Free State High Court, Bloemfontein

Eskom Holdings v Lesole Agencies CC; In re: Lesole Agencies v Eskom Holdings (2555/2016) [2017] ZAFSHC 171 (28 September 2017)

On this page

Professional case brief

Research organized from the available case record

Source document

01

Holding and result

The court found that the conditions of the contract document (annexure 'A') clearly prescribe the processes to be followed for the conclusion of a contract. Where the mode of acceptance is stipulated, it must be followed for a contract to be valid. The plaintiff's particulars of claim were found to be vague and embarrassing, as they relied on an unsigned contract and contradictory versions of the agreement. The first exception was upheld, granting the plaintiff an opportunity to amend its summons and particulars of claim. The court declined to decide the second exception concerning the interpretation of the limitation of liability clause, holding that such questions should be determined at trial after hearing evidence.

Court disposition

First exception upheld with costs; plaintiff granted leave to amend particulars of claim within fifteen days.

Orders

  • The first exception is upheld with costs.
  • The plaintiff is granted an opportunity to remove the cause of the complaint within fifteen (15) days from the date of this order to amend its summons and particulars of claim.
  • Failing amendment, the defendant is granted leave to approach the court without further notice for the striking out of the summons and particulars of claim.

02

Material facts

Parties

Eskom Holdings

Defendant Counsel: C Snyman

Lesole Agencies CC

Plaintiff Counsel: S Grobler

Amounts and remedies

  • Claimed Damages: ZAR 1,580,000

03

Procedural history

  1. Posture

    Civil Procedure / Exception to Particulars of Claim

04

Questions and positions

Legal issues

Party arguments

Applicant
The defendant argued that the particulars of claim are vague and embarrassing, as the plaintiff relies on an unsigned contract document (annexure 'A') and pleads contradictory versions of the agreement (written, oral, or partly both). The defendant contended that the contract required a specific mode of acceptance, which was not followed, and that the variation clause precludes reliance on implied or tacit terms. The defendant claimed prejudice in having to plead and prepare for trial on uncertain grounds.
Respondent
The plaintiff argued that sufficient facts were pleaded to establish a contract, whether written, oral, or partly both, and that it is permissible to plead a written agreement even if the signed copy is in the possession of the defendant. Regarding the limitation of liability clause, the plaintiff contended that limiting indirect or consequential loss to zero rand does not constitute a waiver of the right to claim such damages, and that the intention of the parties should be determined after hearing evidence.

05

Court’s reasoning

  1. 01

    Erasmus: Superior Court Practice, Volume 2 at BI-154 to B1-154A

    An exception that a pleading is vague and embarrassing will not be allowed unless the excipient will be seriously prejudiced if the offending allegations are not expunged. The onus is on the excipient to show both vagueness amounting to embarrassment and embarrassment amounting to prejudice.

  2. 02

    Murray & Roberts Construction Ltd v Final Properties (Pty) 1991 (1) SA 508 (A) at 514 E-F

    A commercial document executed by the parties with a clear intention that it should have commercial operation should not lightly be held to be ineffective.

  3. 03

    Sun Packing (Pty) Ltd v Vreulink 1996 (4) 176 (A); Francis v Sharp and Others 2004 (3) SA 230 CPD

    Courts are reluctant to decide upon exception questions concerning the interpretation of a contract. Exceptions are generally not an appropriate vehicle for resolving such disputes.

  4. 04

    Lepogo Construction (Pty) Ltd v Govan Mbeki Municipality [2015] 1 All SA 153 (SCA); Westingham Brake & Equipment (Pty) Ltd v Bilger Engineering (Pty) Ltd 1986 (2) SA 555 (A) at 573 F

    Where a proposed contract stipulates the mode of acceptance, that mode must be followed before a contract is concluded. An offeror may prescribe the mode of acceptance to create a binding legal relationship.

06

Ratio, limits and disposition

Ratio decidendi

The court found that the conditions of the contract document (annexure 'A') clearly prescribe the processes to be followed for the conclusion of a contract. Where the mode of acceptance is stipulated, it must be followed for a contract to be valid. The plaintiff's particulars of claim were found to be vague and embarrassing, as they relied on an unsigned contract and contradictory versions of the agreement. The first exception was upheld, granting the plaintiff an opportunity to amend its summons and particulars of claim. The court declined to decide the second exception concerning the interpretation of the limitation of liability clause, holding that such questions should be determined at trial after hearing evidence.

Obiter and limits

  • Courts are generally reluctant to resolve contractual interpretation disputes by way of exception; such matters are best determined at trial.
  • The intention of the parties and the meaning of contractual clauses should be established after evidence is led as to the background and surrounding circumstances.

Court disposition

First exception upheld with costs; plaintiff granted leave to amend particulars of claim within fifteen days.

