DELHI DEVELOPMENT AUTHORITY v S.S. AGGARWAL & ORS.

On this page

Professional case brief

Research organized from the available case record

01

Holding and result

The Supreme Court held that the High Court erred in deciding the appeals and allowing the amendment application for higher compensation without considering the locus of the assignees or the unexplained delay. Assignees did not seek substitution or produce assignment deeds before relevant forums, thus avoiding due scrutiny of their entitlement. The matter must be remitted for determination of compensation after a full inquiry and opportunity for evidence on all sides, including on the validity of assignment and the locus of assignees.

Court disposition

Appeal allowed. Judgments of High Court and Reference Court set aside. Case remitted for fresh determination.

Orders

  • Judgments of High Court and Reference Court set aside.
  • Matter remitted to Reference Court to decide entitlement (locus) of assignees and quantum of compensation.
  • Reference Court to give all parties reasonable opportunity to adduce evidence.
  • Delhi Development Authority entitled to participate and raise objections.
  • Reference Court to decide the case within one year.

02

Material facts

Parties

Delhi Development Authority

Appellant Counsel: A. Sharan, Geeta Luthra, Vishnu B. Saharya (Saharya & Co.) AOR, D.N. Goburdhan

S.S. Aggarwal and others

Respondents/assignees Counsel: Dhruv Mehta, Yashraj Singh Deora, Sriram Krishna, Rachna Srivastava

Om Prakash and others

Respondents/assignees

Amounts and remedies

  • Initial Compensation Claimed by Landowners: INR 4,000
  • Market Value Fixed by Land Acquisition Collector: INR 98
  • Market Value Fixed by Reference Court (per Bigha): INR 102,000
  • Appeal Claim by Assignees (per Square Yard, Limited by Funds): INR 3,000
  • Amended Claim by Assignees on Appeal (per Square Yard): INR 7,000
  • High Court Enhanced Market Value (per Square Yard): INR 7,390
  • Assignment Consideration Amount: INR 480,000

03

Procedural history

  1. Posture

    Civil Appeal / Supreme Court Judgment After Appeal From High Court Order (civil Appeal Nos. 7301 7302 of 2003)

04

Questions and positions

Legal issues

Party arguments

Applicant
The assignees lacked the locus to claim compensation without formal substitution and disclosure of assignment deeds. Assignment deeds executed after notification are void as they defeat the statutory purpose. The High Court erred in entertaining the amendment application after an unexplained delay and without proper inquiry.
Respondent
The right to receive compensation is a transferable property right. Assignment deeds were validly executed and registered. High Court could allow amendment in the interest of justice as the claim for higher compensation was limited earlier due to paucity of funds.

05

Court’s reasoning

  1. 01

    Dawson v. Great Northern and City Railway Company (1905) 1 KB 260, Sunrise Associates v. Government of NCT of Delhi (2006) 5 SCC 603

    The right to receive compensation is a property right and can be assigned.

  2. 02

    Union of India v. Pramod Gupta (2005) 12 SCC 1

    Delay/laches and statutory restrictions under Section 25(2) Land Acquisition Act are relevant in permitting amendments related to compensation claims.

  3. 03

    Rattan Chand Hira Chand v. Askar Nawaz Jung (1991) 3 SCC 67

    Assignment deeds executed after notification under Section 4 may be opposed to public policy/statute.

06

Ratio, limits and disposition

Ratio decidendi

The Supreme Court held that the High Court erred in deciding the appeals and allowing the amendment application for higher compensation without considering the locus of the assignees or the unexplained delay. Assignees did not seek substitution or produce assignment deeds before relevant forums, thus avoiding due scrutiny of their entitlement. The matter must be remitted for determination of compensation after a full inquiry and opportunity for evidence on all sides, including on the validity of assignment and the locus of assignees.

Obiter and limits

  • If the assignment deeds had been produced earlier, the competent authorities could have held an inquiry and given opportunity to contest or explain the claims.
  • The High Court further erred by allowing amendment without addressing the unexplained delay of over four years.

Court disposition

Appeal allowed. Judgments of High Court and Reference Court set aside. Case remitted for fresh determination.

  • Judgments of High Court and Reference Court set aside.
  • Matter remitted to Reference Court to decide entitlement (locus) of assignees and quantum of compensation.
  • Reference Court to give all parties reasonable opportunity to adduce evidence.
  • Delhi Development Authority entitled to participate and raise objections.
  • Reference Court to decide the case within one year.

