Oil And Gas Operations Regulation 3
This regulation sets out definitions, the Regulator’s powers, and the approval documents and plans needed for authorization and well work.
AI-assisted research synopsis — verify against the official legal text below.
- Jurisdiction
- Canada — Northwest Territories
- Instrument
- Regulation
- Version
- Undated source snapshot
- Language
- en
- Official source
- View official record ↗
Publicly available, excluded from search-engine indexing
This page remains available for direct access and API use, but this release emits
noindex,follow for the following reason:
- The record does not meet this release's canonical indexing criteria.
(emergency-noindex)
Statute overview
About this statute
This regulation sets out definitions, the Regulator’s powers, and the approval documents and plans needed for authorization and well work. The operator must keep required documents available, follow safety and environmental controls, stop unsafe or polluting work, and meet drilling and well-testing rules. This part requires operators to control offshore well, production, safety, training, and reporting activities, and it restricts certain actions like removing drilling installations, commingled production, flaring, venting, and burning oil unless stated conditions are met.
Search within this statute
Search all stored provisions in this version.
Legal text
Provisions of Oil And Gas Operations Regulation 3
Showing 3 of 3
Part document.segment-1
Oil And Gas Operations Regulation 3 — segment 1
- document.segment-1 Verify source ↗
Oil And Gas Operations Regulation 3 — segment 1
AI-assisted research summary: This regulation sets out definitions, the Regulator’s powers, and the approval documents and plans needed for authorization and well work.
OIL AND GAS OPERATIONS ACT LOI SUR LES OPÉRATIONS PÉTROLIÈRES OIL AND GAS DRILLING AND PRODUCTION RÈGLEMENT SUR LE FORAGE ET REGULATIONS L’EXPLOITATION DES PUITS DE R-027-2014 PÉTROLE ET DE GAZ In force April 1, 2014 R-027-2014 En vigueur le 1er avril 2014 AMENDED BY MODIFIÉ PAR This consolidation is not an official statement of the La présente codification administrative ne constitue pas law. It is an office consolidation prepared by le texte officiel de la loi; elle n'est établie qu'à titre Legislation Division, Department of Justice, for documentaire par les Affaires législatives du ministère convenience of reference only. The authoritative text de la Justice. Seuls les règlements contenus dans les of regulations can be ascertained from the Revised Règlements révisés des Territoires du Nord-Ouest Regulations of the Northwest Territories, 1990 and the (1990) et dans les parutions mensuelles de la Partie II monthly publication of Part II of the Northwest de la Gazette des Territoires du Nord-Ouest ont force Territories Gazette. de loi. This consolidation and other G.N.W.T. legislation can La présente codification administrative et les autres lois be accessed on-line at et règlements du G.T.N.-O. sont disponibles en direct à l’adresse suivante : http://www.justice.gov.nt.ca/Legislation/SearchLeg& Reg.shtml http://www.justice.gov.nt.ca/Legislation/SearchLeg& RegFR.shtml OIL AND GAS OPERATIONS ACT LOI SUR LES OPÉRATIONS PÉTROLIÈRES OIL AND GAS DRILLING AND RÈGLEMENT SUR LE FORAGE PRODUCTION REGULATIONS ET L’EXPLOITATION DES PUITS DE PÉTROLE ET DE GAZ The Commissioner in Executive Council, under Le commissaire en Conseil exécutif, en vertu de section 52 of the Oil and Gas Operations Act and every l’article 52 de la Loi sur les opérations pétrolières et de enabling power, makes the Oil and Gas Drilling and tout pouvoir habilitant, prend le Règlement sur le Production Regulations. forage et l’exploitation des puits de pétrole et de gaz. INTERPRETATION DÉFINITIONS ET INTERPRÉTATION 1. (1) In these regulations, 1. (1) Les définitions qui suivent s’appliquent au présent règlement. "abandoned", in relation to a well, means a well or part of a well that has been permanently plugged; «abandonné» Se dit d’un puits ou d’une partie d’un (abandonné) puits qui a été obturé de façon permanente. (abandoned) "artificial island" means a humanly constructed island to provide a site for the exploration and drilling, or the «approbation relative à un puits» Approbation accordée production, storage, transportation, distribution, par l’organisme de réglementation en vertu de measurement, processing or handling, of oil or gas; l’article 13. (well approval) (île artificielle) «autorisation» Autorisation délivrée par l’organisme de "authorization" means an authorization issued by the réglementation en vertu de l’article 