / Determination of Preliminary Issues Prior to Main Trial
- Outcome
- Preliminary issues determined; contract found only on limited terms; most claims against Costain and PHJ time-barred or not established; estoppel arguments rejected; PHJ’s limitation period extended by contract; further factual issues reserved for main trial.
- Legal Topics
- Formation of Contract, Implied Terms, Estoppel by Convention, Concurrent Liability in Contract and Tort, Limitation Periods, Duty of Care in Construction, Economic Loss, Professional Negligence, Novation, Inspection and Reporting Duties
Case Brief
Summary, issues, holding and outcome
More case intelligence is available
Unlock the full research layer for this judgment.
Parties
Tesco Stores Limited
Claimant
Costain Construction Limited
First Defendant
Costain Limited
Second Defendant
Peter Hing and Jones (A Firm)
Third Defendant
Vale (UK) Limited
Fourth Defendant
Whitelight Industries Limited
Fifth Defendant
Procedural Posture
Judgment on Preliminary Issues (high Court, Technology and Construction Court, England and Wales) / Determination of Preliminary Issues Prior to Main Trial
Legal Issues
- 1 Whether a binding contract existed between Tesco and Costain for the design and construction of the Redditch store and on what terms
- 2 Whether Costain owed Tesco a duty of care in tort in relation to the construction and inspection of the store
- 3 Whether Costain or PHJ owed duties of care in respect of inspections and reports in 1993/1994
Ratio Decidendi
No contract was concluded between Tesco and Costain on Tesco’s standard terms or under seal; only a simple contract to commence construction existed, with no design responsibility or extended limitation period. Estoppel by convention cannot create a contract or extend limitation. Costain owed a duty of care in tort only for its own construction work, not for design by others, and not for economic loss absent a contract. PHJ’s contract was not a specialty, but clause 9.1 operated as a contractual agreement to a 12-year limitation period. Causes of action in tort accrued when Tesco first suffered economic loss, not at the time of the fire. Costain alone inspected the store in 1993; PHJ owed...
Court Disposition
Preliminary issues determined; contract found only on limited terms; most claims against Costain and PHJ time-barred or not established; estoppel arguments rejected; PHJ’s limitation period extended by contract; further factual issues reserved for main trial.
Orders
- Tesco and Costain made a simple contract to commence construction only; no contract on Tesco’s standard terms or under seal.
- No estoppel by convention found; Costain not estopped from denying contract or limitation period.
Full Case Text
Judgment text and source record
Sign in to read
Sign in to read the full judgment text
Sign in to read the full judgment text. Downloads and additional research tools may depend on your plan.
Sign in to read the full judgment