Alianca Navegacao E Logistica LTDA v Ameropa SA
Alianca was not in breach by taking the Cape Horn route, as it was a usual and reasonable route. However, Alianca breached its duty to properly care for the cargo by failing to ventilate in accordance with a sound system (including at night when safe) and by failing to properly disinfest the vessel's topsides, causing reinfestation. These breaches caused the cargo damage and consequent delays at Durban and Richards Bay. The delays were not caused by quarantine within the meaning of the charterparty. Demurrage is not payable for delays caused by the owner's fault.
- Parties
- Claimant: Alianca Navegacao e Logistica Ltda; Defendant: Ameropa SA
- Jurisdiction
- England and Wales
- Judgment Date
- 22 November 2019
- Procedural Posture
- Commercial Shipping Dispute (demurrage Claim) / High Court Trial Judgment
- Outcome
- Claim for demurrage dismissed to the extent delays were caused by Alianca's breaches; demurrage only recoverable for time exceeding laytime not caused by owner fault.
- Legal Topics
- Demurrage, Charterparty Interpretation, Cargo Care Obligations, Deviation, Ventilation of Cargo, Quarantine Exceptions
Case Brief
Summary, issues, holding and outcome
More case intelligence is available
Unlock the full research layer for this judgment.
Parties
Alianca Navegacao e Logistica Ltda
Claimant
Ameropa SA
Defendant
Procedural Posture
Commercial Shipping Dispute (demurrage Claim) / High Court Trial Judgment
Legal Issues
- 1 Whether the choice of route via Cape Horn constituted a deviation or breach of contract
- 2 Whether the vessel failed to proceed with all convenient speed and/or at warranted speed
- 3 Whether the cargo was properly and carefully ventilated in accordance with a sound system
Ratio Decidendi
Alianca was not in breach by taking the Cape Horn route, as it was a usual and reasonable route. However, Alianca breached its duty to properly care for the cargo by failing to ventilate in accordance with a sound system (including at night when safe) and by failing to properly disinfest the vessel's topsides, causing reinfestation. These breaches caused the cargo damage and consequent delays at Durban and Richards Bay. The delays were not caused by quarantine within the meaning of the charterparty. Demurrage is not payable for delays caused by the owner's fault.
Court Disposition
Claim for demurrage dismissed to the extent delays were caused by Alianca's breaches; demurrage only recoverable for time exceeding laytime not caused by owner fault.
Full Case Text
Judgment text and source record
Sign in to read
Sign in to read the full judgment text
Sign in to read the full judgment text. Downloads and additional research tools may depend on your plan.
Sign in to read the full judgment