10 de la Loi. Regulator under section 10 of the Act; (autorisation) (authorization) "barrier" means any fluid, plug or seal that prevents gas «barrière» Tout fluide, bouchon ou autre dispositif or oil or any other fluid from flowing unintentionally d’étanchéité qui empêche du gaz, du pétrole ou tout from a well or from a formation into another formation; autre fluide de s’écouler accidentellement soit d’une (barrière) formation à une autre soit d’un puits. (barrier) "casing liner" means a casing that is suspended from a «blessure entraînant une perte de temps de travail» string of casing previously installed in a well and does Blessure qui empêche un employé de se présenter au not extend to the wellhead; (tubage partiel) travail ou de s’acquitter efficacement de toutes les fonctions liées à son travail habituel les jours suivant le "commingled production" means production of oil and jour de l’accident, qu’il s’agisse ou non de jours gas from more than one pool or zone through a ouvrables pour lui. (lost or restricted workday injury) common well-bore or flow line without separate measurement of the production from each pool or zone; «blessure sans gravité» Lésion professionnelle, autre (production mélangée) qu’une blessure entraînant une perte de temps de travail, qui fait l’objet d’un traitement médical ou de "completed", in relation to a well, means a well that is premiers soins. (minor injury) prepared for production or injection operations; (complété) «câble» Câble renfermant un fil conducteur et servant à la manœuvre d’instruments de sondage ou d’autres "completion interval" means a section within a well that outils dans un puits. (wire line) is prepared to permit the (a) production of fluids from the well, «câble lisse» Câble en acier monobrin servant à la (b) observation of the performance of a manœuvre d’outils dans un puits. (slick line) reservoir, or (c) injection of fluids into the well; (intervalle «cessation» L’abandon, la complétion, ou la suspension de complétion) de l’exploitation d’un puits. (termination) 1 "conductor casing" means the casing that is installed in «complété» Se dit d’un puits qui a été préparé en vue a well to facilitate drilling of the hole for the surface de travaux de production ou d’injection. (completed) casing; (tubage initial) «conditions environnementales» Conditions "development plan" means the development plan that is météorologiques, océanographiques et conditions approved by the Regulator in accordance with connexes, notamment l’état des glaces, qui peuvent section 14 of the Act; (plan de mise en valeur) influer sur les activités visées par l’autorisation. (physical environmental conditions) "drilling program" means the program for the drilling of one or more wells within a specified area and time «contrôle d’un puits» Contrôle de la circulation des using one or more drilling installations and includes any fluides qui pénètrent dans un puits ou en sortent. (well work or activity related to the program; (programme de control) forage) «couche» Couche ou séquence de couches, y compris, "environmental protection plan" means the pour l’application de la définition de «production environmental protection plan submitted to the mélangée», de l’article 7, du paragraphe 61(2), des Regulator under section 6; (plan de protection de articles 64 à 66 et 73, du paragraphe 82(2) et de l’environnement) l’article 85, toute couche désignée comme telle par l’organisme de réglementation en vertu de l’article 4. "flow allocation procedure" means the procedure to (zone) (a) allocate total measured quantities of oil, gas and water produced from or injected «date de libération de l’appareil de forage» Date à into a pool or zone back to individual laquelle un appareil de forage a exécuté des travaux wells in a pool or zone where individual pour la dernière fois dans un puits. (rig release date) well production or injection is not measured separately, and «déchets» Détritus, rebuts, eaux usées, fluides (b) allocate production to fields that are using résiduels ou autres matériaux inutilisables produits au a common storage or processing facility; cours des activités de forage, des travaux relatifs à un (méthode de répartition du débit) puits ou des travaux de production, y compris les fluides et les déblais de forage usés ou excédentaires, "flow calculation procedure" means the procedure to be ainsi que l’eau produite. (waste material) used to convert raw meter output to a measured quantity of oil, gas or water; (méthode de calcul du «essai au prorata» Essai effectué dans un puits débit) d’exploitation visé par un plan