Waters Regulation 1
This regulation sets water-use licensing rules, fees, application requirements, and annual reporting duties.
- Jurisdiction
- Canada — Northwest Territories
- Instrument
- Regulation
- Version
- Undated source snapshot
- Language
- en
- Official source
- View official record ↗
Statute overview
About this statute
This regulation sets water-use licensing rules, fees, application requirements, and annual reporting duties. This part sets licensing thresholds for water use and waste deposits for several undertaking types, including mining and milling, municipal, power, and agricultural/miscellaneous activities.
Search within this statute
Search all stored provisions in this version.
Legal text
Provisions of Waters Regulation 1
Showing 2 of 2
Part document.segment-1
Waters Regulation 1 — segment 1
- document.segment-1 Verify source ↗
Waters Regulation 1 — segment 1
This regulation sets water-use licensing rules, fees, application requirements, and annual reporting duties.
WATERS ACT LOI SUR LES EAUX WATERS REGULATIONS RÈGLEMENT SUR LES EAUX R-019-2014 R-019-2014 In force April 1, 2014 En vigueur le 1er avril 2014 AMENDED BY MODIFIÉ PAR This consolidation is not an official statement of the La présente codification administrative ne constitue pas law. It is an office consolidation prepared by le texte officiel de la loi; elle n'est établie qu'à titre Legislation Division, Department of Justice, for documentaire par les Affaires législatives du ministère convenience of reference only. The authoritative text de la Justice. Seuls les règlements contenus dans les of regulations can be ascertained from the Revised Règlements révisés des Territoires du Nord-Ouest Regulations of the Northwest Territories, 1990 and the (1990) et dans les parutions mensuelles de la Partie II monthly publication of Part II of the Northwest de la Gazette des Territoires du Nord-Ouest ont force Territories Gazette. de loi. This consolidation and other G.N.W.T. legislation can La présente codification administrative et les autres lois be accessed on-line at et règlements du G.T.N.-O. sont disponibles en direct à l’adresse suivante : http://www.justice.gov.nt.ca/Legislation/SearchLeg& Reg.shtml http://www.justice.gov.nt.ca/Legislation/SearchLeg& RegFR.shtml WATERS ACT LOI SUR LES EAUX WATERS REGULATIONS RÈGLEMENT SUR LES EAUX The Commissioner in Executive Council, under Le commissaire en Conseil Exécutif, en vertu de section 63 of the Waters Act and every enabling power, l’article 63 de la Loi sur les eaux et de tout pouvoir makes the Waters Regulations. habilitant, prend le Règlement sur les eaux. INTERPRETATION DÉFINITIONS 1. In these regulations, 1. Les définitions qui suivent s’appliquent au présent règlement. "Act" means the Waters Act; (Loi) «cours d’eau» Tout cours d’eau naturel, plan d’eau ou "groundwater" means all water in a zone of saturation réserve d’eau, même s’il ne contient habituellement pas beneath the land surface, regardless of its origin; (eau d’eau. Sont compris dans la présente définition les eaux souterraine) souterraines, sources, ravins et marécages. (watercourse) "undertaking" means an undertaking in respect of which water is to be used or waste is to be deposited, of «eau souterraine» Toute eau d’une zone de saturation a type set out in Schedule B; (entreprise) souterraine, indépendamment de son origine. (groundwater) "watercourse" means a natural watercourse, body of water or water supply, whether usually containing water «entreprise» Toute entreprise nécessitant l’utilisation de or not, and includes groundwater, springs, swamps and l’eau ou le dépôt de déchets qui est du type prévu à gulches. (cours d’eau) l’annexe B. (undertaking) «Loi» La Loi sur les eaux. (Act) WATER MANAGEMENT AREAS ZONES DE GESTION DES EAUX 2. The geographical areas of the Northwest Territories 2. Sont constituées en tant que zones de gestion des set out in Schedule A are established as water eaux les régions géographiques des Territoires du management areas. Nord-Ouest énumérées à l’annexe A. APPLICATION APPLICATION 3. These regulations apply in respect of the water 3. Le présent règlement s’applique aux zones de management areas established under section 2. gestion des eaux constituées à l’article 2. WATER USE OR WASTE DEPOSIT UTILISATION SANS PERMIS DES EAUX ET WITHOUT A LICENCE DÉPÔT SANS PERMIS DE DÉCHETS 4. (1) A person may use water and deposit waste 4. (1) Toute personne est autorisée à utiliser sans without a licence if the proposed use or deposit permis des eaux ou à déposer sans permis des déchets (a) has no potential for significant adverse si l’utilisation ou le dépôt projeté respecte les environmental effects; conditions suivantes : (b) would not interfere with existing rights of a) il ne risque pas d’entraîner d’importants other water users or waste depositors; and effets négatifs sur l’environnement; (c) satisfies the criteria set out b) il n’empiète pas sur les droits existants des (i) in respect of an industrial autres personnes qui utilisent des eaux ou undertaking, in column II of déposent des déchets; Schedule D, c) il est conforme aux critères énoncés : (ii) in respect of a mining and milling (i) pour une entreprise industrielle, à la 1 undertaking, column II of colonne II de l’annexe D, Schedule E, (ii) pour une entreprise d’exploitation et (iii) in respect of a municipal de broyage du minerai, à la undertaking, in column II of colonne II de l’annexe E, Schedule F, (iii) pour une entreprise municipale, à la (iv) in respect of a power undertaking, in colonne II de l’annexe F, column II of Schedule G, and (iv) pour une entreprise de production (v) in respect of an agricultural, d’électricité, à la colonne II de conservation, recreational or l’annexe G, miscellaneous undertaking, in (v) pour une entreprise agricole, de column II of Schedule H. conservation, récréative ou diverse, à la colonne II de l’annexe H. (2) An individual may, without a licence, deposit (2) Un particulier peut déposer sans permis des waste that is sewage from a residential building, in eaux usées provenant d’un immeuble résidentiel s’il les accordance with the General Sanitation Regulations. dépose en conformité avec le Règlement sur la salubrité publique. (3) A vessel within the meaning of the Canada (3) Un bâtiment, au sens de la Loi de 2001 sur la Shipping Act 2001 may, without a licence, deposit marine marchande du Canada, peut déposer sans waste if the deposit of that waste is not prohibited under permis des déchets si ce dépôt n’est pas interdit en section 187 of that Act. vertu de l’article 187 de cette loi. APPLICATIONS FOR LICENCES DEMANDE DE PERMIS 5. (1) An application for a licence or for the 5. (1) La demande d’obtention, de modification ou amendment or renewal of a licence shall be the form set de renouvellement d’un permis est faite selon le out in Schedule C and shall contain the information formulaire établi à l’annexe C, dûment rempli, et est identified in that form and be accompanied by a deposit accompagnée d’un dépôt égal au droit d’utilisation des equal to the water use fee that would be payable under eaux qui serait payable aux termes du paragraphe 8(1) subsection 8(1) in respect of the first year of the licence pour la première année que vise la demande de permis. that is being applied for. (2) An application referred to in subsection (1) (2) La demande mentionnée au paragraphe (1) shall also include comprend également : (a) if the proposed undertaking consists of a a) si l’entreprise projetée est un barrage : dam, (i) un plan sur lequel figurent, d’une (i) a plan showing the length, height, part, la longueur et la hauteur du cross-sections and elevations of the barrage ainsi que les coupes dam and the location and preliminary transversales et les élévations de designs of spillways, canals, sluice celui-ci et, d’autre part, pipes and any other outlet works, and l’emplacement des passe-déversoirs, (ii) data respecting the type and des canaux, des tuyaux de vannage et composition of the material to be autres dispositifs de vannage de used in the construction of the dam; même qu’une esquisse de ceux-ci, (b) if the proposed undertaking consists of a (ii) des précisions sur le type de storage reservoir, matériaux qui seront employés pour (i) an estimate of the number of hectares la construction du barrage et leur of land to be flooded, the surface composition; area, in hectares, of the reservoir b) si l’entreprise projetée est un réservoir de when filled and the contemplated retenue : total storage capacity of the (i) une estimation du nombre d’hectares reservoir, and de terres qui seront submergés, la (ii) a plan showing representative superficie, en hectares, du réservoir 2 cross-sections of the reservoir; une fois rempli et sa capacité (c) if the proposed undertaking consists of a d’accumulation totale prévue, watercourse crossing, (ii) un plan indiquant des coupes (i) a plan of the crossing showing transversales représentatives du cross-sections and elevations, réservoir; (ii) a description of the existing bed and c) si l’entreprise projetée est une traverse de banks of the watercourse, and cours d’eau : (iii) the available data on the water flow (i) un plan de la traverse indiquant des of the watercourse; coupes transversales et des (d) if the water is proposed to be used for a élévations, municipal undertaking in respect of a (ii) une description des rives et