Fountain Civil Engineering (Pty) Ltd v Mhlathuse Water and Others (10138/04) [2004] ZAKZHC 14 (24 January 2004)
- Citation
- [2004] ZAKZHC 14
- Status
- Judgment
- Jurisdiction
- South Africa
- Court
- High Courts - Kwazulu Natal
- Panel
- Hugo
- Case number
- 10138/04
More details
- Court
- High Courts - Kwazulu Natal
- Panel
- Hugo
- Case number
- 10138/04
On this page
Professional case brief
Research organized from the available case record
01
Holding and result
The court found that the applicant failed to complete the required contract participation goal calculations as stipulated in the tender documents. The instructions to tenderers made it clear that failure to complete and sign all required forms could render a tender non-responsive and subject to rejection. The Preferential Procurement Policy Framework Act and the Constitution require strict compliance with prescribed procedures to ensure fairness and transparency in public procurement. The applicant's omission constituted a material deviation from the tender requirements, and the first respondent was justified in disqualifying the tender. The court held that the procurement process was conducted lawfully and that the applicant was not entitled to the relief sought.
Court disposition
Application dismissed; the tender award to the second and third respondents stands.
Orders
- The application is dismissed.
- The applicant is not entitled to be appointed as contractor.
- The applicant is ordered to pay the costs of the application.
02
Material facts
Parties
Fountain Civil Engineering (Pty) Ltd
Applicant Counsel: Adv M SnymanMhlathuze Water
Respondent Counsel: Adv C J Pammenter SC with Adv L NaidooMurray & Roberts Construction (Pty) Ltd
RespondentMakhubu Civil
Respondent03
Procedural history
Posture
Urgent Application / Application for Review and Urgent Relief
04
Questions and positions
Legal issues
- 01
Whether the applicant's tender was lawfully disqualified for failing to complete the tendered goal calculations.
- 02
Whether the first respondent complied with the requirements of the Preferential Procurement Policy Framework Act and the Constitution in its tender process.
- 03
Whether the applicant is entitled to have the tender award set aside and be appointed as contractor.
Party arguments
- Applicant
- The applicant contended that its tender should not have been disqualified for failing to complete the contract participation goal calculations, as it did not intend to claim any bonus participation points and was content to rely solely on the price component. The applicant argued that the relevant annexure was optional and that its omission did not render the tender non-responsive. It sought urgent review and setting aside of the award to the second and third respondents, and requested that it be appointed as contractor.
- Respondent
- The first respondent argued that the tender instructions clearly required completion and submission of all forms, including the contract participation goal calculations, and that failure to do so rendered the tender non-responsive and liable to rejection. The respondent maintained that the procurement process was conducted in accordance with the Preferential Procurement Policy Framework Act and the Constitution, and that the applicant's omission constituted a material deviation justifying disqualification.
05
Court’s reasoning
Legal principles
- 01
Section 217(1) of the Constitution, Act 108 of 1996
Procurement by organs of state must be conducted in accordance with a system that is fair, equitable, transparent, competitive, and cost-effective.
- 02
Preferential Procurement Policy Framework Act 5 of 2000, Section 1
A tender which does not comply with the specifications and conditions set out in the tender document is not an acceptable tender.
- 03
Tender Instructions, Section 9
Failure to complete and sign all required forms may render a tender non-responsive and lead to its rejection.
- 04
Tender Instructions, Clause 2.33.4.1
A responsive tender is one which conforms to all terms, conditions, and specifications of the contract without material deviation or qualification.
06
Ratio, limits and disposition
Ratio decidendi
The court found that the applicant failed to complete the required contract participation goal calculations as stipulated in the tender documents. The instructions to tenderers made it clear that failure to complete and sign all required forms could render a tender non-responsive and subject to rejection. The Preferential Procurement Policy Framework Act and the Constitution require strict compliance with prescribed procedures to ensure fairness and transparency in public procurement. The applicant's omission constituted a material deviation from the tender requirements, and the first respondent was justified in disqualifying the tender. The court held that the procurement process was conducted lawfully and that the applicant was not entitled to the relief sought.
Obiter and limits
- The court noted that organs of state must adhere strictly to procurement procedures to maintain public confidence in the fairness of tender processes.
- The applicant's misunderstanding of the requirements did not excuse non-compliance with mandatory tender conditions.
Court disposition
Application dismissed; the tender award to the second and third respondents stands.
- The application is dismissed.
- The applicant is not entitled to be appointed as contractor.
- The applicant is ordered to pay the costs of the application.
Source and reliance status
High Courts - Kwazulu Natal
This page organises the available record for research. Confirm quotations, current status, and subsequent treatment against the official source before relying on the case.
Judgment reading view
Judgment text
The complete available source text.
High Courts - Kwazulu Natal
Judgment
IN
THE HIGH COURT OF SOUTH AFRICA
NATAL
PROVINCIAL DIVISION
CASE NO : 10138/04
In the matter between :
FOUNTAIN CIVIL ENGINEERING (PTY) LTD Applicant
And
MHLATHUZE
WATER First Respondent
MURRAY &
ROBERTS CONSTRUCTION
(PTY) LTD Second Respondent
MAKHUBU CIVIL
Third Respondent
J
U D G M E N T
HUGO J .
During August 2004 the First Respondent advertised a tender was to supply and erection of certain pipes from Empangeni to Richardsbay.
It is common cause that the First Respondent is a organ of state as defined in the PERFERATION PROCUREMENT POLOCIY FRAMEWORK ACT NO 5 OF 2000 and as such is bound by the provisions of that act and its figurations.
