South Africa Judgment

South Gauteng High Court, Johannesburg

City of Ekurhuleni Metropolitan Municipality v Sikhosana and Others (15245/2020) [2020] ZAGPJHC 176 (10 July 2020)

On this page

Professional case brief

Research organized from the available case record

Source document

01

Holding and result

The court found the matter to be urgent due to the threat of disruption to a public housing project and the potential for escalation. While the community's concerns about engagement and subcontractor selection were legitimate, their resort to threats and disruptive conduct was unacceptable. The City, however, was reminded of its constitutional obligation to engage meaningfully with affected communities. The court ordered a structured engagement process, with deadlines for meetings, reporting, and the filing of affidavits, and granted an interim interdict restraining the respondents from interfering with the project. Simultaneously, the City and its contractor were ordered to suspend work pending the final hearing, ensuring that the status quo was preserved and that the court would not be faced with a fait accompli.

Court disposition

Interim interdict granted; matter postponed for final hearing with structured engagement and reporting ordered.

Orders

  • The matter is declared urgent and non-compliance with the Uniform Rules of Court is condoned.
  • The matter is postponed to the Opposed Roll of 7 September 2020.
  • The applicant is directed to engage with the respondents and all interested parties to resolve the issues, with engagement to be completed by 17 July 2020, including a meeting between the MMC and community members.
  • The applicant must file a report with the court on the engagement process and its outcome by 24 July 2020, and may supplement its founding papers.
  • The respondents must file any answering affidavits by 5 August 2020.
  • The applicant must file any replying affidavit by 13 August 2020.
  • The parties must file heads of argument and practice notes by 21 August 2020.
  • Pending the hearing, the first to ninth respondents and any associated persons are interdicted from trespassing, gathering, intimidating, obstructing, disrupting, interfering, threatening, provoking, or performing acts of violence at the Daveyton Extension 14 housing project site, and from constructing dwellings or settling there.
  • Demonstrations or gatherings within 200 metres of the construction site are prohibited.
  • The applicant and tenth respondent are to suspend work at Daveyton Extension 14 pending the hearing.
  • The Ekurhuleni Metropolitan Police and South African Police Services are authorised to assist in securing the project site as needed.
  • Should new events arise requiring reconsideration before 7 September 2020, the parties may set the matter down on the same papers, duly supplemented.

02

Material facts

Parties

City of Ekurhuleni Metropolitan Municipality

Applicant Counsel: Mr Sithole

Rita Sikhosana

Respondent Counsel: In person

Luis Mbalane

Respondent Counsel: In person

Vusi Mngoni

Respondent Counsel: In person

Nomalungelo Mnqabashe

Respondent Counsel: In person

Christopher Motsipi

Respondent Counsel: In person

Olga Chiloane

Respondent Counsel: In person

Remembrance Conswa

Respondent Counsel: In person

Thandi Nkosi

Respondent Counsel: In person

The unknown individuals gathering & or trespassing at Farm 73 IR, Daveyton also known as Daveyton Extension 14

Respondent Counsel: In person

Motheo Construction Group (Pty) Ltd

Respondent

City of Ekurhuleni Metropolitan Police Department ("Daveyton")

Respondent

South African Police Services ("Daveyton")

Respondent

03

Procedural history

  1. Posture

    Urgent Application / Interim Interdict and Directions Pending Final Hearing

04

Questions and positions

Legal issues

Party arguments

Applicant
The City argued that the respondents' conduct, including threats of a 'total shutdown' and disruptive protests, endangered the continuation of the housing project. The City maintained that while engagement with the community was possible, the project could not be halted pending such engagement. The applicant sought urgent relief to prevent further obstruction and ensure the safety of employees and contractors.
Respondent
Ms Sikhosana, speaking for the community, explained that the memorandum threatening a shutdown was written in anger and apologized for its tone. The respondents expressed a desire for proper engagement and resolution of issues, stating that previous promises of community involvement had not been honored. They requested an opportunity to file affidavits, citing difficulties due to Covid-19 closures at police stations.

05

Court’s reasoning

  1. 01

    Section 152(1)(e) of the Constitution

    Local government must encourage the involvement of communities and community organisations in matters of local government.

  2. 02

    General principle of rule of law

    Courts cannot condone threats or forceful action as a means to resolve disputes; parties must seek legal remedies.

  3. 03

    Uniform Rules of Court; case law on urgency

    Urgency may justify deviation from the Uniform Rules of Court where immediate relief is necessary to prevent irreparable harm.

06

Ratio, limits and disposition

Ratio decidendi

The court found the matter to be urgent due to the threat of disruption to a public housing project and the potential for escalation. While the community's concerns about engagement and subcontractor selection were legitimate, their resort to threats and disruptive conduct was unacceptable. The City, however, was reminded of its constitutional obligation to engage meaningfully with affected communities. The court ordered a structured engagement process, with deadlines for meetings, reporting, and the filing of affidavits, and granted an interim interdict restraining the respondents from interfering with the project. Simultaneously, the City and its contractor were ordered to suspend work pending the final hearing, ensuring that the status quo was preserved and that the court would not be faced with a fait accompli.

