United Marine Aggregates Ltd v G.M.Welding & Engineering Ltd & Anor
The fire was caused by a globule of molten steel from the Defendants' hot work penetrating mastic in the underpan lining, starting a smouldering fire that later ignited. However, the Defendants took all reasonable precautions known and approved by UMA, including hosing down and fire watch for over an hour. The risk of a smouldering fire persisting undetected was not reasonably foreseeable. UMA had waived strict compliance with its Hot Work Procedure. Therefore, the Defendants were not liable in contract or tort. The Defendants' insurance claim would have failed due to breach of the warranty requiring all combustible materials to be covered and protected, as the mastic was not so covered.
- Parties
- Claimant: United Marine Aggregates Limited; Defendant: G. M. Welding & Engineering Limited; Part 20 Defendant: Novae Syndicates Limited
- Jurisdiction
- England and Wales
- Judgment Date
- 02 April 2012
- Procedural Posture
- Civil / Judgment After Full Trial
- Outcome
- Claim dismissed
- Legal Topics
- Negligence, Fire Damage, Contractual Duties, Insurance Warranties, Causation, Risk Assessment, Employer's Liability
Case Brief
Summary, issues, holding and outcome
More case intelligence is available
Unlock the full research layer for this judgment.
Parties
United Marine Aggregates Limited
Claimant
G. M. Welding & Engineering Limited
Defendant
Novae Syndicates Limited
Part 20 Defendant
Procedural Posture
Civil / Judgment After Full Trial
Legal Issues
- 1 Whether the fire was caused by the Defendants' breach of duty in contract or tort
- 2 Whether the Defendants are entitled to indemnity from their insurers under the policy
- 3 Whether the Defendants complied with contractual and insurance fire safety procedures
Ratio Decidendi
The fire was caused by a globule of molten steel from the Defendants' hot work penetrating mastic in the underpan lining, starting a smouldering fire that later ignited. However, the Defendants took all reasonable precautions known and approved by UMA, including hosing down and fire watch for over an hour. The risk of a smouldering fire persisting undetected was not reasonably foreseeable. UMA had waived strict compliance with its Hot Work Procedure. Therefore, the Defendants were not liable in contract or tort. The Defendants' insurance claim would have failed due to breach of the warranty requiring all combustible materials to be covered and protected, as the mastic was not so covered.
Court Disposition
Claim dismissed
Orders
- UMA's claim against the Defendants is dismissed.
- The Defendants' claim against the insurers is dismissed.
Full Case Text
Judgment text and source record
Sign in to read
Sign in to read the full judgment text
Sign in to read the full judgment text. Downloads and additional research tools may depend on your plan.
Sign in to read the full judgment