du lit du camp or lodge or in respect of a cours d’eau, municipality or settlement, (iii) les données disponibles concernant (i) a plan showing the location of the le débit du cours d’eau; camp or lodge or the location, area d) si l’utilisation projetée des eaux s’inscrit and boundaries of the municipality or dans le cadre d’une entreprise municipale settlement, visant un camp ou un hôtel pavillonnaire (ii) an indication of the approximate ou une municipalité ou une localité : capacity of the camp or lodge or (i) un plan indiquant l’emplacement du population of the municipality or camp ou de l’hôtel pavillonnaire ou settlement, and l’emplacement, la zone et les limites (iii) a plan of the intended water or de la municipalité ou de la localité, sewage system, showing (ii) des précisions sur la capacité cross-sections and elevations; approximative du camp ou de l’hôtel (e) if the water is proposed to be used for an pavillonnaire ou sur la population industrial or mining and milling approximative de la municipalité ou undertaking, a description of the de la localité, undertaking and of all wastes produced (iii) un plan du réseau d’adduction ou and chemicals used in the operation of the d’égout prévu indiquant des coupes undertaking; transversales et des élévations; (f) if the proposed undertaking involves a e) si l’utilisation projetée des eaux s’inscrit deposit of waste, dans le cadre d’une entreprise industrielle (i) the location, rate, timing, frequency ou d’exploitation et de broyage du and duration of the deposit, minerai, une description de l’entreprise, (ii) the anticipated constituents of the des déchets qu’elle produira et des deposit and the concentration of the produits chimiques qui seront employés constituents, dans le cadre de son exploitation; (iii) the methods proposed for the storage f) si l’entreprise projetée comporte le dépôt and treatment of the waste, and de déchets : (iv) an assessment of the qualitative and (i) des précisions sur l’emplacement, le quantitative effects on the waters into débit, le moment, la fréquence et la which the waste is to be deposited; durée du dépôt, (g) if the undertaking involves the handling or (ii) des précisions sur les composantes storage of petroleum products or prévues du dépôt et leur hazardous materials, concentration, (i) a plan for their safe handling, storage (iii) des précisions sur les méthodes and disposal, and prévues pour l’entreposage et le (ii) a contingency plan for the traitement des déchets, containment and clean up of those (iv) une évaluation des effets qualitatifs products and materials in the event et quantitatifs sur les eaux où seront of a spill; and déposés les déchets; (h) plans for the abandonment, or any g) si l’entreprise projetée comporte la temporary closing, of the proposed manipulation ou l’entreposage de produits undertaking. pétroliers ou de matières dangereuses : 3 (i) un plan des mesures de sécurité pour la manipulation, l’entreposage et l’élimination en toute sécurité de ces produits ou matières, (ii) un plan d’urgence prévoyant, en cas de déversement de ces produits ou matières, les mesures à prendre pour empêcher qu’ils ne se répandent et pour le nettoyage; h) des plans concernant l’abandon ou la fermeture temporaire de l’entreprise projetée. APPLICATION FEES DROITS RELATIFS AUX DEMANDES 6. The fee payable on the submission of an 6. Le droit exigible au moment de la présentation application for a licence or for the amendment, renewal, d’une demande d’obtention, de modification, de cancellation or assignment of a licence or of an renouvellement, d’annulation ou de cession d’un permis application under section 61 of the Act is $30. ou de la présentation d’une demande en vertu de l’article 61 de la Loi est de 30 $. LICENSING CRITERIA CRITÈRES DE DÉLIVRANCE DES PERMIS 7. (1) Subject to subsection (2), a licence issued 7. (1) Sous réserve du paragraphe (2), un permis under subsection 26(1) of the Act shall be a type B délivré aux termes du paragraphe 26(1) de la Loi est un licence for one or more uses of water or deposits of permis de type B pour une ou plusieurs utilisations des waste set out in column I of any of Schedules D to H, eaux ou pour un ou plusieurs dépôts de déchets prévus where any one of those uses or deposits à la colonne I des annexes D à H lorsque l’une de ces (a) meets a criterion set out in column III of utilisations ou l’un de ces dépôts : the Schedules; or a) soit répond à l’un des critères énoncés à la (b) meets a criterion set out in column II of colonne III de ces annexes; the Schedules, but does not meet the b) soit répond à l’un des critères énoncés à la requirements of paragraphs 4(1)(a) colonne II de ces annexes, mais ne and (b). satisfait pas aux exigences des alinéas 4(1)a) et b). (2) A licence issued under subsection 26(1) of the (2) Un permis délivré aux termes du Act shall be a type A licence for one or more uses of paragraphe 26(1) de la Loi est un permis de type A pour water or deposits of waste set out in column I of any of une ou plusieurs utilisations des eaux ou pour un ou Schedules D to H, where any one of those uses or plusieurs dépôts de déchets prévus à la colonne I des deposits meets a criterion set out in column IV of those annexes D à H lorsque l’une de ces utilisations ou l’un Schedules. de ces dépôts répond à l’un des critères énoncés à la colonne IV de ces annexes. WATER USE FEES DROITS D’UTILISATION DES EAUX 8. (1) Subject to subsections (4) and (5), the fee 8. (1) Sous réserve des paragraphes (4) et (5), le droit payable by a licensee for the right to the use of water, payable, calculé sur une base annuelle, par le titulaire calculated on an annual basis, is de permis pour le droit d’utiliser des eaux est le (a) in respect of an agricultural undertaking, suivant : the greater of a) pour une entreprise agricole, le plus élevé (i) $30, and des montants suivants : (ii) $0.15 for each 1,000 m3 authorized (i) 30 $, by the licence; (ii) 0,15 $ par 1 000 m3 qu’autorise le 4 (b) in respect of an industrial, mining and permis; milling or miscellaneous undertaking, the b) pour une entreprise industrielle, greater of $30 and the aggregate of d’exploitation et de broyage du minerai ou (i) for the first 2,000 m3 per day that is diverse, le plus élevé de 30 $ ou de la authorized by the licence, $1 for somme des montants suivants, calculés each 100 m3 per day, comme suit: (ii) for a quantity greater than 2,000 m3 (i) 1 $ par 100 m3 qu’autorise le permis per day but less than or equal to par jour, pour les premiers 2 000 m3 4,000 m3 per day that is authorized par jour, by the licence, $1.50 for each 100 m3 (ii) 1,50 $ par 100 m3 qu’autorise le per day, and permis par jour, pour toute quantité (iii) for a quantity greater than 4,000 m3 supérieure à 2 000 m3 par jour, mais per day that is authorized by the ne dépassant pas 4 000 m3 par jour, licence, $2 for each 100 m3 per day; (iii) 2 $ par 100 m3 qu’autorise le permis and par jour, pour toute quantité (c) in respect of a power undertaking, supérieure à 4 000 m3 par jour; (i) for a Class 0 power undertaking, nil, c) pour une entreprise de production (ii) for a Class 1 power undertaking, d’électricité : $1,500, (i) aucun droit pour la production (iii) for a Class 2 power undertaking, d’électricité de classe 0, $4,000, (ii) 1 500 $ pour la production (iv) for a Class 3 power undertaking, d’électricité de classe 1, $10,000, (iii) 4 000 $ pour la production (v) for a Class 4 power undertaking, d’électricité de classe 2, $30,000, (iv) 10 000 $ pour la production (vi) for a Class 5 power undertaking, d’électricité de classe 3, $80,000, and (v) 30 000 $ pour la production (vii) for a Class 6 power undertaking, d’électricité de classe 4, $90,000 for the first 100,000 kW of (vi) 80 000 $ pour la production authorized production and $1,000 for d’électricité de classe 5, each 1,000 kW of authorized (vii) pour la production d’électricité de production in excess of 100,000 kW. classe 6, 90 000 $ pour les premiers 100 000 kW de production autorisés et 1 000 $ pour chaque 1 000 kW de production autorisés en sus de 100 000 kW. (2) For the purposes of paragraph (1)(b), if a (2) Pour l’application de l’alinéa (1)b), si le permis licence authorizes the use of water on a basis other than autorise l’utilisation des eaux sur une base autre qu’une a daily basis, the licence fee payable shall be calculated base journalière, le taux d’utilisation autorisé est by converting the rate of authorized use to an converti en un taux journalier équivalent aux fins du equivalent daily rate. calcul des droits payables. (3) If the volume of water is specified in a licence (3) Si le volume d’eau précisé dans le permis to be total watercourse flow, the licence fee will be représente l’écoulement total du cours d’eau, le droit est calculated using the mean daily flow of the calculé en fonction du débit journalier moyen, calculé watercourse, calculated on an annual basis. pour l’année, du cours d’eau. (4) Licence fees are payable only for the portion (4) Les droits sont exigibles seulement pour la of the year during which the licence is in effect. partie de l’année pendant laquelle le permis est en vigueur. 