michael materu vs afriq engineering constructioncoltd 2022 tzhcld 34 4 february 2022
The dispute arose on the date the respondent failed to pay the last installment, and the application was filed within 40 days of that date, thus within the limitation period. The mediator erred in dismissing the dispute as time barred.
- Citation
- michael materu vs afriq engineering constructioncoltd 2022 tzhcld 34 4 february 2022
- Parties
- Applicant: Michael Materu; Respondent: Afriq Engineering & Construction Co. Limited
- Court
- TANZLII
- Jurisdiction
- Tanzania
- Judgment Date
- 4 February 2022
- Procedural Posture
- Revision Application / Judgment
- Outcome
- CMA ruling revised and set aside
- Legal Topics
- Breach of Contract, Limitation Period, Employment Termination
- Source Language
- English
Case Brief
Summary, issues, holding and outcome
More case intelligence is available
Unlock the full research layer for this judgment.
Parties
Michael Materu
Applicant
Afriq Engineering & Construction Co. Limited
Respondent
Procedural Posture
Revision Application / Judgment
Legal Issues
- 1 Whether the dispute filed at CMA was time barred
- 2 Determination of the date when the dispute arose for limitation purposes
Ratio Decidendi
The dispute arose on the date the respondent failed to pay the last installment, and the application was filed within 40 days of that date, thus within the limitation period. The mediator erred in dismissing the dispute as time barred.
Court Disposition
CMA ruling revised and set aside
Orders
- Parties ordered to return to CMA for the dispute to be heard on merit
Full Case Text
Judgment text and source record
Sign in to read
Sign in to read the full judgment text
Sign in to read the full judgment text. Downloads and additional research tools may depend on your plan.
Sign in to read the full judgment