Source and reliance status

Official court record

This page organises the available record for research. Confirm quotations, current status, and subsequent treatment against the official source before relying on the case.

Judgment reading view

Judgment text

The complete available source text.

Court record

Judgment

Judgment

(2011] 9 S.C.R. 756

DELHI DEVELOPMENT AUTHORITY v. S.S. AGGARWAL & ORS. (Civil Appeal No. 7301-7302 of 2003)

AUGUST 02, 2011

A

B

[G.S. SINGHVI AND ASOK KUMAR GANGULY, JJ.]

Land Acquisition Act, 1894 - ss. 18 and 54 - Acquisition of land - Petitions by the landowners claiming compensation c at the prevailing market price - During pendency, execution of the assignment deeds by the landowners - Thereafter, award passed by the Land Acquisition Collector - Application u/s. 18 for re-fixation of market value of the acquired land by assignees - No inquiry on the issue of locus of assignees to D claim compensation by the Collector and matter referred to the Reference Court - Reference Court also did not inquire about tile entitlement - Market value re-fixed - Appeal u/s. 54 by the assignees that they were entitled to enhanced compensation but limiting their clai1.1 due to paucity of funds E - After four and a half years of filing the appeals, petition for amendment of the memo of appeal by the assignees - Division Bench of the High Court enhanced the market value of the acquired land and also allowed the amendment application - On appeal, held: Even though in terms of the assignment deeds, assignees became entitled to seek substitution before the Land Acquisition Collector, they neither sought impleadment in the award proceedings nor produced the assignment deeds to show that the landowners had transferred the right to receive compensation - There was no explanation for the same - High Court committed an error by entertaining and allowing the amendment application.filed by the assignees and that too without even adverting to the issue of unexplained delay of four and a half years - High Court first decided the appeals filed by the assignees and then

G

F

H

756

.,..-.

_,.

' -

~

"'

~

·"

,._

~·

. ~ .....

.. "

;.

t

ii

'I_

).

J,

~

DELHI DEVELOPMENT AUTHORITY v. S.S. AGGARWAL & ORS .

757

disposed of the amendment application without going through A the records - As such, Union of India and DDA were deprived of an opportunity to make a request to the High Court to remit the case to the Reference Court - Matter remitted to the Reference Court for fresh determination of the compensation payable to the landowners and/or assignees.

B

Landowners were issued notices with regard to acquisition of their lands. They filed petitions claiming compensation at the rate of Rs. 4,000/- per square yard. During pendency of the matter, the landowners executed c Assignment Deed in favour of assignees. The Land Acquisition Collector fixed the market value of the acquired land at the rate of Rs. 98/- per square yard. Thereafter, the assignees filed an application u/s. 18 of the Act for re-fixation of market value of the acquired land. The Collector did not make any inquiry and referred the D matter to the court. The Reference Court also did not inquire about the entitlement and fixed the market value of the acquired land at the rate of Rs. 1,02,000/-. Aggrieved, the assignees filed an application uls. 54 claiming that even though they were entitled to enhanced E compensation but due to paucity of funds they were limiting their claim to Rs. 3,000/- per square yard. After four and a half years of filing the appeals, the assignees filed a petition for amendment of the memo of appeal so as to enable them to claim compensation at the rate of F Rs.7,000/- per square yard. The Division Bench enhanced the market value of the acquired land to Rs. 7,390/- per square yard as also allowed the application. Therefore, the instant cross appeals were filed.

Disposing of the appeals, the Court

G

HELD: 1.1 Even though in terms of the assignment deeds, respondent and others-assignees became entitled to seek substitution before the Land Acquisition Collector, they neither sought impleadment in the award H

758

SUPREME COURT REPORTS

[2011] 9 S.C.R.

