MINMETALS CONDO (HONG KONG) ENGINEERING CO LTD v. COLMAT CONSTRUCTION AND ENGINEERING CO LTD
Only the contract drawings and the technical specifications in Annexure 2 as relevant to the subcontractor's works were incorporated into the Contract; the Contract was a remeasurement contract based on flat area so measurement by area and the unit rates in the schedules apply; where the plaintiff failed to prove entitlement or substantiate quantum the claims were disallowed; contra charges required clear evidence and were only allowed in limited, substantiated parts.
- Citation
- [2021] HKCFI 2184
- Parties
- Plaintiff (hcct36): Colmat Construction and Engineering Company Limited; Defendant (hcct36): Minmetals Condo (Hong Kong) Engineering Company Limited; Plaintiff (hcct37): Minmetals Condo (Hong Kong) Engineering Company Limited; Defendant (hcct37): Colmat Construction and Engineering Company Limited
- Court
- Court of First Instance
- Jurisdiction
- Hong Kong
- Judgment Date
- 26 July 2021
- Case Number
- HCCT37/2018
- Procedural Posture
- Construction and Arbitration Proceedings / Judgment
- Outcome
- Judgment partly for both parties: major weight-based claims by plaintiff dismissed; multiple variation claims disallowed for lack of substantiation; specific variation and counterclaim items allowed in part as quantified in reasons; parties to submit draft order and costs submissions.
- Legal Topics
- Incorporation by Reference, Variation Claims, Contract Interpretation, Quantum and Valuation, Remeasurement Contracts, Expert Evidence, Contra Charges, Burden of Proof
- Source Language
- EN
Case Brief
Summary, issues, holding and outcome
More case intelligence is available
Unlock the full research layer for this judgment.
Parties
Colmat Construction and Engineering Company Limited
Plaintiff (hcct36)
Minmetals Condo (Hong Kong) Engineering Company Limited
Defendant (hcct36)
Minmetals Condo (Hong Kong) Engineering Company Limited
Plaintiff (hcct37)
Colmat Construction and Engineering Company Limited
Defendant (hcct37)
Procedural Posture
Construction and Arbitration Proceedings / Judgment
Legal Issues
- 1 Whether documents contained on the disc/Annexure 2 other than drawings and technical specifications were incorporated into the subcontract
- 2 Whether the plaintiffs additional works/variations were within the scope of the Contract or outside it
- 3 Appropriate method of valuation for disputed items (flat area remeasurement v weight-based measurement)
Ratio Decidendi
Only the contract drawings and the technical specifications in Annexure 2 as relevant to the subcontractor's works were incorporated into the Contract; the Contract was a remeasurement contract based on flat area so measurement by area and the unit rates in the schedules apply; where the plaintiff failed to prove entitlement or substantiate quantum the claims were disallowed; contra charges required clear evidence and were only allowed in limited, substantiated parts.
Court Disposition
Judgment partly for both parties: major weight-based claims by plaintiff dismissed; multiple variation claims disallowed for lack of substantiation; specific variation and counterclaim items allowed in part as quantified in reasons; parties to submit draft order and costs submissions.
Orders
- Parties to agree and submit within 21 days a draft judgment order setting out respective entitlements to sums claimed and counterclaimed
- Parties to file written submissions on costs not exceeding 3 A4 pages, double-spaced, 14 point Times New Roman
Full Case Text
Judgment text and source record