5 (5) No fees are payable under subsection (1) in (5) Aucun droit n’est payable aux termes du respect of a diversion of water if the water is not paragraphe (1) si la seule utilisation du cours d’eau est otherwise used. son détournement. (6) Licence fees shall be paid or, in the case of an (6) Les droits sont payés, ou déduits du dépôt s’il initial payment, deducted from the deposit s’agit du premier paiement : (a) in respect of a licence for a term of one a) dans le cas d’un permis d’une durée d’un year or less, at the time the licence is an ou moins, au moment de la délivrance issued; and du permis; (b) in respect of a licence for a term of more b) dans le cas d’un permis d’une durée de than one year, plus d’un an : (i) for the first year of the licence, at the (i) au moment de la délivrance du time the licence is issued, and permis pour la première année, (ii) for each subsequent year of the (ii) à la date anniversaire de la licence, or for any portion of the délivrance du permis qui précède final year of the licence, in advance, chaque année subséquente visée par on the anniversary of the date of le permis. issuance of the licence. (7) If the licence fee payable under this section is (7) Si le droit à payer pour le permis aux termes du less than the amount of the deposit remitted under présent article est inférieur au montant du dépôt remis subsection 5(1), the difference shall be refunded conformément au paragraphe 5(1), la différence est accordingly. remboursée en conséquence. APPLICATIONS FOR ASSIGNMENT DEMANDE DE CESSION DE PERMIS 9. (1) An application for authorization for the 9. (1) Toute demande d’autorisation de cession de assignment of a licence pursuant to subsection 39(2) of permis en vertu du paragraphe 39(2) de la Loi est the Act shall be submitted to the Board, accompanied présentée à l’Office, accompagnée du droit prévu à by the fee set out in section 6, not less than 45 days l’article 6, au moins 45 jours avant la date de cession before the date on which the applicant proposes to projetée. assign the licence. (2) An application referred to in subsection (1) (2) La demande mentionnée au paragraphe (1) est shall be signed by the assignor and the assignee and signée par le cédant et le cessionnaire et porte le nom et shall include the name and address of the assignee. l’adresse du cessionnaire. APPLICATIONS FOR CANCELLATION DEMANDE D’ANNULATION 10. An application for cancellation of a licence shall be 10. La demande d’annulation d’un permis se fait par in writing and set out the reason for the requested écrit, est motivée et précise les mesures prises ou cancellation and a description of the measures taken or projetées, avant l’annulation, pour l’abandon de proposed to be taken, prior to cancellation, for l’entreprise en cause. abandonment of the appurtenant undertaking. SECURITY GARANTIE 11. (1) The Board may fix the amount of security 11. (1) L’Office peut fixer le montant de la garantie required to be furnished by an applicant under exigée du demandeur en vertu du paragraphe 35(1) de subsection 35(1) of the Act in an amount not exceeding la Loi, lequel ne doit pas excéder la somme des coûts : the aggregate of the costs of a) de l’abandon de l’entreprise; (a) abandonment of the undertaking; b) de la restauration de l’emplacement de (b) restoration of the site of the undertaking; l’entreprise; and c) des mesures permanentes qu’il resterait à 6 (c) any ongoing measures that may remain to prendre après l’abandon de l’entreprise. be taken after the abandonment of the undertaking. (2) In fixing an amount of security pursuant to (2) Pour fixer le montant de la garantie en vertu du subsection (1), the Board may have regard to paragraphe (1), l’Office peut prendre en considération (a) the ability of the applicant, licensee or les facteurs suivants : prospective assignee to pay the costs a) la capacité du demandeur, du titulaire de referred to in that subsection; or permis ou du cessionnaire éventuel de (b) the past performance by the applicant, payer les coûts mentionnés à ce licensee or prospective assignee in respect paragraphe; of any other licence. b) la conduite antérieure du demandeur, du titulaire de permis ou du cessionnaire éventuel à l’égard de tout autre permis. (3) Security referred to in subsection (1) shall be (3) La garantie mentionnée au paragraphe (1) est in the form of sous l’une ou l’autre des formes suivantes : (a) a promissory note guaranteed by a bank in a) un billet à ordre garanti par une banque au Canada and payable to the Government of Canada et établi à l’ordre du the Northwest Territories; gouvernement des Territoires du Nord- (b) a certified cheque drawn on a bank in Ouest; Canada and payable to the Government of b) un chèque visé tiré sur une banque au the Northwest Territories; Canada et établi à l’ordre du (c) a security bond acceptable to the gouvernement des Territoires du Nord- Government of the Northwest Territories; Ouest; (d) an irrevocable letter of credit from a bank c) un cautionnement approuvé par le in Canada; or gouvernement des Territoires du Nord- (e) cash. Ouest; d) une lettre de crédit irrévocable émise par une banque au Canada; e) de l’argent comptant. APPLICATION FOR EXPROPRIATION DEMANDE D’EXPROPRIATION 12. An application under section 61 of the Act shall 12. La demande présentée en vertu de l’article 61 de la include Loi comprend, à la fois : (a) a legal description of the lands or interest a) une description officielle des biens-fonds, in respect of which the application is ou des droits y afférents, visés par la made and the name and address of the demande ainsi que le nom et l’adresse de owner of every registered interest in the toute personne dûment inscrite comme lands; and titulaire d’un droit sur ces biens-fonds; (b) a statement of efforts made by the b) une déclaration au sujet des démarches applicant to acquire the lands or interest. entreprises par le demandeur en vue d’acquérir les biens-fonds ou les droits y afférents. PUBLIC REGISTER REGISTRE PUBLIC 13. (1) The register referred to in section 53 of the Act 13. (1) Le registre visé à l’article 53 de la Loi se shall be in the form of one or more files in respect of présente sous la forme d’un ou plusieurs dossiers each licence application. établis pour chaque demande de permis. (2) Each file referred to in subsection (1) shall (2) Chaque dossier visé au paragraphe (1) contain contient, à la fois : 7 (a) a copy of the application and of all a) une copie de la demande et des documents supporting documents; fournis à l’appui; (b) all records from any public hearing held in b) les documents des audiences publiques connection with the application; tenues, le cas échéant, relativement à la (c) a copy of any licence issued in respect of demande; the application and the reasons for the c) une copie du permis délivré à la suite de la decision of the Board in respect of its demande, le cas échéant, ainsi que les issuance; and motifs de la décision de l’Office de (d) all correspondence and documents délivrer le permis; submitted to the Board in respect of d) la correspondance et les documents compliance with the conditions of any présentés à l’Office en exécution des licence issued in respect of the conditions du permis délivré à la suite de application. la demande. REPORTS RAPPORTS 14. (1) Every licensee shall maintain accurate and 14. (1) Tout titulaire de permis tient des livres et detailed books and records, and shall submit a report to registres exacts et détaillés et présente chaque année un the Board each year, on or before the anniversary of the rapport à l’Office, au plus tard à la date anniversaire de date of issuance of the licence, setting out the quantity la délivrance du permis, lesquels documents indiquent of water used under the licence and the quantity, la quantité d’eau utilisée en vertu du permis ainsi que la concentration and type of waste deposited under the quantité, la concentration et le type de déchets déposés licence. en vertu du permis. (2) A report submitted under subsection (1) shall (2) Le rapport visé au paragraphe (1) est signé be signed by par : (a) the licensee, if the licensee is an a) le titulaire du permis, si celui-ci est un individual; or particulier; (b) an authorized agent of the licensee, if the b) un agent autorisé du titulaire du permis licensee is not an individual. autorisé à cette fin, si le titulaire du permis n’est pas un particulier. 15. These regulations come into force April 1, 2014. 15. Le présent règlement entre en vigueur le 1er avril 2014. 8 9 SCHEDULE A (Section 2) WATER MANAGEMENT AREAS 1. Great Slave Lake and all waters and river basins draining into Great Slave Lake 2. Great Bear Lake, all waters and river basins draining into Great Bear Lake, the Great Bear River and its tributaries and all the river basins of the Great Bear River and its tributaries 3. The Mackenzie River, its tributaries and all river basins of the Mackenzie River and its tributaries 4. All waters and river basins of the mainland draining into Hudson Bay 5. All other waters and river basins draining into the Arctic Ocean or adjacent waters. 10 ANNEXE A (article 2) ZONES DE GESTION DES EAUX 1. Le Grand lac des Esclaves ainsi que toutes les eaux et tous les bassins fluviaux qui s’y déversent 2. Le Grand lac de l’Ours ainsi que toutes les eaux et tous les bassins fluviaux qui s’y déversent, la Grande rivière de l’Ours et ses affluents ainsi que tous ses bassins fluviaux et ceux de ses affluents 3. Le fleuve Mackenzie et ses affluents ainsi que tous ses bassins fluviaux et ceux de ses affluents 4. Toutes les eaux et tous les bassins fluviaux de la terre ferme qui se déversent dans la baie d’Hudson. 