A proceedings nor produced the assignment deeds to show that the landowners had transferred the right to receive compensation. [Para 14) [768-C-D]

1.2 The counsel appearing for the assignees could B not offer any tangible explanation as to why his clients chose to keep the Land Acquisition Collector, the Reference Court and the High Court in dark about the execution of the assignment deeds by the landowners. Therefore, it is reasonable to presume that they had done c so deliberately and the only possible reason for this could be to avoid a proper scrutiny by the Land Acquisition Collector and two judicial forums about their entitlement to receive compensation at a rate higher than Rs.58/- per square yard paid to the landowners. If the assignment deeds had been produced before the Land Acquisition D Collector or the Reference Court, either of them could have held an inquiry and given an opportunity to the landowners and/or assignees to explain the position. By withholding the assignment deeds, the assignees succeeded in avoiding proper sci utiny of their claim for E compensation at the hands of the Land Acquisition Collector, the Reference Court and the High Court. [Para 15) [768-E-H; 769-A]

1.3 There is merit in the submission that the High F Court committed serious error by entertaining and allowing the amendment application filed by the respondent and others. It is surprising that the High Court first decided the appeals filed by the assignees and then disposed of the amendment application and that too without going through the records. If this was not so, there was no occasion for the High Court to incorporate the condition of making good the deficiency in court fee. By this process, the Union of India and the DOA were deprived of an important opportunity to make a request to the High Court to remit the case to the Reference Court

G

'

H

-

>r

• •

..

I\

...

~

•

,..

JI.

..

DELHI DEVELOPMENT AUTHORITY v. S.S. AGGARWAL & ORS. [G.S. SINGHVI, J.]

759

or at least allow them to adduce evidence on the issue A of correct market value of the acquired land. Also the High Court erred in allowing the amendment application without even adverting to the issue of unexplained delay of four and a half years. (Para 17) (769-C-E]

B

1.4 The impugned judgment as also the one passed by the Reference Court are set aside. The matter is remitted to the Reference Court for fresh determination of the compensation payable to the landowners and/or assignees after giving them reasonable opportunity of C adducing evidence in support of their respective cases. While doing so the Reference Court would first decide the issue of locus of the assignees to claim compensation. The ODA shall be entitled to participate in the proceedings of the Reference Court and raise objections against the claim made by the assignees for payment of D compensation as also be entitled to raise all other legally permissible objections to contest the claim of the assignees. [Para 19) [771-B-F]

Delhi Development Authority v. Bhola Nath Sharma E

(2011) 2 sec 54 - relied on.

Buta Singh v. Union of India (1995) 5 SCC 284: 1995 (3) SCR 359; Union of India v. Pramod Gupta (2005) 12 SCC 1: 2005 (3) Suppl. SCR 48; Rattan Chand Hira Chand v. Askar Nawaz Jung (1991) 3 SCC 67: 1991 (1) SCR 327; Murlidhar Dayandeo Kesekar v. Vishwanath Pandu Barde (1995) Supp. 2 SCC 549:; Central Inland Water Transport Corporation v. Brojo Nath Ganguly (1986) 3 SCC 156: 1986 ( 2 ) SCR 278; Jayamma v. Maria Bai .(2004) 7 S~C 459: G 2004 (3 ) Suppl. SCR 175; Sunnse Associates v. Government of NCT of Delhi (2006) 5 SCC 603: 2006 (1) Suppl. SCR 421 - referred to.

F

Dawson v. Great Northern and City Railway Company

(1905) 1 KB 260 - referred to.

H

760

SUPREME COURT REPORTS

[2011] 9 S.C.R.

Case Law Reference:

1995 ( 3 ) SCR 359

Referred to

Para 11

2005 (3 ) Suppl. SCR 48 Referred to

Referred to 1991 (1) SCR 327 (1995) Supp. 2 sec 549 Referred to

Para 11, 18

Para 12

Para 12

1986 ( 2) SCR 278

Referred to

Para 12

2004 (3 ) Suppl. SCR 175Referred to

Para 12

.,,

-;-

• •

(1905) 1 KB 260

Referred to

Para 13

2006 (1) Suppl. SCR 421 Referred to (2011) 2 sec 54

Relied on

Para 13

Para 19

..

~

...

A

B

c

D

CIVIL APPELLATE JURISDICTION : Civil Appeal No.

7301-7302 of 2003.

From the Judgment and Order dated 21.02.2003 of the E High Court of Delhi at New Delhi in R.F.A. No. 1147 and 155

of 1998.

WITH

C.A. No. 836 of 2004.

F C.A. No. 6264-6265 of 2011.

A. Sharan, Geeta Luthra, Vishnu B. Saharya (Saharya &

Co.) AOR (for ODA) and D.N. Goburdhan for the Appellant.

G

Dhruv Mehta, Yashraj Singh Deora, Sriram Krishna and

Rachna Srivastava for the Respondents.

The Judgment of the Court was delivered by

G.5. SINGHVI, J.