This Act was being published in terms of Section 217(3) of The Constitution, Act 108 of 1996. Section 217 of the constitution provides as follow:
â217. (1) When an organ of state in the national, provincial or local sphere of government, or any other institution identified in national legislation, contracts for goods or services, it must do so in accordance with a system which is fair, equitable, transparent, competitive and cost-effective.
(2) Subsection (1) does not prevent the organs of state or institutions referred to in that subsection from implementing a procurement policy providing for â
(a) categories of preference in the allocation of contracts; and
(b) the protection or advancement of persons, or categories of persons, disadvantaged by unfair discrimination.
(3) National legislation must prescribe a framework within which the
policy referred to in subsection (2) may be implemented.â
Sect 1 of Act 5 of 2000 (PPPN) defines a quote âacceptable tenderâ as âany tender which in all respects comply with the specifications and conditions of tender as set out in the tender document.â
The Applicant and ten of eleven other interpleads a tender in respect of this advertisement. The applicant did not succeed and the tender was awarded to Second Respondent.
The Applicant has expressed its dissatisfaction at this state of affairs by launching the present application as a matter of urgency. The applicant applies for the following relief :
â1. That the requirement for service and notice in terms of Rule 6(12) be dispense with and that the application be heard in a matter of urgency.
2. Reviewing and setting aside the discussion of the First Respondent to disqualify the Applicant from the tender alternatively the First Respondent failure to take the Applicants tender into consideration.
3. That Applicant be appointed as the contractor and be awarded the tender and the contract number 557/001/2004 for the Empangeni Regional Effluent Handling and Disposal System.
4. Alternatively to par 1,2 and 3 above at the decision of the First Respondent to award contract number 557/001/2004 for the Empangeni Regional Effluent Handling and Disposal System to the Second and Third Respondent as a joint venture dated 8 November 2004 be reviewed and set aside.
5. That Second and Third Respondent be ordered to pay the costs of the application.â
The Second and Third Respondents do not joined the fray. It appears from the papers that the Applicants tender was not considered and was disqualified because it did not âcomplete and submit the tendered goal calculations.â
Contained in the structions to tenderers are the following paragraphs
2.6
TENDER
DOCUMENTS
âComplete set of tender documents comprises.
One bound contract document.
One copy of each of the drawings listed in the list of drawings.
Four pages of the document are numbered and tenderers shall check for omissions of duplications and shall satisfy themselves with the clarity and tent of consistency of the document of obtaining if necessary, corrections or explanations from the engineer in writing.
â¦.. Failure to complete and sign all of the required forms contained under Section 9 of the document may render the tender non responses and lead to its rejection.â
2.16 REJECTION OF
TENDERS
Any tender which does not comply with the Instructions to Tenderers may be regarded and incomplete and may be rejected.
The Employer does not bind itself to accept the lowest or any tender.â
2.33.3.1 âThe minimum Contract Participation Goal percentage (Ds) is 10%.
2.33.3.2 The maximum Contract Participation Goal percentage above which no further adjudication points will be awarded (X) is 35%.
2.33.3.3 A Tender will qualify for tender adjudication points if its tendered Contract Participation Goals exceed the minimum set in 3.1 above.â
Of particular importance in this regard are the provisions of clause 2.33.4.1 âExamination of Tenders and Determination of Responsiveâ (Sick)
Prior to the detailed evaluation of tenders, each tender will be examined to establish it: (sick)
⢠meets the requirements of the Conditions of Tender;
has been properly sighed;
is responsive to the requirements of the Contract document;
provides any clarification and/or substantiation required;
complies with the tender submission requirements in all other respects.
A responsive tender is one, which conforms to all the terms, Conditions and Specifications of the Contract without material deviation or qualification. A material deviation or qualification is one which;
Could detrimentally affect the scope, quality, or performance of the Work
Changes risks and responsibilities under the Contract for any of the parties involved with the Contract; or
Would affect the competitive position of other Tenderers presenting responsive tenders, if it were to be rectified.
If the Tender does not meet the requirements or is not responsive, it is liable to be rejected by the Employer, and may not subsequently be made acceptable to the Employer by correction or withdrawal of the non-conforming deviation or reservation.â
It is common cause that the Applicant did not fill in that section of the contract document that deals with incremetation of targeted procurement. There is a considerable amount of documentation in the contract documents dealing with the so-called tendered goal calculation. Catogot has been pointed out however that this set of documents is headed as follows:
NOTE: This annex may be used by Tenderer calculate their expected contract participation goal for the given contract. Employers may use this annex to assist them in understanding how the Tenderer intents achieving his goal obligations in the performance of the contract.
As I have said the applicant did not full in the document and has argued that it was not necessary for it to have done so because he did not intend to claim any bonus participation points.
However it is common cause that the applicant is not and affirmable business enterprise (ABE) as intended in the contract documents. It is also common cause that the Applicants did not intend subcontracting with or entering their adventures with any such enterprises. In terms of Section 2 of the PPPF Act provides that a preference point system must be followed by in particular in 2(1)(3) provides that âfor contracts with a rand value above the prescribed amount, a maximum of 10 points may be allocated for specific goals is contemplated in paragraph (d) provided that the lowest acceptable tenders scores 90 points for price.â
Section 2(1)(d) provides that the specific goals may include
(i) contracting with persons or categories of persons, historically disadvantage by unfair discrimination on the basis of race, gender or disability.â
The applicant is and was content to rely only on the 90 points which it was allegedly entitled to having tendered the lowest price and did not intent claiming any additional preference points bases upon its ABE status for its intentions to contract with peolpe
DATE OF TRIAL : 6 January 2004
COUNSEL FOR THE APPLICANT : Adv M Snyman instructed by, M J Hood and Associates
COUNSEL
FOR THE
1st RESPONDENT : Adv C J Pammenter SC with Adv L Naidoo instructed by Shepstone & Wylie