5. Toutes les autres eaux et tous les autres bassins fluviaux qui se déversent dans l’océan Arctique ou dans les eaux contiguës 11 SCHEDULE B (Section 1) CLASSIFICATION OF UNDERTAKINGS Item Type of Undertaking Description of Undertaking 1. Industrial undertaking An industrial activity other than mining and milling, including manufacturing processes, hydrostatic testing, fluming, the exploration for and production and transportation of oil and gas, cooling systems, food processing, tanneries, smelters, sawmills, pulp mills, metal finishing and tailings reprocessing 2. Mining and milling undertaking Operation of a mine within the meaning of the Canada Mining Regulations or the Coal Regulations and related milling activities 3. Municipal undertaking An activity (a) in a municipality or in a settlement comprising a multiplicity of residential units that uses only a municipal water and sewage system including domestic horticultural, fire protection, commercial or industrial activities, or (b) in a camp or lodge 4. Power undertaking Authorized hydro or geothermal electrical generation of (a) Class 0 150 or fewer kW (b) Class 1 More than 150 kW but less than 5,000 kW (c) Class 2 5,000 or more kW but less than 10,000 kW (d) Class 3 10,000 or more kW but less than 20,000 kW (e) Class 4 20,000 or more kW less than 50,000 kW (f) Class 5 50,000 or more kW but less than 100,000 kW (g) Class 6 100,000 or more kW 5. Agricultural undertaking Nourishing crops or the providing of water for livestock 6. Conservation undertaking Construction of works for the preservation, protection or improvement of the existing natural environment 7. Recreational undertaking A commercial or public recreational development 8. Miscellaneous undertaking Any other undertaking 12 ANNEXE B (article 1) CLASSIFICATION DES ENTREPRISES EN CATÉGORIES Article Type D’entreprise Description De L’entreprise 1. Industrielle Une activité industrielle, sauf l’exploitation et le broyage du minerai, notamment la fabrication, les essais hydrauliques, le transport par canalisation, la recherche, la production et le transport du pétrole et du gaz, les circuits de refroidissement, la transformation des aliments, les tanneries, les fonderies, les scieries, les usines de pâte à papier, le finissage des métaux et la récupération des résidus 2. Exploitation et broyage du minerai Exploitation d’une mine au sens du Règlement sur l’exploitation minière au Canada ou du Règlement sur la houille et les activités de broyage y afférant 3. Municipale Une activité : a) dans une municipalité, ou une localité comprenant de nombreuses habitations, qui est desservie uniquement par un réseau municipal d’adduction et d’égout, notamment les travaux domestiques, l’horticulture, la protection contre les incendies et les activités commerciales ou industrielles b) dans un camp ou un hôtel pavillonnaire 4. Production d’électricité Production d’électricité hydro-électrique ou géothermique a) Classe 0 autorisée : b) Classe 1 d’au plus 150 kW c) Classe 2 supérieure à 150 kW et inférieure à 5 000 kW d) Classe 3 de 5 000 kW ou plus et inférieure à 10 000 kW e) Classe 4 de 10 000 kW ou plus et inférieure à 20 000 kW f) Classe 5 de 20 000 kW ou plus et inférieure à 50 000 kW g) Classe 6 de 50 000 kW ou plus et inférieure à 100 000 kW de 100 000 kW ou plus 5. Agricole Arrosage des cultures ou approvisionnement des bestiaux en eau 6. Conservation Réalisation de travaux de conservation, protection ou amélioration de l’environnement naturel 7. Récréative Aménagement récréatif commercial ou public 8. Diverse Toute autre entreprise 13 SCHEDULE C (Subsection 5(1)) APPLICATION FOR LICENCE, AMENDMENT OF LICENCE, OR RENEWAL OF LICENCE APPLICATION/LICENCE NO: _________________________________ (amendment or renewal only) 1. NAME AND MAILING ADDRESS OF APPLICANT ______________________________________________________________________________________________ ______________________________________________________________________________________________ _________________________________________________________________________________________________ TELEPHONE: __________________ FAX: __________________ 2. ADDRESS OF HEAD OFFICE IN CANADA IF INCORPORATED _______________________________________________________________________________________________ _______________________________________________________________________________________________ _______________________________________________________________________________________________ TELEPHONE: ___________________ FAX: ___________________ 3. LOCATION OF UNDERTAKING _______________________________________________________________________________________________ _______________________________________________________________________________________________ _______________________________________________________________________________________________ Latitude Longitude 4. DESCRIPTION OF UNDERTAKING (describe and attach plans) _______________________________________________________________________________________________ _______________________________________________________________________________________________ _______________________________________________________________________________________________ 5. TYPE OF UNDERTAKING 1. Industrial ______ 2. Mining and milling ______ 3. Municipal ______ 4. Power ______ 5. Agriculture ______ 6. Conservation ______ 7. Recreation ______ 8. Miscellaneous (describe)______ 14 ANNEXE C (paragraphe 5(1)) DEMANDE D’OBTENTION, DE MODIFICATION OU DE RENOUVELLEMENT DE PERMIS No DE DEMANDE OU DE PERMIS : ________________________________________ (Modification ou renouvellement seulement) 1. NOM ET ADRESSE POSTALE DU DEMANDEUR ______________________________________________________________________________________________ ______________________________________________________________________________________________ _________________________________________________________________________________________________ No DE TÉLÉPHONE : __________________ No DE TÉLÉCOPIEUR : __________________ 2. ADRESSE DU SIÈGE SOCIAL AU CANADA DANS LE CAS D’UNE SOCIÉTÉ _______________________________________________________________________________________________ _______________________________________________________________________________________________ _______________________________________________________________________________________________ No DE TÉLÉPHONE : ___________________ No DE TÉLÉCOPIEUR : ___________________ 3. LIEU DE L’ENTREPRISE (Donner une description et joindre une carte indiquant les cours d’eau et les lieux des dépôts de déchets projetés.) _______________________________________________________________________________________________ ______________________________________________________________________________________________ _______________________________________________________________________________________________ Latitude : Longitude : ______________________________________ 4. DESCRIPTION DE L’ENTREPRISE (Donner une description et joindre les plans.) _______________________________________________________________________________________________ _______________________________________________________________________________________________ _______________________________________________________________________________________________ 5. TYPE D’ENTREPRISE 1. Industrielle ______ 2. Exploitation et broyage du minerai ______ 3. Municipale ______ 4. Production d’électricité ______ 5. Agricole ______ 6. Conservation ______ 7. Récréative ______ 8. Diverse (préciser) ______ 15 6. WATER USE ______To obtain water ______Flood control ______To cross a watercourse ______To divert water ______To modify the bed or bank of a watercourse ______To alter the flow of, or store, water Other (describe) ______________________________________________________________________________________________ ____________________________________________________________________________________________ 7. QUANTITY OF WATER INVOLVED (litres per second, litres per day or cubic metres per year, including both quantity to be used and quality to be returned to source) ______________________________________________________________________________________________ ______________________________________________________________________________________________ ______________________________________________________________________________________________ 8. WASTE DEPOSITED (quantity, quality, treatment and disposal) ______________________________________________________________________________________________ ______________________________________________________________________________________________ ______________________________________________________________________________________________ 9. OTHER PERSONS OR PROPERTIES AFFECTED BY THIS UNDERTAKING (give name, mailing address and location; attach list if necessary) _______________________________________________________________________________________________ _______________________________________________________________________________________________ _______________________________________________________________________________________________ _______________________________________________________________________________________________ 10. PREDICTED ENVIRONMENTAL IMPACTS OF UNDERTAKING AND PROPOSED MITIGATION _______________________________________________________________________________________________ _______________________________________________________________________________________________ _______________________________________________________________________________________________ 16 6. UTILISATION DES EAUX _____Obtenir de l’eau _____Traverser un cours d’eau _____Modifier le lit ou les rives d’un cours d’eau _____Lutter contre l’inondation _____Détourner des eaux _____Modifier le débit d’un cours d’eau ou accumuler de l’eau _____Autre but (préciser) _______________________________________________________________________________________________ _________________________________________________________________________________________________ 7. QUANTITÉ D’EAU QU’IL EST PROPOSÉ DE PRÉLEVER ET DE RETOURNER (nombre de litres par seconde, nombre de litres par jour, nombre de m3 par année) _______________________________________________________________________________________________ ________________________________________________________________________________________________ _______________________________________________________________________________________________ 8. DÉCHETS DÉPOSÉS (quantité, type, traitement et méthode d’évacuation) _______________________________________________________________________________________________ _______________________________________________________________________________________________ ________________________________________________________________________________________________ 9. AUTRES PERSONNES OU BIENS TOUCHÉS PAR CETTE ENTREPRISE (nom, adresse postale et emplacement et au besoin la liste de ces personnes ou biens) _______________________________________________________________________________________________ ________________________________________________________________________________________________ _______________________________________________________________________________________________ 10. EFFETS PRÉVUS DE L’ENTREPRISE SUR L’ENVIRONNEMENT ET MESURES ATTÉNUANTES PROJETÉES _______________________________________________________________________________________________ _______________________________________________________________________________________________ _______________________________________________________________________________________________ 17 11. CONTRACTOR AND SUB-CONTRACTORS (names, addresses and functions) _______________________________________________________________________________________________ _______________________________________________________________________________________________ _______________________________________________________________________________________________ _______________________________________________________________________________________________ _______________________________________________________________________________________________ 12. STUDIES UNDERTAKEN TO DATE (attach list if necessary) _______________________________________________________________________________________________ _______________________________________________________________________________________________ _______________________________________________________________________________________________ 13. PROPOSED TIME SCHEDULE Start date: _________________________ Completion date: _________________________ NAME: _________________________ (Print) TITLE: _________________________ (Print) SIGNATURE: ________________________ DATE: _________________________ FOR OFFICE USE ONLY APPLICATION FEE Amount: $ _____________ Receipt No.: _______________ WATER USE DEPOSIT Amount: $ _____________ Receipt No.: _______________ 18 11. ENTREPRENEUR ET SOUS-TRAITANTS (noms, adresses et fonctions) _________________________________________________________________________________________________ ________________________________________________________________________________________________ _______________________________________________________________________________________________ ________________________________________________________________________________________________ _______________________________________________________________________________________________ 12. ÉTUDES EFFECTUÉES À CE JOUR (Annexer une liste au besoin.) _________________________________________________________________________________________________ _______________________________________________________________________________________________ ________________________________________________________________________________________________ 13. CALENDRIER DES TRAVAUX PROJETÉS Début : _________________________ Achèvement : _________________________ NOM : __________________________ (en lettres moulées) TITRE : _________________________ (en lettres moulées) SIGNATURE : __________________________ DATE : _________________________ À L’USAGE EXCLUSIF DU BUREAU DROIT RELATIF À LA DEMANDE Montant : _______$ Numéro de reçu : _______________ DÉPÔT POUR UTILISATION DES EAUX Montant : _______$ Numéro de reçu : _______________ 19 SCHEDULE D (Sections 4 and 7) LICENCING CRITERIA FOR INDUSTRIAL UNDERTAKINGS Item Column I Column II Column III Column IV Water Use/Deposit of Waste Water Use and Deposit of Water use and deposit of Water Use and Waste Permitted Without a Waste Requiring a Type "B" Deposit of Waste Licence Licence Requiring a Type "A" Licence 1. Direct water use in respect of Use of less than 100 m3 per Use of 100 or more cubic None (a) oil and gas exploration; and day* metres per day* (b) any other industrial Use of less than 100 m3 per Use of 100 or more cubic Use of 300 or more undertaking day* metres per day and less than cubic metres per 300 cubic metres per day* day* 2. (1) Watercourse crossings, Construction of a structure Construction of a structure None including pipelines, bridges across a watercourse less across a watercourse 5 or more and roads than 5 metres wide at metres wide at ordinary high ordinary high water mark at water mark at point of point of construction construction (2) Watercourse training, Training All other watercourse training None including channel and bank (a) of intermittent alterations, culverts, spurs, watercourses, erosion control and (b) of watercourses that artificial accretion are less than 5 m wide at the ordinary high water mark at the point of training, (c) involving in-filling of a watercourse with no inflow or outflow and with a surface area of less than 0.5 ha, or (d) involving removal or placement of less than 100 m3 of material, if cross-sectional area is not significantly changed at point of removal or placement 20 ANNEXE D (articles 4 et 7) CRITÈRES POUR LA DÉLIVRANCE DE PERMIS — ENTREPRISE INDUSTRIELLE Article Colonne I Colonne II Colonne III Colonne IV Utilisation des eaux/ Utilisation des eaux et dépôt Utilisation des eaux et dépôt Utilisation des eaux Dépôt de déchets de déchets autorisés sans de déchets nécessitant un et dépôt de déchets permis permis de Type B nécessitant un permis de Type A 1. Utilisation directe des eaux pour : Utilisation inférieure à Utilisation de 100 m3 ou plus Aucun a) la recherche du pétrole et du 100 m3 par jour* par jour* gaz; b) toute autre entreprise Utilisation inférieure à Utilisation de 100 m3 ou plus Utilisation de industrielle 100 m3 par jour* par jour mais inférieure à 300 m3 ou plus par 300 m3 par jour* jour* 2. (1) Traverses de cours d’eau, y Construction d’une structure Construction d’une structure Aucun compris les pipelines, les en travers d’un cours d’eau en travers d’un cours d’eau ponts et les routes d’une largeur de moins de 5 m d’une largeur de 5 m ou plus à à l’endroit de la construction, l’endroit de la construction, mesurée à la laisse des hautes mesurée à la laisse des hautes eaux ordinaire eaux ordinaire (2) Correction de cours d’eau, y Correction : Toutes les autres corrections Aucun compris les modifications a) soit de cours d’eau de cours d’eau aux canaux et aux rives, les intermittents; buses, les épis b) soit de cours d’eau d’ensablement, la lutte d’une largeur de contre l’érosion et les moins de 5 m à accrétions artificielles l’endroit de la correction, mesurée à la laisse des hautes eaux ordinaire; c) soit comportant le remplissage d’un cours d’eau don’t la surface est inférieure à 0,5 hectare et dans lequel il n’y a aucune entrée ou sortie d’eau; d) soit comportant l’enlèvement ou l’adjonction de moins de 100 m3 de matériaux si l’aire de la section mouillée du cours d’eau est peu modifiée à l’endroit de l’enlèvement ou de l’ajout. 21 (3) Flood Control Construction of a temporary Construction of a permanent None structure in-stream structure (4) Diversions Diversion of a watercourse All other diversions None that is less than 2 m wide at ordinary high water mark at point of diversion (5) Alteration of flow or storage Off-stream storage of a Off-stream storage of a All other alterations by means of dams or dikes quantity of water less than or quantity of water greater than or storage equal to 2,500 m3 2500 m3 and less than 60,000 m3 or in-stream storage of a quantity of water less than 60,000 m3 3.
Part document.segment-2
Waters Regulation 1 — segment 2
- document.segment-2 Verify source ↗
Waters Regulation 1 — segment 2
This part sets licensing thresholds for water use and waste deposits for several undertaking types, including mining and milling, municipal, power, and agricultural/miscellaneous activities.