1. Leave granted in SLP(C) Nos. 18056-

H 18057 of 2003.

> •

,..

,~

"' ~

DELHI DEVELOPMENT AUTHORITY v. S.S. AGGARWAL & ORS. [G.S. SINGHVI, J.]

761

2. These appeals are directed against judgment dated A

21.2.2003 of the Division Bench of the Delhi High Court whereby the appeals preferred by two groups of persons i.e., S.S. Aggarwal and others and Om Prakash and others under Section 54 of the Land Acquisition Act, 1894 (for short, "the •* ;.. Act") were allowed and market value of the acquired land fixed 8 by Additional District Judge, Delhi (hereinafter described as, "the Reference Court") was enhanced from Rs.102/- to Rs.7,390/- per square yard.

-

...

~

·"

..

~

,,.,

~ ..

3. By notification dated 6.1.1995 issued under Section 4(1) c

read with Section 17(1) of the Act, the Government of National Capital Territory of Delhi proposed the acquisition of 27 bighas 5 biswas land situated at village Jasola. After 4 days, the declaration was issued under Section 6 of the Act.

4. In response to the notice issued under Section 9 of the D

Act, the landowners filed three claim petitions through the same Advocate, namely, Ch. Sawrup Singh. One of the petitions was filed by Kishan Lal and 13 others. The other was filed by S.K. Sarogi and another and the third was filed by Mangla Ram and 3 others. They pleaded that keeping in view the prevailing E market rates, they be paid compensation at least at the rate of Rs.4,000/- per square yard. In support of their claim, the landowners relied upon the allotments made by the Delhi Development Authority (for short, 'the DOA') at a concessional rate of Rs.2,200/- per square yard.

F

5. During the pendency of the matter before the Land Acquisition Collector, Delhi, Mangla Ra~ and 3 others executed Assignment Deed dated 21.9.1995 in favour of Om Prakash Phire Ram and Vinod Kumar (all sons of Ch. Swarup G Singh, Advocate, who was representing the landow~ers before the Land Acquisition Collector). The relevant portions of the assignment deed are extracted below:

"WHEREAS, the Vendors are the actual owners ~f the Acquired Land Total Measuring 8 Bighas and 5 81swas, H

762

SUPREME COURT REPORTS

[2011] 9 S.C.R.

>/L--

+

A

in Khasra No. 133 situated in Revenue Estate of Village Jasola, Tehsil Mehrauli, New Delhi.

That the above said land has been n1:>tified under Section 4 of the Land Acquisition Act, 1894, on 6.1.1995, and declaration under Section 6 and notification under 17(1) of the Land Acquisition Act, 1894, has also been issued on 10th Jan. 1993 but the compensation in respect of said land has not been passed by Govt. to the Vendors so far.

.. •

AND WHEREAS, the possession of thia said land has also been taken by the Govt. on 22nd February, 1995.

AND WHEREAS, the Vendors have willingly agreed to sell transfer the said compensation right of the said land measuring 8 big has 5 biswas, in Khasre1 No. 133, of village Jasola, Tehsil Mehrauli, New Delhi, whatsoever to be settled by the Land Acquisition Collector in award or by the court in reference or in revisions or appeals of the same in High Courts with all rights to recover and receive the same from the concerned authorities/deptts. for a sum of Rs.4,80,000/- [Rs. Four lacs and eighty thousand only) and the Vendees have agreed to purchase the same for said amount.

The entire consideration amount ,of Rs. 4,80,000/- [Rs Four lacs and eighty thousand only], has already been received in advance by the Vendors from the Vendees [the receipt whereof, the Vendors admit and acknowledge] in full and final settlement.

...

t

....

"

~

NOW THIS ASSIGMENT DEED WITNESSETH AS UNDER:

~

!.~

1. That the Vendors do hereby sell, transfer, convey and assign the compensation rights, whatsoever to be settled by the Land Acquisition Collector inAward or by the courts in reference perceptions, revisions as sale t~tc. of the same

B

c

D

E

F

I

G

H

-t·

~

, ..

~

-"

... .•

->

~

DELHI DEVELOPMENT AUTHORITY v. S.S. AGGARWAL & ORS. [G.S. SINGHVI, J.]

763

to be filed in Delhi High Court and other higher courts with A rights to receive and recover the same from the concerned authorities/Deptts. with each and every rights which vest in their names as towards the above said award of the Land Acquisition Collector and in reference, revisions, appeals etc. upto the Vendees.

