ZECON ENGINEERING & CONSTRUCTION SDN BHD POSCO ENGINEERING & CONSTRUCTION CO. LTD.
Defendant committed a repudiatory breach of the arbitration agreement by failing to request AIAC to appoint a substitute sole arbitrator within a reasonable time under the applicable KLRCA/AIAC rules after the original arbitrator withdrew; Plaintiff accepted the repudiation by filing the Originating Summons; accordingly the arbitration agreement was rendered inoperative as against the Defendant, entitling the Plaintiff to the declaratory relief and associated costs; the Stay Application under s10 AA 2005 was therefore dismissed.
- Citation
- WA-24C(ARB)-19-03/2024 (Mahkamah Tinggi)
- Parties
- Plaintiff: ZECON ENGINEERING & CONSTRUCTION SDN BHD; Defendant: POSCO ENGINEERING & CONSTRUCTION CO LTD
- Court
- ARB
- Jurisdiction
- Malaysia
- Judgment Date
- 21 October 2024
- Case Number
- WA-24C(ARB)-19-03/2024 (Mahkamah Tinggi)
- Procedural Posture
- Originating Summons (declaration & Injunction) / Judgment (grounds of Judgment)
- Outcome
- Declaration granted that the arbitration agreement is inoperative; interim injunction preserved status quo; Stay Application dismissed
- Legal Topics
- Arbitration Agreement Operability, Appointment of Arbitrator, Advance Preliminary Deposit (apd), Repudiatory Breach, Waiver and Abandonment, Stay of Proceedings S10 Arbitration Act 2005, Injunctions, Aiac/klrca Rules
- Source Language
- Malay/English
Case Brief
Summary, issues, holding and outcome
More case intelligence is available
Unlock the full research layer for this judgment.
Parties
ZECON ENGINEERING & CONSTRUCTION SDN BHD
Plaintiff
POSCO ENGINEERING & CONSTRUCTION CO LTD
Defendant
Procedural Posture
Originating Summons (declaration & Injunction) / Judgment (grounds of Judgment)
Legal Issues
- 1 Whether there was a breach of the arbitration agreement by failure to appoint a substitute arbitrator
- 2 Whether the arbitration agreement was rendered inoperative/null and void/incapable of being performed
- 3 Whether the Defendant abandoned or waived its rights to arbitrate
Ratio Decidendi
Defendant committed a repudiatory breach of the arbitration agreement by failing to request AIAC to appoint a substitute sole arbitrator within a reasonable time under the applicable KLRCA/AIAC rules after the original arbitrator withdrew; Plaintiff accepted the repudiation by filing the Originating Summons; accordingly the arbitration agreement was rendered inoperative as against the Defendant, entitling the Plaintiff to the declaratory relief and associated costs; the Stay Application under s10 AA 2005 was therefore dismissed.
Court Disposition
Declaration granted that the arbitration agreement is inoperative; interim injunction preserved status quo; Stay Application dismissed
Orders
- Declaration that the arbitration agreement originally entered between the Plaintiff and Posco Engineering Co Ltd is inoperative including as against the Defendant (prayer 1)
- Declaration in the alternative that the Defendant has abandoned or waived rights to proceed with arbitration (as alternative sought) - not necessary to decide further given primary declaration
Full Case Text
Judgment text and source record