Deposit of waste in conjunction Deposit of drill waste by Deposit of drill waste to a Deposit of drill with injection into an underground sump waste other than (a) oil and gas exploration formation or reservoir that is deposit of drill authorized under waste to a sump or paragraph 5(1)(b) of the Oil by injection into an and Gas Operations Act underground formation or reservoir (b) oil and gas production, Deposit of drill waste by None Deposit of waste processing and refining injection into an underground other than deposit of formation or reservoir that is drill waste by authorised under paragraph injection into an 5(1)(b) of the Oil and Gas underground Operations Act formation or reservoir (c) quarrying and gravel Deposit of waste in Deposit of waste in None washing, conjunction with quarrying conjunction with quarrying above ordinary high water below ordinary high water mark if there is no direct or mark or deposit of waste in indirect deposit of waste to conjunction with quarrying surface water above ordinary high water if there is a direct or indirect deposit of waste to surface water (d) hydrostatic testing, deposit of waste associated deposit of waste associated None with cleaning or testing of with cleaning or testing of previously unused storage used storage tanks of pipelines tanks or pipelines (e) cooling, or deposit of waste that does notdeposit of biocides or None contain biocides or condition conditioners (f) other industrial undertakings None All None *Does not include water taken from an artificial reservoir with no natural inflow 22 (3) Lutte contre l’inondation Construction d’une structure Construction d’une structure Aucun temporaire permanente dans un cours d’eau (4) Détournements Détournement de cours d’eau Tous les autres détournements Aucun d’une largeur de moins de 2 m à l’endroit du détournement, mesurée à la laisse des hautes eaux ordinaire (5) Modification du débit ou Accumulation d’eau à Accumulation d’eau à Toutes les autres accumulation à l’aide de l’extérieur d’un cours d’eau l’extérieur d’un cours d’eau modifications du barrages ou de digues inférieure ou égale à supérieure à 2 500 m3 et d é b i t o u 2 500 m3 inférieure à 60 000 m3 ou accumulations d’eau accumulation d’eau dans un cours d’eau inférieure à 60 000 m3 3. Dépôt de déchets dû à l’un des facteurs suivants : a) recherche du pétrole et du Dépôt de déchets de forage Dépôt de déchets de forage Tout autre dépôt de gaz; par injection dans une dans un puisard déchets de forage formation souterraine ou un ailleurs que dans un réservoir souterrain autorisé puisard ou autrement en vertu de l’alinéa 10(1)b) que par injection de la Loi sur les opérations dans une formation pétrolières souterraine ou un réservoir souterrain b) production, traitement et Dépôt de déchets de forage Aucun Tout dépôt de raffinage du pétrole et du par injection dans une déchets autre que le gaz; formation souterraine ou un dépôt de déchets de réservoir souterrain autorisé forage par injection en vertu de l’alinéa 10(1)b) dans une formation de la Loi sur les opérations souterraine ou un pétrolières réservoir souterrain c) exploitation de carrières et Dépôt de déchets dû à Dépôt de déchets dû à Aucun débourbage du gravier; l’exploitation de carrières l’exploitation de carrières au-dessus de la laisse des au-dessous de la laisse des hautes eaux ordinaire si hautes eaux ordinaire ou dépôt aucun dépôt direct ou de déchets dû à l’exploitation indirect dans les eaux de de carrières au-dessus de la surface laisse des hautes eaux ordinaire si dépôt direct ou indirect dans les eaux de surface d) essais hydrauliques; Un dépôt de déchets dû au Un dépôt de déchets dû au Aucun nettoyage ou à la mise à nettoyage ou à la mise à l’essai de réservoirs de l’essai de réservoirs de stockage jamais utilisés ou de stockage usagés ou de pipelines jamais utilisés pipelines usagés e) refroidissement; Un dépôt de déchets ne Un dépôt de biocides ou de Aucun contenant pas de biocides ou conditionneurs d’eau de conditionneurs d’eau f) autres entreprises industrielles. Aucun Tous les dépôts de déchets Aucun *Ne comprend pas l’eau prise dans un réservoir artificiel non alimenté par un afflux naturel. 23 SCHEDULE E (Sections 4 and 7) LICENCING CRITERIA FOR MINING AND MILLING UNDERTAKINGS Item Column I Column II Column III Column IV Water Use/Deposit of Water Water Use and Deposit of Water Use and Deposit of Water Use and Waste Permitted Without a Waste Requiring a Type "B" Deposit of Waste Licence Licence Requiring a Type "A" Licence 1. Direct Water Use Use of less than 100 m3 Use of water for milling at a Use of water for metres per day* rate of less than 100 tonnes of milling at a rate of ore per day, use of water for 100 or more tonnes leaching other than production of ore per day or use leaching or use of 100 or more of water for cubic metres per day for production leaching undertakings other than milling or production leaching* 2. (1) Watercourse crossings, Construction of a structure Construction of a structure None including pipelines, bridges across a watercourse less across a watercourse 5 or more and roads thank 5 metres wide at metres wide at ordinary high ordinary high water mark at water mark at point of point of construction construction (2) Watercourse training Training All other watercourse training None including channel and bank (a) of intermittent alterations, culverts, spurs, watercourses, erosion control. and artificial (b) of watercourses that accretion are less than 5 m wide at the ordinary high water mark at the point of training (c) involving infilling of a watercourse with no inflow or outflow and with a surface area of less than 0.5 ha, or (d) involving removal or placement of less than 100 m3 of material, where cross-sectional area not significantly changed at point of removal or placement 24 ANNEXE E (articles 4 et 7) CRITÈRES POUR LA DÉLIVRANCE DE PERMIS — ENTREPRISE D’EXPLOITATION ET DE BROYAGE DU MINERAI Article Colonne I Colonne II Colonne III Colonne IV Utilisation des eaux/ Utilisation des eaux et dépôt Utilisation des eaux et dépôt Utilisation des eaux Dépôt de déchets de déchets autorisés sans de déchets nécessitant un et dépôt de déchets permis permis de Type B nécessitant un permis de Type A 1. Utilisation directe des eaux Utilisation inférieure à Utilisation des eaux pour le Utilisation de l’eau 100 m3* par jour broyage de moins de pour le broyage de 100 tonnes métriques de 100 tonnes minerai par jour, utilisation métriques ou plus des eaux pour la lixiviation à de minerai par jour des fins autres que la ou utilisation des production ou utilisation de eaux pour la 100 m3* ou plus par jour à lixiviation aux fins d’autres fins de production 2. (1) Traverses de cours d’eau, y Construction d’une structure Construction d’une structure Aucun compris les pipelines, les en travers d’un cours d’eau en travers d’un cours d’eau ponts et les routes d’une largeur de moins de d’une largeur de 5 m ou plus à 5 m à l’endroit de la l’endroit de la construction, construction, mesurée à la mesurée à la laisse des hautes laisse des hautes eaux eaux ordinaire ordinaire (2) Correction de cours d’eau, y Correction : compris les modifications a) soit de cours d’eau aux canaux et aux rives, les intermittents; buses, les épis b) soit de cours d’eau d’ensablement, la lutte d’une largeur de contre l’érosion et les moins de 5 m à accrétions artificielles l’endroit de la correction, mesurée à la laisse des hautes eaux ordinaire; c) soit comportant le remplissage d’un cours d’eau dont la surface est inférieure à 0,5 hectare et dans lequel il n’y a aucune entrée ou sortie d’eau; d) soit comportant l’enlèvement ou l’adjonction de moins de 100 m3 de matériaux si l’aire de la section mouillée du cours d’eau est peu modifiée à l’endroit de l’enlèvement ou de l’ajout. 25 (3) Flood Control Construction of a temporary Construction of a permanent None structure in-stream structure (4) Diversion Diversion of a watercourse All other diversion that is less than 2 metres wide at ordinary high water mark at point of diversion (5) Alteration of flow or storage Off-stream storage of a Off-stream storage of a by means of dams or dikes quantity of water less than or quantity of water greater than equal to 2, 500 m3 2 500 m3 and less than 60 000 m3, or in-stream storage of a quantity of water less than 60 000 m3 3. Deposit of waste in conjunction Any deposit of waste in Any deposit of waste in None with conjunction with conjunction with mechanized (a) placer mining, or non-mechanized in-stream in-stream placer operations or placer operation or with with any operations where out-of-stream watercourse chemical additives are used placer or testing operations, where no chemical additives are used and there is no direct or indirect deposit of waste to surface water (b) other mining and milling Any deposit of waste, other Any direct or indirect deposit Deposit of waste than from milling, where or waste to surface waters, or from milling at a there is no direct or indirect any deposit of waste from rate of 100 tonnes deposit to surface water milling at a rate of less than or more of ore per 100 tonnes of ore per day day *Does not include water taken from an artificial reservoir with no natural inflow. 