de mise en valeur pour en mesurer le débit des fluides produits à des fins de "flow system" means the flow meters, auxiliary répartition. (proration test) equipment attached to the flow meters, fluid sampling devices, production test equipment, the master meter «essai d’écoulement de formation» Opération visant, and meter prover used to measure and record the rate selon le cas : and volumes at which fluids are a) à provoquer l’écoulement des fluides de (a) produced from or injected into a pool, formation vers la surface d’un puits afin (b) used as a fuel, d’obtenir des échantillons des fluides du (c) used for artificial lift, or réservoir et de déterminer les (d) flared or transferred from a production caractéristiques de l’écoulement de installation; (système d’écoulement) celui-ci; b) à injecter des fluides dans une formation "fluid" means gas, liquid or a combination of the two; afin d’évaluer l’injectivité. (formation (fluide) flow test) "formation flow test" means an operation «exploitant» Personne qui est titulaire à la fois d’un (a) to induce the flow of formation fluids to permis de travaux délivré en vertu de l’article 10 de la the surface of a well to procure reservoir Loi et d’une autorisation. (operator) fluid samples and determine reservoir flow characteristics, or 2 (b) to inject fluids into a formation to evaluate «fluide» Gaz, liquide ou combinaison des deux. (fluid) injectivity; (essai d’écoulement de formation) «fond marin» Partie de la croûte terrestre formant le fond des océans. (seafloor) "incident" means (a) an event that causes «île artificielle» Île construite de toutes pièces afin de (i) a lost or restricted workday injury, servir d’emplacement pour la prospection et le forage, (ii) death, ou pour la production, le stockage, le transport, la (iii) fire or explosion, distribution, la mesure, le traitement ou la manutention (iv) a loss of containment of any fluid du pétrole ou du gaz. (artificial island) from a well, (v) an imminent threat to the safety of a «incident» person, installation or support craft, a) Événement qui entraîne l’une ou l’autre or des situations suivantes : (vi) pollution; (i) une blessure entraînant une perte de (b) an event that results in a missing person; temps de travail, or (ii) une perte de vie, (c) an event that causes (iii) un incendie ou une explosion, (i) the impairment of any structure, (iv) une défaillance du confinement d’un facility, equipment or system critical fluide provenant d’un puits, to the safety of persons, an (v) une menace imminente à la sécurité installation or support craft, or d’une personne, d’une installation ou (ii) the impairment of any structure, d’un véhicule de service, facility, equipment or system critical (vi) de la pollution; to environmental protection; b) événement à la suite duquel une personne (incident) est portée disparue; c) événement qui nuit : "lost or restricted workday injury" means an injury that (i) soit au fonctionnement d’une prevents an employee from reporting for work or from structure, de matériel, d’un effectively performing all the duties connected with the équipement ou d’un système employee’s regular work on any day subsequent to the essentiel au maintien de la sécurité day on which the injury occurred whether or not that des personnes ou de l’intégrité d’une subsequent day is a working day for that employee; installation ou d’un véhicule de (blessure entraînant une perte de temps de travail) service, (ii) soit au fonctionnement d’une "minor injury" means an employment injury for which structure, de matériel, d’un medical treatment or first aid is provided and excludes équipement ou d’un système a lost or restricted workday injury; (blessure sans essentiel à la protection de gravité) l’environnement. (incident) "multi-pool well" means a well that is completed in «intervalle de complétion» Section aménagée dans un more than one pool; (puits à gisements multiples) puits en vue de l’une des activités suivantes : a) la production de fluides à partir du puits; "natural environment" means the physical and b) l’observation du rendement d’un biological environment; (milieu naturel) réservoir; c) l’injection de fluides dans le puits. "near-miss" means an event that would likely cause an (completion interval) event set out in paragraph (a) of the definition «méthode de calcul du débit» Méthode utilisée pour "incident" but does not, due to particular circumstances; convertir le débit brut d’un compteur en une quantité (quasi-incident) mesurée de pétrole, de gaz ou d’eau. (flow calculation procedure) "operator" means a person that holds an operating