B

2. That the Vendors admit that they have no right left with the compensation right to be settled in above said award or in reference, revisions or appeals etc. and the same has become property of the Vendees, with the rights to c receive and recover the same.

3. That the Vendors admit that the Vendees are fully entitled to substitute themselves before Land Acquisition Collector in Award/reference as mentioned above and to conduct the same. The vendors have handed over and D delivered the notices and other acquisition documents and all other relevant papers/documents to the Vendees.

4. That the Vendors have assured the Vendees that thev have not entered into any agreement with anyone else fvr the said transfer of the said compensation right to be settled in award by the Land Acquisition Collector and references, revisions, appeals, etc. and they further admit and declare that if found and proved otherwise, then the Vendors shall be liable and responsible to make good the losses suffered by the Vendees and to repay the said received amount with costs and damages to the Vendees. The Vendees then shall be entitled to recover the said amount from the Vendors, their properties both moveable and immovable.

E

F

G

5. That the Vendors declare that the Deed which is executed by the Vendors in favour of the Vendees for that they are fully entitled to execute the same without consent of any other person/s are entitled o~ners of the sam~. ttie:y transferred their rights, titles and mterests and claims m H

764

SUPREME COURT REPORTS

[2011) 9 S.C.R

A

B

the same for ever in favour of the said Vendees. The heirs and successors of the Vendors will have no right to challenge it."

6. The other landowners appear to have executed a similar assignment deed in favour of S.S. Aggarwal and 5 others, who are appellants in the appeal arising out of SLP(C) No.18056/ 2003.

7. Although, the assignees were very much aware that claims filed by the landowners were pending before the Land c Acquisition Collector and in terms of paragraph 3 of the assignment deeds, they could apply for substitution, all of them deliberately kept quiet and did not produce assignment deeds before the Land Acquisition Collector, who ultimately passed award dated 11.10.1995 and fixed market value of the acquired land at the rate of Rs.98/- per square yard.

D

8. After announcement of the award, S.S. Aggarwal and 5 others filed an application under Section 18 of the Act for re- fixation of market value of the acquired land at the rate of Rs.10,000/- per square yard by asserting that they fall in the category of interested persons. Similar application was filed by Om Prakash and two others. The Collector did not make any inquiry on the issue of locus of S.S. Aggarwal and others to claim compensation and referred the matter to the Court. The Reference Court too did not inquire about the entitlement of S.S. Aggarwal and others to claim compensation and disposed of the reference by fixing market value of the acquired land at the rate of Rs.1,02,000/- per bigha.

E

F

9. Feeling dissatisfied with the determination made by the G Reference Court, S.S. Aggarwal and 5 others filed an appeal under Section 54 of the Act and claimed that even though they were entitled to enhanced compensation at the rate of Rs.2,00,000/- per bigha, but due to paucity of funds, they were limiting their claim to Rs.3,000/- per square yard. Similar appeal

H was filed by Om Prakash and 2 others.

-t

.. •

+

"-

_.

~

~-

¥"'

""

+

-Jo,

_ ..

t

_,;I

.. _

)

. >

-4

DELHI DEVELOPMENT AUTHORITY v. S.S. AGGARWAL & ORS. [G.S. SINGHVI, J.]

765

10. After four and a half years of filing the appeals, S.S. A

Aggarwal and 5 others filed C.M. No.1340 of 2002 under Order VI Rule 17 read with Section 151 CPC for amendment of the memo of appeal so as to enable them to claim compensation at the rate of Rs.7,000/- per square yard. Simultaneously, they deposited court fee of Rs.4,98,000/- by assuming that the High B Court will necessarily accept their prayer for amendment. Notice of the application was given to the counsel representing the Union of India on 5.9.2002, but no order was passed granting or refusing the prayer for amendment. The appeals were finally disposed of by the Division Bench of the High Court c vide judgment dated 21.2.2003 and market value of the acquired land w~s fixed at Rs.7,390/- per square yard. By an order of the sar;ile date, the Division Bench of the High Court 1allowed C.M. No'.1340 of 2002 in the following terms:

'

. "By this application amendment has been sought to the D memorandum of appeal. Such like applications have been decided in a number of cases by this Court .

. Amendment to the memorandum of appeal to claim higher amount of compensation has been sought on the ground E that while filing appeal, due to paucity of funds, the appellants could not claim proper amount of compensation though in the reference higher amount of compensation had been claimed by them.