26 (3) Lutte contre l’inondation Construction d’une structure Construction d’une structure Aucun temporaire permanente dans un cours d’eau (4) Détournements Détournement de cours d’eauTous les autres détournements Aucun d’une largeur de moins de 2 m à l’endroit du détournement, mesurée à la laisse des hautes eaux ordinaire (5) Modification du débit ou Accumulation d’eau à Accumulation d’eau à Toute autre accumulation à l’aire de l’extérieur d’un cours d’eau l’extérieur d’un cours d’eau accumulation d’eau barrages ou de daggas inférieure ou égale à supérieure à 2 500 m3 et ou modification du 2 500 m3 inférieure à 60 000 m3 ou débit accumulation d’eau dans un cours d’eau inférieure à 60 000 m3 3. Dépôt de déchets dû à l’un des facteurs suivants : a) exploitation de placers; Tout dépôt de déchets dû à Tout dépôt de déchets dû à Aucun l’exploitation sans l’exploitation avec mécanisation de placers dans mécanisation de placers dans un cours d’eau ou dû à un cours d’eau ou comportant l’exploitation de placers ou à l’usage d’additifs chimiques des mises à l’essai à l’extérieur d’un cours d’eau, sauf s’il s’agit d’un dépôt comportant l’usage d’additifs chimiques ou d’un dépôt direct ou indirect de déchets dans les eaux de surface b) toute autre entreprise Tout dépôt de déchets qui Tout dépôt direct ou indirect Dépôt de déchets dû d’exploitation et de broyage. n’est pas dû au broyage de de déchets dans les eaux de au broyage de minerai, s’il n’y a pas de surface ou tout dépôt de 100 tonnes dépôt direct ou indirect de déchets dû au broyage de métriques ou plus déchets dans les eaux de moins de 100 tonnes de minerai par jour surface métriques de minerai par jour *Ne comprend pas l’eau prise dans un réservoir artificiel non alimenté par un afflux naturel. 27 SCHEDULE F (Sections 4 and 7) LICENCING CRITERIA FOR MUNICIPAL UNDERTAKINGS Item Column I Column II Column III Column IV Water Use/Deposit of Waste Water Use and Deposit of Water use and Deposit of Water use and Waste Permitted Without a Waste Requiring a Type B Deposit of Waste Licence Licence Requiring a Type "A" Licence 1. Direct water use Use of less than 50 m3 per Use of 50 or more cubic Use of 2,000 or day* metres and less than 2,000 m3 more cubic metres per day* per day* 2. (1) Watercourse crossings, Construction of a structure Construction of a structure None including pipelines, bridges across a watercourse less across a watercourse 5 or more and roads than 5 m in width at ordinary metres in width at ordinary high water mark at point of high water mark at point of construction construction (2) Watercourse training, Training All other watercourse training None including channel and bank (a) of intermittent alterations, culverts, spurs, watercourses, erosion control and artificial (b) of watercourses that accretion are less than 5 m wide at the ordinary high water mark at the point of training, (c) involving infilling of a watercourse with no inflow or outflow and with a surface area of less than 0.5 ha, or (d) involving removal or placement of less than 100 m3 of material if cross sectional area is not significantly changed at point of removal or placement (3) Flood control Construction of a temporary Construction of a permanent None structure in-stream structure 28 ANNEXE F (articles 4 et 7) CRITÈRES POUR LA DÉLIVRANCE DE PERMIS — ENTREPRISE MUNICIPALE Article Colonne I Colonne II Colonne III Colonne IV Utilisation des eaux/Dépôt de Utilisation des eaux et dépôt Utilisation des eaux et dépôt Utilisation des eaux déchets de déchets autorisés sans de déchets nécessitant un et dépôt de déchets permis permis de Type B nécessitant un permis de Type A 1. Utilisation directe des eaux Utilisation inférieure à Utilisation de 50 m3* ou plus Utilisation de 50 m3* par jour par jour mais de moins de 2 000 m3* ou plus 2 000 m3* par jour par jour 2. (1) Traverses de cours d’eau, y Construction d’une structure Construction d’une structure Aucun compris les pipelines, les en travers d’un cours d’eau en travers d’un cours d’eau ponts et les routes d’une largeur de moins de d’une largeur de 5 m à 5 m à l’endroit de la l’endroit de la construction, construction, mesurée à la mesurée à la laisse des hautes laisse des hautes eaux eaux ordinaire ordinaire (2) Correction de cours d’eau, y Correction : Toutes les autres corrections Aucun compris les modifications a) soit de cours d’eau de cours d’eau aux canaux et aux rives, les intermittents; accrétions artificielles, les b) soit de cours d’eau épis d’ensablement, les d’une largeur de quais, la lutte contre moins de 5 m à l’érosion et la protection des l’endroit de la rives correction, mesurée à la laisse des hautes eaux ordinaire; c) soit comportant le remplissage d’un cours d’eau don’t la surface est inférieure à 0,5 hectare et dans lequel il n’y a aucune entrée ou sortie d’eau; d) soit comportant l’enlèvement ou l’adjonction de moins de 100 m3 de matériaux si l’aire de la section mouillée du cours d’eau est peu modifiée à l’endroit de l’enlèvement ou de l’ajout. (3) Lutte contre l’inondation Construction d’une structure Construction d’une structure Aucun temporaire permanente dans un cours d’eau 29 (4) Diversion Diversion of a watercourse All other diversions None that is less than 2 m wide at ordinary high water mark at point of diversion (5) Alteration of flow or storage Off-stream storage of a Off-stream storage of a All other alterations by means of dams or dikes quantity of water less than or quantity of water greater than or storage equal to 2,500 m3 2,500 m3 and less than 60,000 m3, or in-stream storage of a quantity of water less than 60,000 m3 3. Deposit of waste by A deposit of waste in A deposit of waste by means A deposit of waste (a) municipalities or settlements accordance with the Public of sewage collection or by means of a Sewerage Systems treatment system serving a sewage collection or Regulations by a city, town, population of between 50 and treatment system village or settlement serving 2,000 serving a population 50 or fewer people if there is of 2,000 or more no direct or indirect deposit of waste to surface waters (b) camps or lodges A deposit of waste in A deposit of waste by a camp None accordance with the General or a lodge with capacity of Sanitation Regulations by a more than 50 occupants per camp or lodge serving 50 or day or a direct or indirect fewer people, if there is no deposit of waste to surface direct or indirect deposit to waters surface waters *Does not include water taken from an artificial reservoir with no natural inflow. 30 (4) Détournements Détournement de cours d’eauTous les autres détournements Aucun d’une largeur de moins de 2 m à l’endroit du détournement, mesurée à la laisse des hautes eaux ordinaire (5) Modification du débit ou Accumulation d’eau à Accumulation d’eau à Toute autre accumulation à l’aire de l’extérieur d’un cours d’eau l’extérieur d’un cours d’eau modification du barrages ou de daggas inférieure ou égale à supérieure à 2 500 m3 et d é b i t o u 2 500 m3 inférieure à 60 000 m3 ou accumulation d’eau accumulation d’eau dans un cours d’eau inférieure à 60 000 m3 3. Dépôt de déchets provenant : Un dépôt de déchets Un dépôt de déchets au moyen Un dépôt de déchets a) des municipalités ou provenant d’une ville, d’un d’un système de collecte ou de au moyen d’un localités; village, ou d’une localité traitement des eaux usées système de collecte desservant 50 personnes ou desservant une population de ou de traitement des moins, qui est effectué en 50 à 2 000 personnes eaux usées conformité avec le Règlement desservant une sur les réseaux d’égouts population de publics, sauf s’il s’agit d’un 2 000 personnes ou dépôt direct ou indirect de plus déchets dans les eaux de surface b) des camps ou hôtels Un dépôt de déchets Un dépôt provenant d’un Aucun pavillonnaires. provenant d’un camp ou d’un camp ou d’un hôtel hôtel pavillonnaire, qui pavillonnaire d’une capacité desservent 50 personnes ou de plus de 50 occupants par moins, effectué en jour ou un dépôt direct ou conformité avec le Règlement indirect dans les eaux de sur la salubrité publique, surface sauf s’il s’agit d’un dépôt direct ou indirect dans les eaux de surface *Ne comprend pas l’eau prise dans un réservoir artificiel non alimenté par un afflux naturel. 