licence under section 10 of the Act and an «méthode de répartition du débit» Méthode servant à : authorization; (exploitant) a) répartir les quantités mesurées totales de 3 "permafrost" means the thermal condition of the ground pétrole, de gaz et d’eau qui sont produits when its temperature remains at or below 0EC for more par un gisement ou une couche ou y sont than one year; (pergélisol) injectés, entre les différents puits faisant partie d’un gisement ou d’une couche où "physical environmental conditions" means the la production ou l’injection n’est pas meteorological, oceanographic and related physical mesurée séparément pour chaque puits; conditions, including ice conditions, that might affect a b) répartir la production entre les champs où work or activity that is subject to an authorization; le stockage ou le traitement se fait dans (conditions environnementales) une installation commune. (flow allocation procedrue) "pollution" means the introduction into the natural environment of a substance or form of energy outside «milieu naturel» Milieu physique et biologique. the limits applicable to an activity that is subject to an (natural environment) authorization, including spills; (pollution) «pergélisol» Condition thermique du sol lorsque sa "production control system" means the system provided température est égale ou inférieure à 0EC pendant plus to control the operation of, and monitor the status of, d’un an. (permafrost) equipment for the production of oil and gas, and includes the installation and workover control system; «plan de mise en valeur» Plan de mise en valeur (système de contrôle de la production) approuvé par l’organisme de réglementation aux termes de l’article 14 de la Loi. (development plan) "production project" means an undertaking for the purpose of developing a production site on, or «plan de protection de l’environnement» Plan de producing oil or gas from, a pool or field, and includes protection de l’environnement remis à l’organisme de any work or activity related to the undertaking; (projet réglementation en vertu de l’article 6. (environmental de production) protection plan) "proration test" means, in respect of a development well «plan de sécurité» Plan en matière de sécurité remis à to which a development plan applies, a test conducted l’organisme de réglementation en vertu de l’article 6. to measure the rates at which fluids are produced from (safety plan) the well for allocation purposes; (essai au prorata) «pollution» Introduction dans le milieu naturel de toute "recovery" means the recovery of oil and gas under substance ou forme d’énergie au-delà des limites reasonably foreseeable economic and operational applicables à l’activité visée par l’autorisation. La conditions; (récupération) présente définition vise également les rejets. (pollution) "relief well" means a well drilled to assist in controlling «production mélangée» Production de pétrole et de gaz a blow-out in an existing well; (puits de secours) provenant de plusieurs gisements ou couches et circulant dans la même conduite ou dans le même trou "rig release date" means the date on which a rig last de sonde, sans mesurage distinct de la production de conducted well operations; (date de libération de chaque gisement ou couche. (commingled production) l’appareil de forage) «programme de forage» Programme relatif au forage "safety plan" means the safety plan submitted to the d’un ou de plusieurs puits, dans une région donnée et au Regulator under section 6; (plan de sécurité) cours d’une période déterminée, au moyen d’une ou de "seafloor" means the surface of all that portion of land plusieurs installations de forage. Y sont assimilées les under the sea; (fond marin) activités connexes au programme. (drilling program) «projet de production» Projet visant la mise en valeur "slick line" means a single steel cable used to run tools d’un emplacement de production ou la production de in a well; (câble lisse) pétrole ou de gaz à partir d’un champ ou d’un gisement, y compris les activités connexes au projet. (production "support craft" means a vessel, vehicle, aircraft, standby project) vessel or other craft used to provide transportation for or assistance to persons on the site where a work or 4 activity is conducted; (véhicule de service) «puits à gisements multiples» Puits complété dans plus d’un gisement. (multi-pool well) "surface casing" means the casing that is installed in a well to a sufficient depth, in a competent formation, to «puits de secours» Puits foré pour aider à contrôler establish well control for the continuation of the drilling