Considering the facts and circumstances of the case and F the principle that a claimant must be paid fair amount of compensation in case his property is acquired for public purpose by the State and relying upon the ratio of the decisions of the Supreme Court in Harcharan Vs. State of Haryana AIR 1983 SC 43; Bhag Singh & Ors. Vs . G Union Territory of Chandigarh (1985) 3 SCC 737; Scheduled Caste Co-operative Land Owing Society Ltd. Bhatinda vs. Union of India and Others (1991) 1 SCC 174; Chand Kaur & Others Vs. Union of India (1994) 4 SCC 663; Gokal vs. State of Haryana AIR 1992 S.C. 150 H

766

SUPREME COURT REPORTS

[2011] 9 S.C.R.

A

and Buta Singh (Dead) by L.Rs. Vs. Union of India (1995) 5 sec 284 the prayer made in the application is allowed subject to the conditio .. ri of the appellant making good the deficiency in court fee within a period of four weeks, if not already made good."

B

11. Ms. Gita Luthra, learned senior counsel appearing for the Union of India assailed the impugned judgment mainly on the ground that the High Court committed serious error by entertaining the amendment application filed after a long time c gap of four and a half years. She relied upon the judgments of this Court in Buta Singh v. Union of India (1995) 5 SCC 284 and Union of India v. Pramod Gupta (2005) 12 SCC 1 and argued that the High Court should not have granted the prayer for amendment because the applicants had not given any tangible explanation for the long delay of four and a half years. D Ms. Luthra further argued that the High Court was not justified in disposing of the appeals whnout first deciding the amendment application and giving an opportunity to the acquiring authority and the ultimate beneficiary i.e. the DOA to contest the prayer made by S.S. Aggarwal and others for fixation of market value at the rate of Rs.7,000/- per square yard. Learned senior counsel then argued that the assignment deeds executed by the landowners constituted the best piece of evidence for determination of market value but the assignees deliberately withheld the same from the Land Acquisition F Officer, the Reference Court and the High Court and this, by itself, should be treated as a ground for remitting the matter to the Reference Court. Ms. Luthra further argued that the High Court committed serious error by awarding compensation over and above what was claimed in the amendment application and G that too without taking into consideration the fact that Om Prakash and others had not even filed an application for amendment of the memo of appeal.

E

12. Shri Amarendra Sharan, learned senior counsel appearing for the DOA argued that the impugned judgment is H liable to be set aside because the assignees had deliberately

...,

-t

* ..

..

....

" "

"

••

DELHI DEVELOPMENT AUTHORITY v. S.S. AGGARWAL & ORS. [G.S. SINGHVI, J.]

767

4

..

+ kept the Land Acquisition Collector, the Reference Court and A the High Court in dark about the assignment deeds under which chey claim to have purchased the right to get compensation by paying a meager sum of Rs.58/- per square yard to the landowners. Shri Sharan referred to Sections 23 and 28 of the Contract Act and argued that the assignment deeds are liable B to be treated as void because the same are not only opposed to public policy, but have the effect of defeating the objects of the Delhi Lands (Restrictions on Transfer) Act, 1972, which prohibit transfer of land after issue of notification under Section 4(1 ). In support of this argument,·Shri Amarendra Sharan relied c upon the judgments of this Court in Rattan Chand Hira Chand v. Askar Nawaz Jung (1991) 3 SCC 67, Murlidhar Dayandeo Kesekar v. Vishwanath Pandu Barde (1995) Supp. 2 SCC 549, Central Inland Water Transport Corporation v. Brojo Nath Ganguly (1986) 3 SCC 156 and Jayamma v. Maria Bai D (2004) 7 SCC 459. Shri Sharan lastly submitted that the landowners are entitled to just and reasonable compensation as of right and the assignees cannot take advantage of their better financial position to unduly enrich themselves by getting huge compensation.

+

~

E

• ..

.> .

...,j

13. Shri Dhruv Mehta, learned senior counsel appearing for S.S. Aggarwal and other assignees argued that the DOA does not have the locus to question the assignment deeds by invoking Article 14 of the Constitution and Sections 23 and 28 of the Contract Act because it was not a party before the F Reference Court. Shri Mehta emphasised that the assignment deeds are registered documents which were executed by the landowners with full knowledge of the consequence of assignment and it is not open to the Union of India and the ODA to indirectly question the transaction involving transfer of the G right to receive compensation. Shri Mehta relied upon the judgments in Dawson v. Great Northern and City Railway Company (1905) 1 KB 260, Sunrise Associates v. Government of NCT of Delhi (2006) 5 SCC 603 and unreported judgment of the Delhi High Court in Appeal No.140

H

768

SUPREME COURT REPORTS

[2011] 9 S.C.R.