31 SCHEDULE G (Sections 4 and 7) LICENSING CRITERIA FOR POWER UNDERTAKINGS Item Column I Column II Column III Column IV Water Use/Deposit of Waste Water Use and Deposit of Water Use and Deposit of Water Use and Waste Permitted Without a Waste Requiring a Type "B" Deposit of Waste Licence Licence Requiring a Type "A" Licence 1. Direct water use None Class 0 Classes 1 through 6 2. (1) Watercourse crossings Construction of a structure Construction of a structure None including pipelines, bridges across a watercourse less across a watercourse 5 or more and roads than 5 metres wide at metres wide at ordinary high ordinary high water mark at water mark at point of point of construction construction (2) Watercourse training Training All other watercourse training None including channel and bank (a) of intermittent alternations, culverts, spurs, watercourses erosion control and artificial (b) of watercourses that are accretion less than 5 metres wide at the ordinary high water mark at the point of training, (c) involving infilling of a watercourse with no inflow or outflow and with a surface area of less than 0.5 ha, or (d) involving removal or placement of less than 100 m3 of material if cross sectional area is not significantly changed at point of removal or placement (3) Flood Control Construction of a temporary Construction of a permanent None structure in-stream structure 32 ANNEXE G (articles 4 et 7) CRITÈRES POUR LA DÉLIVRANCE DE PERMIS — ENTREPRISE DE PRODUCTION D’ÉLECTRICITÉ Article Colonne I Colonne II Colonne III Colonne IV Utilisation des eaux/ Utilisation des eaux et dépôt Utilisation des eaux et dépôt Utilisation des eaux Dépôt de déchets de déchets autorisés sans de déchets nécessitant un et dépôt de déchets permis permis de type B nécessitant un permis de type A 1. Utilisation directe des eaux Aucun Classe 0 Classes 1 à 6 2. (1) Traverses de cours d’eau, y Construction d’une structure Construction d’une structure Aucun compris les pipelines, les en travers d’un cours d’eau en travers d’un cours d’eau ponts et les routes d’une largeur de moins de d’une largeur de 5 m ou plus à 5 m à l’endroit de la l’endroit de la construction, construction, mesurée à la mesurée à la laisse des hautes laisse des hautes eaux eaux ordinaire ordinaire (2) Correction de cours d’eau, y Correction : Toutes les autres corrections Aucun compris les modifications a) soit de cours d’eau de cours d’eau aux canaux et aux rives, les intermittents; buses, les épis b) soit de cours d’eau d’ensablement, la lutte d’une largeur de moins contre l’érosion et les de 5 m à l’endroit de la accrétions artificielles correction, mesurée à la laisse des hautes eaux ordinaire; c) soit comportant le remplissage d’un cours d’eau don’t la surface est inférieure à 0,5 hectare et dans lequel il n’y a aucune entrée ou sortie d’eau; d) soit comportant l’enlèvement ou l’adjonction de moins de 100 m3 de matériaux si l’aire de la section mouillée du cours d’eau est peu modifiée à l ’ e n d r o i t d e l’enlèvement ou de l’ajout. (3) Lutte contre l’inondation Construction d’une structure Construction d’une structure Aucun temporaire permanente dans un cours d’eau 33 (4) Diversions Diversion of a watercourse All other diversions None that is less than 2 metres wide at ordinary high water mark at point of diversion (5) Alteration of flow or storage Off-stream storage of a Off-stream storage of a All other alterations by means of dams or dikes quantity of water less than or quantity of water greater than of flow or storage equal to 2,500 m3 2,500 m3 and less than 60,000 m3 or in-stream storage of a quantity of water less than 60,000 m3 34 (4) Détournements Détournement de cours d’eauTous les autres détournements Aucun d’une largeur de moins de 2 m à l’endroit du détournement, mesurée à la laisse des hautes eaux ordinaire (5) Modification du débit ou Accumulation d’eau à Accumulation d’eau à Toute autre accumulation à l’aire de l’extérieur d’un cours d’eau l’extérieur d’un cours d’eau modification du barrages ou de daggas inférieure ou égale à supérieure à 2 500 m3 et d é b i t o u 2 500 m3 inférieure à 60 000 m3 ou accumulation d’eau accumulation d’eau dans un cours d’eau inférieure à 60 000 m3 35 SCHEDULE H (Sections 4 and 7) LICENSING CRITERIA FOR AGRICULTURAL, CONSERVATION, RECREATIONAL AND MISCELLANEOUS UNDERTAKINGS Item Column I Column II Column III Column IV Water use/Deposit of Waste Water Use and Deposit of Water Use and Deposit of Water use and Waste Permitted Without a Waste Requiring a Type "B" Deposit of Waste Licence Licence Requiring a Type "A" Licence 1. Direct water use Use of less than 100 m3 per Use of 100 or more cubic Use of 300 or more day or use for construction of metres per day and less than cubic metres per an ice bridge if the water 300 cubic metres per day* day* used is removed directly from the watercourse* 2. (1) Watercourse crossings Construction of a structure Construction of a structure None including pipelines, bridges across a watercourse that is across a watercourse that is 5 and roads less than 5 metres wide at metres or more in width at ordinary high water mark at ordinary high water mark at point of construction point of construction (2) Watercourse training Training All other watercourse training None including channel and bank (a) of intermittent alterations, spurs, culverts, watercourses, erosion control and artificial (b) of watercourses that are accretion less than 5 metres wide at the ordinary high water mark at the point of training, (c) involving infilling of a watercourse with no inflow or outflow and with a surface area of less than 0.5 ha, or (d) involving removal or placement of less than 100 m3 of material if cross sectional area is not significantly changed at point of removal or placement (3) Flood Control Construction of a temporary Construction of a permanent None structure in-stream structure 36 ANNEXE H (articles 4 et 7) CRITÈRES POUR LA DÉLIVRANCE DE PERMIS — ENTREPRISE AGRICOLE, DE CONSERVATION, RÉCRÉATIVE OU DIVERSE Article Colonne I Colonne II Colonne III Colonne IV Utilisation des eaux Utilisation des eaux et dépôt Utilisation des eaux et dépôt Utilisation des eaux Dépôt de déchets de déchets autorisés sans de déchets nécessitant un et dépôt de déchets permis permis de Type B nécessitant un permis de Type A 1. Utilisation directe des eaux Utilisation inférieure à 100 Utilisation de 100 m3* ou plus Utilisation de m3* par jour ou utilisation par jour et de moins de 300 m3* ou plus par pour la construction d’un 300 m3* par jour jour pont de glace si l’eau est directement prise dans le cours d’eau 2. (1) Traverses de cours d’eau, y Construction d’une structure Construction d’une structure Aucun compris les pipelines, les en travers d’un cours d’eau en travers d’un cours d’eau ponts et les routes d’une largeur de moins de d’une largeur de 5 m ou plus à 5 m à l’endroit de la l’endroit de la construction, construction, mesurée à la mesurée à la laisse des hautes laisse des hautes eaux eaux ordinaire ordinaire (2) Correction de cours d’eau, y Correction: Toutes les autres corrections Aucun compris les modifications a) soit de cours d’eau de cours d’eau aux canaux et aux rives, les intermittents; épis d’ensablement, les b) soit de cours d’eau buses, la lutte contre d’une largeur de moins l’érosion et les accrétions de 5 m à l’endroit de la artificielles correction, mesurée à la laisse des hautes eaux ordinaire; c) soit comportant le remplissage d’un cours d’eau don’t la surface est inférieure à 0,5 hectare et dans lequel il n’y a aucune entrée ou sortie d’eau; d) soit comportant l’enlèvement ou l’adjonction de moins de 100 m3 de matériaux si l’aire de la section mouillée du cours d’eau est peu modifiée à l ’ e n d r o i t d e l’enlèvement ou de l’ajout. (3) Lutte contre l’inondation Construction d’une structure Construction d’une structure Aucun temporaire permanente dans un cours d’eau 37 (4) Diversions Diversion of a watercourse All other diversions None that is less than 2 metres wide at ordinary high water mark at point of diversion (5) Alteration of flow or storage Off-stream storage of a Off-stream storage of a All other alterations by means of dams or dikes quantity less than or equal to quantity of water greater than of flow or storage 2,500 m3 2,500 m3 and less than 60,000 m3 or in-stream storage of a quantity of water less than 60,000 m3 3. Deposit of waste A deposit of waste if there is All other deposits of waste None no direct or indirect deposit to surface water *Does not include water taken from an artificial reservoir with no natural inflow. 38 (4) Détournements Détournement de cours d’eauTous les autres détournements Aucun d’une largeur de moins de 2 m à l’endroit du détournement, mesurée à la laisse des hautes eaux ordinaire (5) Modification du débit ou Accumulation d’eau à Accumulation d’eau à Toute autre accumulation à l’aire de l’extérieur d’un cours d’eau l’extérieur d’un cours d’eau accumulation d’eau barrages ou de daggas inférieure ou égale à supérieure à 2 500 m3 et ou modification du 2 500 m3 inférieure à 60 000 m3 ou débit accumulation d’eau dans un cours d’eau inférieure à 60 000 m3 3. Dépôt de déchets Tout dépôt de déchets sauf Tous les autres dépôts de Aucun s’il s’agit d’un dépôt direct déchets ou indirect dans les eaux de surface *Ne comprend pas l’eau prise dans un réservoir artificiel non alimenté par un afflux naturel. Printed by Imprimé par Territorial Printer, Northwest Territories l'imprimeur territorial, Territoires du Nord-Ouest Yellowknife, N.W.T./2014© Yellowknife (T. N.-O.)/2014© 39
Provision text is displayed from LexChat’s stored statute record. Use the official source links to verify amendments, commencement, and current legal force.
Ask AI about this statute
Waters Regulation 1
Sign in to ask AI about this statute
Sign in to start authenticated, citation-grounded statute research.
Sign inLexChat organizes source-backed legal information for research. Verify amendments, commencement, and current legal force with the official publisher before relying on it.