l’éruption d’un puits existant. (relief well) operations; (tubage de surface) «quasi-incident» Événement qui serait susceptible "suspended", in relation to a well or part of a well, d’entraîner une des situations visées à l’alinéa a) de la means a well or part of a well in which drilling or définition de « incident » mais qui, en raison de production operations have temporarily ceased; circonstances particulières, n’en entraîne pas. (near (suspension de l’exploitation) miss) "termination" means the abandonment, completion or «reconditionnement» Opération pratiquée sur un puits suspension of a well’s operations; (cessation) complété et exigeant le retrait de la tête d’éruption ou du tube. (workover) "waste material" means any garbage, refuse, sewage or waste well fluids or any other useless material that is «récupération» Récupération de pétrole et de gaz dans generated during drilling, well or production operations, des conditions économiques et opérationnelles including used or surplus drilling fluid and drill cuttings normalement prévisibles. (recovery) and produced water; (déchets) «suspension de l’exploitation» S’agissant d’un puits ou "well approval" means the approval granted by the d’une partie d’un puits, interruption temporaire des Regulator under section 13; (approbation relative à un activités de forage ou des travaux de production. puits) (suspended) "well-bore" means the hole drilled by a bit in order to «système de contrôle de la production» Système make a well; (trou de sonde) servant au contrôle du fonctionnement de l’équipement de production de pétrole et de gaz et à la surveillance de "well control" means the control of the movement of son état, y compris le système de régulation de fluids into or from a well; (contrôle d’un puits) l’installation et du reconditionnement. (production control system) "well operation" means the operation of drilling, completion, recompletion, intervention, re-entry, «système d’écoulement» Les débitmètres et workover, suspension or abandonment of a well; l’équipement auxiliaire qui y est fixé, les dispositifs (travaux relatifs à un puits) d’échantillonnage de fluides, l’équipement pour les essais de production, le compteur principal et le "wire line" means a line that contains a conductor wire compteur étalon servant à mesurer et à enregistrer le and that is used to run survey instruments or other tools débit et le volume des fluides qui, selon le cas : in a well; (câble) a) sont produits par un gisement ou y sont injectés; "workover" means an operation on a completed well b) sont utilisés comme combustibles; that requires removal of the Christmas tree or the c) sont utilisés pour l’ascension artificielle; tubing; (reconditionnement) d) sont brûlés à la torche ou transférés d’une installation de production. (flow system) "zone" means any stratum or any sequence of strata and includes, for the purposes of the definition «travaux relatifs à un puits» Travaux liés au forage, à "commingled production", section 7, subsection 61(2), la complétion, à la remise en production, au sections 64 to 66 and 73, subsection 82(2) and reconditionnement, à la suspension de l’exploitation, à section 85, a zone that has been designated as such by l’abandon ou à la rentrée d’un puits ou à l’intervention the Regulator under section 4. (couche) dans un puits. (well operation) «trou de sonde» Trou foré au moyen d’un trépan pour le creusage d’un puits. (well-bore) 5 «tubage de surface» Tubage installé assez profondément dans un puits, dans une formation compétente, pour assurer le contrôle du puits en vue de la poursuite des travaux de forage. (surface casing) «tubage initial» Tubage installé dans un puits pour faciliter le forage du trou dans lequel sera introduit le tubage de surface. (conductor casing) «tubage partiel» Tubage suspendu à un train de tubage installé antérieurement dans un puits et qui n’atteint pas la tête du puits. (casing liner) «véhicule de service» Navire, véhicule, aéronef, navire de secours ou autre moyen de transport ou d’aide destiné aux personnes se trouvant à un emplacement où sont menées des activités. (support craft) (2) In these regulations, "delineation well", (2) Dans le présent règlement, «puits de "development well" and "exploratory well" have the délimitation», «puits d’exploitation» et «puits same meaning as in subsection 91(1) of the Petroleum d’exploration» s’entendent au sens du Resources Act. paragraphe 911(1) de la Loi sur les hydrocarbures. (3) In these regulations, "drilling installation", (3) Dans le présent règlement, «appareil de "drilling rig", "drilling unit", "drill