M/S. BHILAI REROLLERS ETC. ETC. versus MADHYA PRADESH ELECTRICITY BOARD AND ORS.
Installation and reading of MDI meter to record maximum demand in excess of contracted load is permissible under Section 26(7) of Indian Electricity Act, 1910 and contract; Board’s action justified in raising additional demand based on excess drawal detected by MDI meter; method technically valid and contractually recognized.
- Parties
- Appellant: MIS. Bhilai Rerollers; Respondent: Madhya Pradesh Electricity Board
- Jurisdiction
- India
- Judgment Date
- 19 August 2003
- Procedural Posture
- Civil Appeal / Final Disposition by Supreme Court
- Outcome
- Appeals dismissed
- Legal Topics
- Installation of MDI Meter, Contracted Load, Excess Demand, Tariff Enhancement, Writ Jurisdiction
Case Brief
Summary, issues, holding and outcome
More case intelligence is available
Unlock the full research layer for this judgment.
Parties
MIS. Bhilai Rerollers
Appellant
Madhya Pradesh Electricity Board
Respondent
Procedural Posture
Civil Appeal / Final Disposition by Supreme Court
Legal Issues
- 1 Whether installation and use of MDI meter to determine excess demand is permissible under statute and contract
- 2 Whether additional demand raised based on MDI meter is legal and justified
Ratio Decidendi
Installation and reading of MDI meter to record maximum demand in excess of contracted load is permissible under Section 26(7) of Indian Electricity Act, 1910 and contract; Board’s action justified in raising additional demand based on excess drawal detected by MDI meter; method technically valid and contractually recognized.
Court Disposition
Appeals dismissed
Orders
- Appeals dismissed; no costs.
Full Case Text
Judgment text and source record
Sign in to read
Sign in to read the full judgment text
Sign in to read the full judgment text. Downloads and additional research tools may depend on your plan.
Sign in to read the full judgment