Allen-Britten & Anor v Abels [2009] EWHC 1614 (TCC) (09 July 2009)
The contract was between Arbi'n'Tap Ltd and Mr Abels. Mr Abels breached the contract by late delivery, failing to complete the vessel, and delivering a vessel with significant defects and omissions, including lack of required stability certification and unfit design features. These breaches caused losses to the claimants, who were entitled to damages. The defendant's counterclaim for extras was largely unsubstantiated and failed except for minor sums.
- Citation
- [2009] EWHC 1614 (TCC)
- Parties
- Claimant: Corrine Allen-Britten; Claimant: Arbi'n'Tap Limited; Defendant: David Arthur Abels
- Jurisdiction
- England and Wales
- Judgment Date
- 09 July 2009
- Procedural Posture
- Civil Contract (technology and Construction Court) / Judgment After Trial
- Outcome
- Judgment for the claimants on the main claim; limited success for the defendant on minor elements of the counterclaim.
- Legal Topics
- Breach of Contract, Implied Terms, Fitness for Purpose, Sale of Goods, Damages, Repudiation, Counterclaim
Case Brief
Summary, issues, holding and outcome
More case intelligence is available
Unlock the full research layer for this judgment.
Parties
Corrine Allen-Britten
Claimant
Arbi'n'Tap Limited
Claimant
David Arthur Abels
Defendant
Procedural Posture
Civil Contract (technology and Construction Court) / Judgment After Trial
Legal Issues
- 1 Who was the purchaser and what were the relevant terms of the contract?
- 2 What breaches of contract occurred?
- 3 Did those breaches cause the claimed losses?
Ratio Decidendi
The contract was between Arbi'n'Tap Ltd and Mr Abels. Mr Abels breached the contract by late delivery, failing to complete the vessel, and delivering a vessel with significant defects and omissions, including lack of required stability certification and unfit design features. These breaches caused losses to the claimants, who were entitled to damages. The defendant's counterclaim for extras was largely unsubstantiated and failed except for minor sums.
Court Disposition
Judgment for the claimants on the main claim; limited success for the defendant on minor elements of the counterclaim.
Orders
- Damages awarded to claimants for breaches of contract and consequential losses.
- Defendant entitled to minor sums for proven extras supplied.
Full Case Text
Judgment text and source record
Sign in to read
Sign in to read the full judgment text
Sign in to read the full judgment text. Downloads and additional research tools may depend on your plan.
Sign in to read the full judgment