Network Rail Infrastructure Ltd v Handy [2015] EWHC 1175 (TCC) (06 May 2015)
Schedule 8 losses paid by Network Rail to TOCs as a result of negligent road users causing rail disruption are recoverable as consequential damages in both negligence and trespass. The Schedule 8 formula, being regulator-approved and industry standard, provides a reasonable basis for quantifying such losses. Economic losses are recoverable in trespass even absent physical damage.
- Citation
- [2015] EWHC 1175 (TCC)
- Parties
- Claimant: Network Rail Infrastructure Limited; Defendant: Simon Handy; Defendant: Andrew James Ingram; Defendant: Rob Hatfield Limited; Defendant: Rhiannon Parry; Defendant: David Charles Godley
- Jurisdiction
- England and Wales
- Judgment Date
- 06 May 2015
- Procedural Posture
- Negligence and Trespass Claims for Consequential Losses Following Damage to Rail Infrastructure / High Court Judgment After Trial
- Outcome
- Claims allowed; Schedule 8 losses recoverable from defendants.
- Legal Topics
- Negligence, Trespass to Land, Consequential Damages, Economic Loss, Railway Regulation, Damages Assessment
Case Brief
Summary, issues, holding and outcome
More case intelligence is available
Unlock the full research layer for this judgment.
Parties
Network Rail Infrastructure Limited
Claimant
Simon Handy
Defendant
Andrew James Ingram
Defendant
Rob Hatfield Limited
Defendant
Rhiannon Parry
Defendant
David Charles Godley
Defendant
Procedural Posture
Negligence and Trespass Claims for Consequential Losses Following Damage to Rail Infrastructure / High Court Judgment After Trial
Legal Issues
- 1 Whether Schedule 8 losses claimed by Network Rail are recoverable from negligent road users causing rail disruption
- 2 Whether the Schedule 8 formula provides a reasonable estimate of loss
- 3 Whether economic losses are recoverable in trespass absent physical damage
Ratio Decidendi
Schedule 8 losses paid by Network Rail to TOCs as a result of negligent road users causing rail disruption are recoverable as consequential damages in both negligence and trespass. The Schedule 8 formula, being regulator-approved and industry standard, provides a reasonable basis for quantifying such losses. Economic losses are recoverable in trespass even absent physical damage.
Court Disposition
Claims allowed; Schedule 8 losses recoverable from defendants.
Orders
- Defendants to pay Schedule 8 losses as quantified for each incident.
- Defendants liable for inspection and repair costs as agreed.
Full Case Text
Judgment text and source record
Sign in to read
Sign in to read the full judgment text
Sign in to read the full judgment text. Downloads and additional research tools may depend on your plan.
Sign in to read the full judgment