M/18/096 Sisk/Designer Group Engineering/Designer Group FM (JV) [2019] IECompA m18096 (29 January 2019)
The Competition and Consumer Protection Commission determined that the proposed acquisition does not raise competition concerns and cleared the transaction under Phase 1.
- Parties
- Acquirer: Sicon Limited; Acquirer Subsidiary: John Sisk & Son (Holdings) Limited; Acquirer: Designer Group Engineering Contractors Holdings Designated Activity Company; Target: Designer Group FM Limited
- Jurisdiction
- Ireland
- Judgment Date
- 29 January 2019
- Procedural Posture
- Merger Clearance / Phase 1 Determination
- Outcome
- cleared
- Legal Topics
- Merger Control, Joint Control Acquisition
Case Brief
Summary, issues, holding and outcome
More case intelligence is available
Unlock the full research layer for this judgment.
Parties
Sicon Limited
Acquirer
John Sisk & Son (Holdings) Limited
Acquirer Subsidiary
Designer Group Engineering Contractors Holdings Designated Activity Company
Acquirer
Designer Group FM Limited
Target
Procedural Posture
Merger Clearance / Phase 1 Determination
Legal Issues
- 1 Whether the proposed acquisition of joint control of Designer Group FM Limited by Sicon Limited and Designer Group Engineering Contractors Holdings DAC raises competition concerns
Ratio Decidendi
The Competition and Consumer Protection Commission determined that the proposed acquisition does not raise competition concerns and cleared the transaction under Phase 1.
Court Disposition
cleared
Orders
- The proposed acquisition of joint control of Designer Group FM Limited by Sicon Limited and Designer Group Engineering Contractors Holdings DAC is cleared.
Full Case Text
Judgment text and source record
Sign in to read
Sign in to read the full judgment text
Sign in to read the full judgment text. Downloads and additional research tools may depend on your plan.
Sign in to read the full judgment