Obiter and limits

  • The court emphasized that communities must seek legal remedies rather than resorting to force or intimidation.
  • The City, as the level of government closest to the people, has a particular obligation to transparency, responsiveness, and care.
  • Bona fide engagement is essential in projects with direct community impact, especially where feelings run high.

Court disposition

Interim interdict granted; matter postponed for final hearing with structured engagement and reporting ordered.

  • The matter is declared urgent and non-compliance with the Uniform Rules of Court is condoned.
  • The matter is postponed to the Opposed Roll of 7 September 2020.
  • The applicant is directed to engage with the respondents and all interested parties to resolve the issues, with engagement to be completed by 17 July 2020, including a meeting between the MMC and community members.
  • The applicant must file a report with the court on the engagement process and its outcome by 24 July 2020, and may supplement its founding papers.
  • The respondents must file any answering affidavits by 5 August 2020.
  • The applicant must file any replying affidavit by 13 August 2020.
  • The parties must file heads of argument and practice notes by 21 August 2020.
  • Pending the hearing, the first to ninth respondents and any associated persons are interdicted from trespassing, gathering, intimidating, obstructing, disrupting, interfering, threatening, provoking, or performing acts of violence at the Daveyton Extension 14 housing project site, and from constructing dwellings or settling there.
  • Demonstrations or gatherings within 200 metres of the construction site are prohibited.
  • The applicant and tenth respondent are to suspend work at Daveyton Extension 14 pending the hearing.
  • The Ekurhuleni Metropolitan Police and South African Police Services are authorised to assist in securing the project site as needed.
  • Should new events arise requiring reconsideration before 7 September 2020, the parties may set the matter down on the same papers, duly supplemented.

Source and reliance status

South Gauteng High Court, Johannesburg

This page organises the available record for research. Confirm quotations, current status, and subsequent treatment against the official source before relying on the case.

Judgment reading view

Judgment text

The complete available source text.

Source document

South Gauteng High Court, Johannesburg

Judgment

[2020] ZAGPJHC 176

IN

THE HIGH COURT OF SOUTH AFRICA

GAUTENG LOCAL DIVISION, JOHANNESBURG

CASE NO: 15245/2020

In the matter between:

CITY OF EKURHULENI METROPOLITAN MUNICIPALITY Applicant

and

RITA SIKHOSANA First Respondent

LUIS MBALANE Second Respondent

VUSI MNGONI Third Respondent

NOMALUNGELO MNQABASHE Fourth Respondent

CHRISTOPHER MOTSIPI Fifth Respondent

OLGA CHILOANE Sixth Respondent

REMEMBRANCE CONSWA Seventh Respondent

THANDI NKOSI Eighth Respondent

THE UNKNOWN INDIVIDUALS GATHERING & OR

TRESPASSING AT FARM 73 IR, DAVEYTON also known as

DAVEYTON EXTENSION 14, WITH THE INTENTION TO

PROVOKE

THE EMPLOYEE AND INTERFERE WITH THE

CONSTRUCTION WORK AT DAVEYTON EXTENSION 14 Ninth Respondent

MOTHEO CONSTRUCTION GROUP (PTY) LTD Tenth Respondent

CITY

OF EKURHULENI METROPOLITAN POLICE

DEPARTMENT (“Daveyton”) Eleventh Respondent

SOUTH

AFRICAN POLICE SERVICES (“Daveyton”) Twelfth Respondent

JUDGMENT

YACOOB J:

1. The applicant, the City of Ekurhuleni Metropolitan Municipality (“the City”), approaches this court on an urgent basis for an order interdicting the first to ninth respondents (“the community”) from acting in a manner that impedes the continuation of a project being carried out by the tenth respondent.

2. The project had previously been conducted by different service providers and carried out in consultation with the community, but it had ground to a halt for various reasons and the City has now appointed the tenth respondent who has attempted to resume operations. The community has objected to the process and also to the manner in which the tenth respondent has identified subcontractors.

3. During approximately the third week of June work was disrupted by protests. On 24 June a memorandum was delivered which demands that the project continue with community involvement as had previously been promised to the community by the MMC of Human Settlements, Mme Lesika, failing which there would be “total shutdown”.

4. On the back of this obvious threat the City approached the Court. I am satisfied that the matter is clearly urgent.

5. The community was not legally represented at the hearing nor were any affidavits filed. However certain of the members of the community were present in person at court, including the first, third, fourth and fifth respondents, and the first respondent, Ms Sikhosana, spoke on their behalf. I pause to note that, as with most matters at present, the matter was heard by means of video conference, and a link was made available in court to allow the community to join the hearing.