  • The first exception is upheld with costs.
  • The plaintiff is granted an opportunity to remove the cause of the complaint within fifteen (15) days from the date of this order to amend its summons and particulars of claim.
  • Failing amendment, the defendant is granted leave to approach the court without further notice for the striking out of the summons and particulars of claim.

Source and reliance status

Free State High Court, Bloemfontein

This page organises the available record for research. Confirm quotations, current status, and subsequent treatment against the official source before relying on the case.

Judgment reading view

Judgment text

The complete available source text.

Source document

Free State High Court, Bloemfontein

Judgment

[2017] ZAFSHC 171

IN THE HIGH COURT OF SOUTH AFRICA,

FREE STATE DIVISION, BLOEMFONTEIN

Case number: 2555/2016

In the matter between:

ESKOM

HOLDINGS

Excipient

and

LESOLE

AGENCIES CC

Respondent

IN

RE

LESOLE

AGENCIES CC

Plaintiff

ESKOM

HOLDING

Defendant

HEARD ON: 30 June 2017

DELIVERED ON: 28 September 2017

MHLAMBI, J

[1] The defendant excepted to the plaintiff’s combined summons and the particulars of claim on the basis that it cannot plead to them because the said particulars of claim were vague and embarrassing, alternatively, lacked averments to sustain a cause of action, alternatively, did not disclose a cause of action.

[2] The following two exceptions were raised to the plaintiff’s cause of action premised on the following grounds:

The first exception:

2.1 that the plaintiff during or about June, alternatively during July 2014, submitted a quotation and a written tender to the defendant following an invitation and/or request by the defendant to submit such a tender and quotation for construction works that the defendant named “Complete renovations to existing buildings at Jordan”, a copy of which was annexed as annexure “A” to the particulars of claim; and

2.2 that on or about June 2014, the plaintiff was informed that its quotation had been accepted and that during the same period at Bloemfontein, a written, alternatively an oral, in the further alternative a partly written, partly oral contract was concluded;

2.3 while annexure “A” to the plaintiff’s summons and particulars of claim was not signed by or on behalf of the defendant.

2.4 annexure “A” to the plaintiff’s summons and particulars of claim clearly stated that “ Notwithstanding anything contained herein, this Agreement comes into effect on the date when the tenderer receives one fully completed copy of this document, including the Schedule of Deviations (if any) together with all the terms of the contract listed above…” and notwithstanding the plaintiff averring in its particulars of claim that “ …Plaintiff is not in possession of a signed copy of this document and believes a signed by it copy is in the possession of the Defendant…” wished to rely on such annexure “A”, either in part or in total to set up a cause of action against the defendant in the present proceedings.

The second exception:

2.5 The plaintiff’s cause of action was premised on the allegations that as a result of the defendant’s alleged repudiation of the agreement as pleaded and as set out in the plaintiff’s particulars of claim, the plaintiff suffered damages in the amount of R1 580 000.00 which was allegedly due and payable.

2.6 Annexure “A” to the plaintiff’s particulars of claim, which seemingly constituted the agreement or at least a part of the written agreement on which the plaintiff’s cause of action is premised, stipulated in paragraph Z9.1 that the Employer’s liability to the plaintiff as the contractor, for indirect or consequential loss, was limited to zero rand.

The plaintiff’s contentions

[3] With reference to the first exception, the plaintiff contended that facts were pleaded which gave rise to the contract and because of the background facts, a written, alternatively oral, in the further alternative, partly written, partly oral contract was concluded and that the contract was in writing as per annexure “A” – including parts C1, C2, C3 and C4 by reference. The second component of the complaint that annexure “A” was unsigned by ESKOM ignored the allegation in paragraph 9 of the particulars of claim that the plaintiff was not in possession of a signed copy of the document and believed that such a signed copy was in the possession of ESKOM. This, the plaintiff contended, was a perfectly permissible way of pleading a written agreement.

[4] It was contended furthermore that the contractual clause stating that the contractor’s indirect or consequential loss is limited to R0.00 (zero rand) means that there is no limit at all. The contract evidences no waiver of a right to claim consequential damages as this would mean that the plaintiff is nonsuited. The pleading cannot be vague on the basis of this contractual term. The intention of the parties is a matter of substantive law, determined after evidence is led as to the background and the surrounding circumstances.

The Short Contract (ECSC3)

[5] Under the heading: C1 Agreements & Contract Data and the sub-heading: C1.1 Form of Offer and Acceptance, the following is

stated:

“This offer may be accepted by the Employer by signing the form of Acceptance overleaf and returning one copy of this document including the Schedule of Deviations (if any) to the tenderer before the end of the period of validity stated in the Tender Data, or other period as agreed, whereupon the tenderer becomes the party named as the Contractor in the conditions of the contract identified in the Contract Data.” Under the heading Acceptance, the following is stated: “By signing this part of this Offer and Acceptance, the Employer identified below accepts the tenderer’s Offer…….. Acceptance of the tenderer’s Offer shall form an Agreement between the Employer and the tenderer upon the terms and conditions contained in this Agreement and in the Contract that is the subject matter of this Agreement.”

