Molefe and Another v Merafong Local Municipality and Others (63816/2017) [2017] ZAGPPHC 1088 (17 October 2017)
The court found that the implementation of the previous order, specifically the reduction of water pressure and restricted supply hours, had resulted in the deprivation of water to residents in higher areas of Blyvooruitzicht. The evidence, including the Wetcon engineering report, demonstrated that limiting pressure was not a practical solution and that water should be supplied at full pressure during limited hours. The court held that the applicants are entitled to a variation of the previous order to ensure adequate water supply and that the respondents must cooperate to restore and maintain the supply. The matter was urgent due to the ongoing deprivation of a basic right, and the...
- Citation
- [2017] ZAGPPHC 1088
- Parties
- Applicant: Pule Molefe; Applicant: Residents of the Blyvooruitzicht; Respondent: Merafong Local Municipality; Respondent: Rand Water; Respondent: Minister of Water and Sanitation; Respondent: Minister of Cooperative Governance and Traditional Affairs for Gauteng; Respondent: Premier of Gauteng Province; Respondent: MEC of Cooperative Governance and Traditional Affairs for Gauteng; Respondent: Leigh Roering NO; Respondent: KPMM Construction (Pty) Limited; Respondent: MME Manufacturing Company (Pty) Limited; Respondent: Double D & G Building Contractors CC; Respondent: AngloGold Ashanti Limited
- Court
- North Gauteng High Court, Pretoria
- Jurisdiction
- South Africa
- Judgment Date
- 17 October 2017
- Case Number
- 63816/2017
- Procedural Posture
- Urgent Application / Application to Vary Previous Court Order and Seek Restoration of Water Supply
- Outcome
- Application granted; previous order varied; respondents directed to restore water supply and engage in good faith to find alternative solutions; costs awarded against second respondent.
- Judges
- M W Msimeki
- Legal Topics
- Water Services Act, Right of Access to Water, Urgent Interdict, Variation of Court Order
Case Brief
Summary, issues, holding and outcome
More case intelligence is available
Unlock the full research layer for this judgment.
Parties
Pule Molefe
Applicant
Residents of the Blyvooruitzicht
Applicant
Merafong Local Municipality
Respondent
Rand Water
Respondent
Minister of Water and Sanitation
Respondent
Minister of Cooperative Governance and Traditional Affairs for Gauteng
Respondent
Premier of Gauteng Province
Respondent
MEC of Cooperative Governance and Traditional Affairs for Gauteng
Respondent
Leigh Roering NO
Respondent
KPMM Construction (Pty) Limited
Respondent
MME Manufacturing Company (Pty) Limited
Respondent
Double D & G Building Contractors CC
Respondent
AngloGold Ashanti Limited
Respondent
Procedural Posture
Urgent Application / Application to Vary Previous Court Order and Seek Restoration of Water Supply
Legal Issues
- 1 Whether the applicants are entitled to a variation of the previous court order regarding water supply to Blyvooruitzicht Mining Village.
- 2 Whether the reduction of water pressure and restricted supply hours have deprived residents of access to sufficient water.
- 3 Whether the respondents have complied with their statutory and contractual obligations to supply water.
Ratio Decidendi
The court found that the implementation of the previous order, specifically the reduction of water pressure and restricted supply hours, had resulted in the deprivation of water to residents in higher areas of Blyvooruitzicht. The evidence, including the Wetcon engineering report, demonstrated that limiting pressure was not a practical solution and that water should be supplied at full pressure during limited hours. The court held that the applicants are entitled to a variation of the previous order to ensure adequate water supply and that the respondents must cooperate to restore and maintain the supply. The matter was urgent due to the ongoing deprivation of a basic right, and the...
Court Disposition
Application granted; previous order varied; respondents directed to restore water supply and engage in good faith to find alternative solutions; costs awarded against second respondent.
Orders
- Paragraph 1.2 of the previous order is deleted in its entirety.
- The hours of water supply in paragraph 1.3 are replaced with 'the hours of 4 pm to 10 pm'.
Full Case Text
Judgment text and source record
Sign in to read
Sign in to read the full judgment text
Sign in to read the full judgment text. Downloads and additional research tools may depend on your plan.
Sign in to read the full judgment