6. Ms Sikhosana communicated that the respondents would like to file an affidavit and in fact had attempted to attest to one but that two police stations they had attended were closed due to Covid-19. She said that the memorandum had been written in anger and that they apologised for the threat of total shutdown. They simply wanted engagement and they wanted things to be done properly. According to her the community wants to resolve the issues.

7. In response it was submitted by Mr Sithole for the City that the MMC was more than happy to engage but that the project could not be halted in the meantime. On being asked to provide a date on which the MMC could meet with the community he obtained instructions to the effect that 17 July would be possible.

8. It is unacceptable for the community to use force in order to coerce the City to engage with it and to try and get its way. The court cannot condone threats made by the community. Communities and all members of our society must be encouraged to turn to the courts rather than to forceful action when there is a problem.

9. On the other hand the City cannot rely on its better resources to bulldoze its decisions through particularly in a matter with a history of consultation and community involvement.

10. In addition when the City agrees to engage with the Community but insists that the project will continue in the meantime, questions arise about the bona fide nature of that engagement. The City, as the level of government closest to the people, has a particular obligation to transparency, responsiveness and care.

11. In terms of section 152(1)(e) of the Constitution an object of local government is “to encourage the involvement of communities and community organisations in the matters of local government”.

12. This applies particularly in a project which has a direct impact on the community, and in a situation in which community feeling is particularly high.

13. In my view bona fide engagement is essential, and it is necessary if the engagement does not result in a resolution for these important issues to be fully ventilated in and decided by a court.

14. For these reasons I consider it to be in the interests of justice to make an order which will hopefully foster the extra curial resolution of the matter, and if not, will allow all the issues to be properly ventilated before a court in due course, where that court is not hamstrung by the fact that the project is now a fait accompli.

15. Mr Sithole informs me that a date has been obtained on the opposed roll of 7 September. The matter can therefore be postponed to that date.

16. For these reasons, I make the following order:

(1) The matter is urgent and the applicant’s failure to adhere to the Uniform Rules of Court is condoned.

(2) The matter is postponed to the Opposed Roll of 7 September 2020.

(3) The applicant is directed to engage with the respondents and all interested parties with a view to reaching a resolution of the issues. This engagement process is to be completed by 17 July 2020, including a meeting between the MMC and community members and any other meetings that are considered appropriate.

(4) The applicant is directed to file a report with this court setting out the processes undertaken in the engagement, and the outcome thereof, by 24 July 2020. The applicant may simultaneously supplement its founding papers if necessary.

(5) The respondents are to file any answering affidavits to the founding affidavit, the report and any supplementary affidavit, by Wednesday 05 August 2020.

(6) The applicant is to file any replying affidavit by Thursday 13 August 2020.

(7) The parties are to file heads and practice notes by Friday 21 August 2020.

(8) Pending the hearing of this matter on 7 September 2020 or any other date to which it may otherwise be postponed, the first to ninth respondents and any person associated with them are interdicted from

a. trespassing, invading and or gathering at the construction site described as Remaining Extent of farm, Daveyton No. 73 also known as “Daveyton Extension 14 housing project” for the purposes of: -

b. intimidating, obstructing, disrupting, interfering and threatening, provoking the applicant’s employees and or the employees of the tenth respondent.

c. performing any act of violence or causing violence or making any threat or instigating any threat by any other means, such as throwing stones to any authorised persons at Daveyton Extension 14.

d. instigating any person or member of the public to perform acts designed to intimidate, obstruct, disrupt or interfere with the applicant’s appointed contractors’ employees together with its subcontractors.

e. conducting demonstration or gathering at any place closer than 200 metres from the perimeter of any of the Daveyton Extension 14 construction site and

f. from invading and attending to Daveyton Extension 14 for the purposes of constructing their own top structures “dwellings” in order to settle or reside in.

(9) Pending the hearing of this matter on 7 September 2020 or any other date to which it may otherwise be postponed, the applicant and the tenth respondent are to suspend work at Daveyton Extension 14.

(10) The members of the Ekurhuleni Metropolitan Police and of the South African Police Services are authorised to assist the applicant

in securing the Daveyton Extension 14 housing project in accordance with this order should the need arise.

(11) Should any new event occur which requires this order to be revisited before 7 September 2020, the parties may set the matter down on the same papers duly supplemented.

____

S YACOOB

JUDGE OF THE HIGH

COURT

GAUTENG LOCAL DIVISION, JOHANNESBURG

Appearances:

For the applicant: Mr Sithole

Instructed by: Tshivhase Kinstler Attorenys

For the first to ninth respondents: In person.

Source wording is retained. Consult the source document for its original formatting and pagination.

Authorities

Authorities used by the court

Cases, legislation, regulations, and constitutional provisions identified in the available record.

Constitution of the Republic of South Africa, 1996

Legislation

Legislation referenced in the available case record.

Case-aware research

Ask AI about this case

The judgment and available research above are public. New questions open in a separate private conversation grounded in this case.