[6] The defendant contended that in as far as annexure “A” bars any written, oral and/ or implied terms thereto (a so-called

variation clause), no reliance can be placed on tacit or implied terms to the alleged agreement on which the plaintiff’s cause of action is premised. The defendant’s prejudice is obvious as it is not only uncertain on which contradictory version the plaintiff wishes to rely at the trial to sustain a cause of action, but will be put to the effort and expense of a plea and preparation for trial if the particulars of claim remain in their present form.

Applicable principles

[7] An exception that a pleading is vague and embarrassing will not be allowed unless the excipient will be seriously prejudiced if the offending allegations were not expunged[1]. The onus is on the excipient to show both vagueness amounting to embarrassment and embarrassment amounting to prejudice. The court

would not decide by way of exception the validity of an agreement relied upon or whether a purported contract may be void for vagueness.

[8] A commercial document executed by the parties with a clear intention that it should have commercial operation, should not lightly be held to be ineffective[2]. As a rule, courts are reluctant to decide upon exception questions concerning the interpretation of a contract[3]. While it is the function of the courts to resolve ambiguities and uncertainties in disputed contractual terms, the exception is

generally not an appropriate vehicle for resolving such disputes[4].

Application of the principles

[9] The plaintiff’s case depends upon the establishment of a contractual relationship between it and the defendant. The conditions

set out in annexure “A”, the contract document, clearly prescribe the processes to be followed in order to conclude a contract upon which one of the parties could rely to found a proper claim[5]. Where, in a proposed contract, the mode of acceptance is stipulated, it is that mode that must be followed before a contract is concluded. An offeror may always prescribe the mode of acceptance of his offer in order that a vinculum juris should be created[6].

[10] Conflicting interpretations may arise as to what was intended by paragraph Z9.1 of the contract, but questions which may arise in that regard are to be determined at the hearing of the matter and are not capable of being disposed of by way of exception.

Conclusion

[11] It is clear that the conditions of the contract set out how it was to be concluded and the formalities to be followed. However, I am reluctant to decide upon the second exception concerning the interpretation of the contract and that this question will be determined at the hearing of the matter. In the premises, the first exception must succeed and the following order is therefore made:

ORDER

1. The first exception is upheld with costs;

2. The plaintiff is granted an opportunity to remove the cause of the complaint within fifteen (15) days from the date of the granting of this order to amend its summons and the particulars of claim, failing which the defendant is granted leave to approach this court without further notice for the striking out of the summons and the particulars of claim.

____

Counsel for the defendant: Adv. C Snyman

Instructed by:

L E Companie

Phatshoane Henney Inc.

Cnr Markgraaff & Kellner Streets

BLOEMFONTEIN

Counsel for Respondents: Adv. S Grobler

Instructed by:

L Bradley

Peyper Attorneys

Dynarc House

200 Nelson Mandela Drive

BLOEMFONTIEN

[1] Erasmus: Superior Court Practice, Volume 2 at BI-154 to B1-154A

[2] Murray & Roberts Construction Ltd V Final Properties (Pty) 1991 (1) SA 508 (A) at 514 E-F

[3] Sun Packing (Pty) Ltd v Vreulink 1996 (4) 176 (A)

[4] Francis v Sharp and Others 2004 (3) SA 230 CPD

[5] Lepogo Construction (Pty) Ltd v Govan Mbeki Municipality [2015] 1 All SA 153 (SCA)

[6] Westingham Brake & Equipment (Pty) Ltd v Bilger Engineering (Pty) Ltd 1986 (2) SA 555 (A) at 573 F

Source wording is retained. Consult the source document for its original formatting and pagination.

Authorities

Authorities used by the court

Cases, legislation, regulations, and constitutional provisions identified in the available record.

Murray & Roberts Construction Ltd v Final Properties (Pty) 1991 (1) SA 508 (A) at 514 E-F

Case cited

Sun Packing (Pty) Ltd v Vreulink 1996 (4) 176 (A)

Case cited

Francis v Sharp and Others 2004 (3) SA 230 CPD

Case cited

Lepogo Construction (Pty) Ltd v Govan Mbeki Municipality [2015] 1 All SA 153 (SCA)

Case cited

Westingham Brake & Equipment (Pty) Ltd v Bilger Engineering (Pty) Ltd 1986 (2) SA 555 (A) at 573 F

Case cited

Case-aware research

Ask AI about this case

The judgment and available research above are public. New questions open in a separate private conversation grounded in this case.