site", "installation", forage», «emplacement de forage», «emplacement de "production installation", "production operation", production», «installation», «installation de forage», "production site" and "subsea production system" have «installation de production», «système de production the same meaning as in subsection 1(1) of the Oil and sous-marin», «travaux de production» et «unité de Gas Installations Regulations. forage» s’entendent au sens du paragraphe 1(1) du Règlement sur les installations pétrolières et gazières. (4) The following definitions apply for the (4) Les définitions qui suivent s’appliquent à purposes of section 10 of the Act: l’article 10 de la Loi. "production facility" means equipment for the «matériel de production» Équipement de production du production of oil or gas located at a production site, pétrole ou du gaz se trouvant à l’emplacement de including separation, treating and processing facilities, production, y compris le matériel de séparation, de equipment and facilities used in support of production traitement et de transformation, les équipements et le operations, landing areas, heliports, storage areas or matériel utilisés à l’appui des travaux de production, les tanks and dependent personnel accommodations, but aires d’atterrissage, les héliports, les aires ou les not including any associated platform, artificial island, réservoirs de stockage et les logements du personnel subsea production system, drilling equipment or diving connexes. La présente définition exclut toute system; (matériel de production) plate-forme, toute île artificielle, tout système de production sous-marin, tout équipement de forage et "production platform" means a production facility and tout système de plongée connexes. (production facility) any associated platform, artificial island, subsea production system, offshore loading system, drilling «plate-forme de production» S’entend de tout matériel equipment, facilities related to marine activities and de production, ainsi que de tout système de production dependent diving system. (plate-forme de production) sous-marin, plate-forme, île artificielle, système de chargement extracôtier, équipement de forage, matériel lié aux activités maritimes et système de plongée non autonome connexes. (production platform) 6 (5) For the purpose of section 15 of the Act, (5) Pour l’application de l’article 15 de la Loi, "installation" means an onshore or offshore installation. «installation» s’entend d’une installation terrestre ou extracôtière. (6) For the purpose of section 112 of the Act, an (6) Pour l’application de l’article 112 de la Loi, les onshore or offshore installation is prescribed as an installations terrestres et extracôtières sont des installation. installations désignées. PART 1 PARTIE 1 REGULATOR’S POWERS POUVOIRS DE L’ORGANISME DE RÉGLEMENTATION Spacing Espacement 2. The Regulator is authorized to make orders 2. L’organisme de réglementation est autorisé à respecting the allocation of areas, including the rendre des ordonnances concernant l’attribution de determination of the size of spacing units and the well secteurs, notamment en ce qui a trait à la dimension des production rates for the purpose of drilling for or unités d’espacement et au taux de production des puits producing oil and gas and to exercise any powers and aux fins de forage ou de production de pétrole ou de perform any duties that may be necessary for the gaz, et à exercer les attributions nécessaires à la gestion management and control of oil or gas production. et au contrôle de la production du pétrole et du gaz. Names and Designations Noms et désignations 3. The Regulator may give a name, classification or 3. L’organisme de réglementation peut attribuer un status to a well and may change that name, nom, une classe ou un statut à un puits et les modifier. classification or status. 4. The Regulator may also 4. L’organisme de réglementation peut en outre : (a) designate a zone for the purposes of these a) désigner comme telle une couche pour regulations; l’application du présent règlement; (b) give a name to a pool or field; and b) attribuer un nom à un gisement ou à un (c) define the boundaries of a pool, zone or champ; field for the purpose of identifying it. c) définir les limites d’un gisement, d’une couche ou d’un champ à des fins d’identification. PART 2 PARTIE 2 MANAGEMENT SYSTEM, APPLICATION FOR SYSTÈME DE GESTION, DEMANDE AUTHORIZATION AND WELL APPROVALS D’AUTORISATION ET APPROBATIONS RELATIVES À UN PUITS Management System Système de gestion 5. (1) The applicant for an authorization shall 5. (1) La personne