A of 1972-Laxmi Narayan v. Union of India and another decided on 24.11.1977 and argued that the right to receive compensation is in the nature of property right and the same can be assigned by the owner of the property. Shri Mehta strongly supported the order passed by the High Court granting B leave for amendment of the claim by pointing out that the landowners had claimed compensation at the rate of Rs.4,000/ - and in the applications filed under Section 18, the assignees had clearly indicated that market value of the acquired land is at least Rs.10,000/- but due to paucity of funds, they had

c restricted the claim to Rs.3,000/- per square yard.

14. We have considered the respective submissions in the back drop of the fact that even though in terms of the assignment deeds, S.S. Aggarwal and others became entitled to seek substitution before the Land Acquisition Collector, they D neither sought impleadment in the award proceedings nor produced the assignment deeds to show that the landowners had transferred the right to receive compensation.

E

F

15. Learned senior counsel appearing for the assignees could not offer any tangible explanation as to why his clients chose to keep the Land Acquisition Collector, the Reference Court and the High Court in dark about the execution of the assignment deeds by the landowners. Therefore, it is reasonable to presume that they had done so deliberately and the only possible reason for this could be to avoid a proper scrutiny by the Land Acquisition Collector and two judicial forums about their entitlement to receive compensation at a rate higher than Rs.58/- per square yard paid to the landowners. If the assignment deeds had been produced before the Land Acquisition Collector or the Reference Court, either of them G could have held an inquiry and given an opportunity to the landowners and/or assignees to explain the position. By withholding the assignment deeds, the assignees succeeded in avoiding proper scrutiny of their claim for compensation at the hands of the Land Acquisition Collector, the Reference Court

H

1'-

~ ,.

-

t

...

)

•

"'-

r

•

DELHI DEVELOPMENT AUTHORITY v. S.S. AGGARWAL & ORS. [G.S. SINGHVI, J.]

769

~

and the High Court.

e

...

;,

16. In the aforesaid scenario, it will be just and proper to set aside the impugned judgment and remit the case to the Reference Court for fresh determination of the amount of compensation payable to the landowner and/or assignee after giving them reasonable opportunity of adducing evidence in support of their respective cases.

A

B

17. We also find merit in the submission of Ms. Gita Luthra that the High Court committed serious error by entertaining and allowing the amendment application filed by S.S. Aggarwal and c others. What has surprised us is that the High Court first decided the appeals filed by the assignees and then disposed of the amendment application and that too without going through the records. If this was not so, there was no occasion for the High Court to incorporate the condition of making good D the deficiency in court fee. By this process, the Union of India and the DOA were deprived of an important opportunity to make a request to the High Court to remit the case to the Reference Court or at least allow them to adduce evidence on the issue of correct market value of the acquired land. Another grave error E committed by the High Court in this regard was that it allowed the amendment application without even adverting to the issue of unexplained delay of 4 and half years .

18. In Union of India v. Pramod Gupta (supra), this Court considered the legality and propriety of granting prayer for F amendment in a case somewhat similar to the present one and observed:

"Delay and laches on the part of the parties to the proceedings would also be a relevant factor for allowing or disallowing an application for amendment of the pleadings. The High Court neither assigned sufficient .or cogent reasons nor applied its mind as regards the relevant factors while allowing the said application for amendment. It has also not been taken into consideration that the application for amendment of pleadings might not H

G

"'t

,,i

...

~

>

~~

770

SUPREME COURT REPORTS

[2011} 9 S.C.R.

A

B

c

D

E

F

G

H

have been maintainable in view of statutory interdict contained in sub-section (2) of Section 25 of the Act, if the same was applicable.

In Anoop Singh whereupon reliance has been placed by Mr Salve, the Division Bench of this Court did not have any occasion to consider that decisions of this Court in Krishi Utpadan Mandi Samiti v. Kanhaiya Lal and B.V. Reddy which, it will bear repetition to state, are authorities for the proposition that once it is held that Section 25(2) of the Act would be attracted in a given case, the parties are estopped and precluded from claiming any amount higher than that claimed in their claim petition before the Collector. An observation made to the effect that an application under Order6 Rule 17 would be maintainable having regard to Section 53 of the Act, with utmost respect, does not constitute a binding precedent. No ratio has been laid down therein and the observations made therein are without any discussion. Furthermore no reason has been assigned in support of the said proposition of law.

