Aventino Ecotroopers Joint Venture and Others v MEC for the Department of Roads and Transport, Gauteng Province and Others (1233/2023) [2025] ZASCA 32; 2025 (4) SA 419 (SCA) (31 March 2025)
The Court held that the Department lawfully extended the bid validity period by inviting all bidders to consent to extensions and excluding those who failed to respond or declined, as permitted by the supply chain management policy and s 38 of the PFMA. Aventino did not challenge the legality of this exclusionary regime. The Department was entitled to exclude Aventino from consideration based on substantiated evidence of misrepresentations in a prior tender, as found by the SIU and confirmed in Tribunal proceedings, and the prospective listing on the Treasury restricted supplier database. The exclusion was not based on irrelevant considerations, and the Department was not obliged to award...
- Citation
- [2025] ZASCA 32
- Parties
- Appellant: Aventino Ecotroopers Joint Venture; Appellant: All Afrika Group (Pty) Ltd; Appellant: Ecotroopers Construction (Pty) Ltd; Respondent: MEC for the Department of Roads and Transport, Gauteng Province; Respondent: Vea Road Maintenance and Civils (Pty) Ltd; Respondent: Lubocon Civils CC
- Court
- Supreme Court of Appeal
- Jurisdiction
- South Africa
- Judgment Date
- 31 March 2025
- Case Number
- 1233/2023
- Procedural Posture
- Civil Appeal / Appeal From Gauteng Division of the High Court, Pretoria
- Outcome
- Appeal dismissed with costs, including costs of two counsel where so employed.
- Judges
- Nicholls, Mbatha, Unterhalter, Musi, Molitsoane
- Legal Topics
- Public Procurement, Bid Validity Period, Disqualification of Bidders, Misrepresentation, Restricted Supplier Listing, Judicial Review
Case Brief
Summary, issues, holding and outcome
More case intelligence is available
Unlock the full research layer for this judgment.
Parties
Aventino Ecotroopers Joint Venture
Appellant
All Afrika Group (Pty) Ltd
Appellant
Ecotroopers Construction (Pty) Ltd
Appellant
MEC for the Department of Roads and Transport, Gauteng Province
Respondent
Vea Road Maintenance and Civils (Pty) Ltd
Respondent
Lubocon Civils CC
Respondent
Procedural Posture
Civil Appeal / Appeal From Gauteng Division of the High Court, Pretoria
Legal Issues
- 1 Did the tenders lapse due to invalid extension of the bid validity period?
- 2 Was Aventino unlawfully excluded from consideration for the tenders?
- 3 Is the Department's exclusion of Aventino based on irrelevant or unlawful considerations?
Ratio Decidendi
The Court held that the Department lawfully extended the bid validity period by inviting all bidders to consent to extensions and excluding those who failed to respond or declined, as permitted by the supply chain management policy and s 38 of the PFMA. Aventino did not challenge the legality of this exclusionary regime. The Department was entitled to exclude Aventino from consideration based on substantiated evidence of misrepresentations in a prior tender, as found by the SIU and confirmed in Tribunal proceedings, and the prospective listing on the Treasury restricted supplier database. The exclusion was not based on irrelevant considerations, and the Department was not obliged to award...
Court Disposition
Appeal dismissed with costs, including costs of two counsel where so employed.
Orders
- The appeal is dismissed with costs, including the costs of two counsel, where so employed.
Full Case Text
Judgment text and source record
Sign in to read
Sign in to read the full judgment text
Sign in to read the full judgment text. Downloads and additional research tools may depend on your plan.
Sign in to read the full judgment