BRUCE DAVID GOURLAY v. CLIPPER MOTOR YACHTS LTD AND OTHERS

BRUCE DAVID GOURLAY v. CLIPPER MOTOR YACHTS LTD AND OTHERS

The court construed 'double sheathed' to require a cable with an additional outer moulded sheath (as represented by Exhibit E) which may then be enclosed in conduit; the installed arrangement of single-sheathed insulated wires inside split corrugated tubing (Exhibit A in Exhibit B) is not 'double sheathed' and therefore does not conform to clause 1.15 and likely does not meet the Australian wiring standards.

Citation
BRUCE DAVID GOURLAY v. CLIPPER MOTOR YACHTS LTD AND OTHERS
Parties
Plaintiff: Bruce David Gourlay; 1st Defendant: Clipper Motor Yachts Limited; 2nd Defendant: International Yacht Sales (HK) Services Limited; 3rd Defendant: Mark Campion; 4th Defendant: David Spicer
Court
Court of First Instance
Jurisdiction
Hong Kong
Judgment Date
23 December 2010
Case Number
HCCL30/2009
Procedural Posture
Commercial Action Contract for Sale of Vessel (specific Performance, Damages, Rescission) / Expedited Preliminary Issue Hearing (decision on Preliminary Issue)
Outcome
Preliminary issue decided for the plaintiff: the wiring installed does not conform to clause 1.15 (not double sheathed).
Legal Topics
Contract Interpretation, Specific Performance and Damages, Compliance With Technical Standards (as/nzs), Preliminary Issue Determination, Costs
Source Language
EN

Case Brief

Summary, issues, holding and outcome

More case intelligence is available

Unlock the full research layer for this judgment.

Full judgment text Downloadable case file Legal principles 3 Authorities cited 2 Party arguments 2 Amounts and remedies 1
Sign in to unlock

Parties

Bruce David Gourlay

Plaintiff

Clipper Motor Yachts Limited

1st Defendant

International Yacht Sales (HK) Services Limited

2nd Defendant

Mark Campion

3rd Defendant

David Spicer

4th Defendant

Procedural Posture

Commercial Action Contract for Sale of Vessel (specific Performance, Damages, Rescission) / Expedited Preliminary Issue Hearing (decision on Preliminary Issue)

  1. 1 Whether the wiring installed on the vessel conforms to clause 1.15 of the Memorandum of Agreement requiring "All wiring to be double sheathed conduit[d]" and compliance with Australian pleasure craft standards (AS/NZS).
  2. 2 Whether the phrase 'double sheathed conduit[d]' permits single-sheathed insulated wires within a split corrugated conduit (Exhibit A in Exhibit B) or requires an integrated double-sheathed cable (Exhibit E) possibly within conduit.

Ratio Decidendi

The court construed 'double sheathed' to require a cable with an additional outer moulded sheath (as represented by Exhibit E) which may then be enclosed in conduit; the installed arrangement of single-sheathed insulated wires inside split corrugated tubing (Exhibit A in Exhibit B) is not 'double sheathed' and therefore does not conform to clause 1.15 and likely does not meet the Australian wiring standards.

Court Disposition

Preliminary issue decided for the plaintiff: the wiring installed does not conform to clause 1.15 (not double sheathed).

Orders

  • Answer to the preliminary issue: the wiring installed aboard Clipper Europa Hull No.52C06 is not in conformity with clause 1.15 of the Agreement.
  • Order nisi that the costs of and occasioned by the hearing of the preliminary issue be to the plaintiff, such costs to be taxed if not agreed.