In Harcharan also this Court did not address the question as to whether Order 6 Rule 17 would be applicable in relation to the original claim petition or memo of appeal.

It may be true that not only the memorandum of appeal but also the reference was amended. Mr Rao pointed out that the necessary amendments have been carried out in the application for reference or memorandum of appeal. In terms of Order 6 Rule 18 of the Code of Civil Procedure, such amendments are required to be carried out in the pleadings by a party which has obtained leave to amend his pleadings within the time granted therefor and if no time was specified then within fourteen days from the date of passing of the order. The consequence of failure to amend the pleadings within the period specified therein as laid down in Order 6 Rule 18 of the Code is that the party shall not be permitted to amend its pleadings thereafter unless

4-

*

.,.

\,_

.. •

4-.

.~

..

-

DELHI DEVELOPMENT AUTHORITY v. S.S. AGGARWAL & ORS. [G.S. SINGHVI, J.]

771

the time is extended by the court. It is not in dispute that A such an order extending the time specified in Order 6 Rule 18 has not been passed."

19. In the result, the appeals are disposed of in the following

terms:

B .

(i)

The impugned judgment as also the one passed by the Reference Court are set aside.

(ii) The matter is remitted to the Reference Court for

fresh determination of the compensation payable to C the landowners and/or assignees. While doing so, the Reference Court should first decide the issue of locus of the assignees to claim compensation. If it is held that the assignees are entitled to step into the shoes of the landowners, then the Reference Court shall consider the value of the land mentioned D in the assignment deeds and decide what compensation should be paid for the acquired land.

(iii) The Reference Court shall give opportunity to the

parties to lead additional evidence in support of E their respective cases.

(iv)

In view of the law laid down in Delhi Development Authority v. Bhola Nath Sharma (2011) 2 SCC 54, the ODA shall be entitled to participate in the proceedings of the Reference Court and raise F objections against the claim made by the assignees for payment of compensation. The ODA shall also be entitled to raise all other legally permissible objections to contest the claim of the assignees.

20. Since the case is sufficiently old, we direct the Reference Court to decide the matter within a maximum period of one year from the date of receipUproduction of copy of this judgment.

·

G

N.J.

Appeals disposed of. H

Source wording is retained. Consult the source document for its original formatting and pagination.

Authorities

Authorities used by the court

Cases, legislation, regulations, and constitutional provisions identified in the available record.

Delhi Development Authority v. Bhola Nath Sharma (2011) 2 SCC 54

Case cited

Buta Singh v. Union of India (1995) 5 SCC 284; 1995 (3) SCR 359

Case cited

Union of India v. Pramod Gupta (2005) 12 SCC 1; 2005 (3) Suppl. SCR 48

Case cited

Rattan Chand Hira Chand v. Askar Nawaz Jung (1991) 3 SCC 67; 1991 (1) SCR 327

Case cited

Murlidhar Dayandeo Kesekar v. Vishwanath Pandu Barde (1995) Supp. 2 SCC 549

Case cited

Central Inland Water Transport Corporation v. Brojo Nath Ganguly (1986) 3 SCC 156; 1986 (2) SCR 278

Case cited

Jayamma v. Maria Bai (2004) 7 SCC 459; 2004 (3) Suppl. SCR 175

Case cited

Sunrise Associates v. Government of NCT of Delhi (2006) 5 SCC 603; 2006 (1) Suppl. SCR 421

Case cited

Dawson v. Great Northern and City Railway Company (1905) 1 KB 260

Case cited

Land Acquisition Act, 1894, Sections 18 and 54

Legislation

Legislation referenced in the available case record.

Civil Procedure Code, Order VI Rule 17 and Section 151

Legislation

Legislation referenced in the available case record.

Case-aware research

Ask AI about this case

The judgment and available research above are public. New questions open in a separate private conversation grounded in this case.

About this LexChat collection

This page organizes the available case record for research. Verify quotations, current status, and subsequent treatment against the source document. Corrections can be reported to hello@esheria.ai.

Legal information, not legal advice. Research summaries do not replace the judgment.