qui demande une autorisation est develop an effective management system that integrates tenue d’élaborer un système de gestion efficace qui operations and technical systems with the management intègre les systèmes opérationnels et techniques et la of financial and human resources to ensure compliance gestion des ressources humaines et financières pour with the Act and these regulations. assurer l’observation de la Loi et du présent règlement. (2) The management system must include (2) Le système de gestion doit comprendre : (a) the policies on which the system is based; a) un énoncé des politiques qui en (b) the processes for setting goals for the constituent le fondement; 7 improvement of safety, environmental b) des processus permettant de fixer des protection and waste prevention; objectifs en vue d’améliorer la sécurité, la (c) the processes for identifying hazards and protection de l’environnement et la for evaluating and managing the prévention du gaspillage; associated risks; c) des processus permettant de repérer les (d) the processes for ensuring that personnel dangers et d’évaluer et maîtriser les are trained and competent to perform their risques connexes; duties; d) des processus permettant de veiller à ce (e) the processes for ensuring and que les membres du personnel soient maintaining the integrity of all facilities, formés et disposent des compétences structures, installations, support craft and nécessaires pour remplir leurs fonctions; equipment necessary to ensure safety, e) des processus permettant de garantir et de environmental protection and waste préserver l’intégrité du matériel, des prevention; structures, des installations, des véhicules (f) the processes for the internal reporting de service et des équipements nécessaires and analysis of hazards, minor injuries, à la sécurité, à la protection de incidents and near-misses and for taking l’environnement et à la prévention du corrective actions to prevent their gaspillage; recurrence; f) des processus permettant de signaler à (g) the documents describing all management l’interne et d’analyser les dangers, les system processes and the processes for blessures sans gravité, les incidents et les making personnel aware of their roles and quasi-incidents, et de prendre des mesures responsibilities with respect to them; correctives pour empêcher que ceux-ci ne (h) the processes for ensuring that all se reproduisent; documents associated with the system are g) des documents exposant tous les current, valid and have been approved by processus du système de gestion et les the appropriate level of authority; processus visant à faire connaître aux (i) the processes for conducting periodic membres du personnel leurs rôles et leurs reviews or audits of the system and for responsabilités à cet égard; taking corrective actions if reviews or h) des processus permettant de veiller à ce audits identify areas of non-conformance que tous les documents relatifs au système with the system and opportunities for soient à jour, valides et approuvés par le improvement; niveau décisionnel compétent; (j) the arrangements for coordinating the i) des processus permettant d’effectuer des management and operations of the examens ou des vérifications périodiques proposed work or activity among the du système et d’appliquer des mesures owner of the installation, the contractors, correctives lorsque les examens ou the operator and others, as applicable; and vérifications révèlent des manquements au (k) the name and position of the person système de gestion et des domaines accountable for the establishment and susceptibles d’amélioration; maintenance of the system and of the j) des dispositions concernant la person responsible for implementing it. coordination des fonctions de gestion et d’exploitation de l’activité projetée, entre le propriétaire de l’installation, les entrepreneurs, l’exploitant et les autres parties, selon le cas; k) le nom et le titre du poste de la personne qui doit répondre de l’élaboration et de la tenue du système de gestion et de la personne chargée de sa mise en œuvre. 8 (3) The management system documentation must (3) La documentation relative au système de be controlled and set out in a logical and systematic gestion doit être contrôlée et présentée d’une manière fashion to allow for ease of understanding and efficient logique et systématique pour en faciliter la implementation. compréhension et pour assurer l’application efficace du système. (4) The management system must correspond to (4) Le système de gestion doit être adapté à the size, nature and complexity of the operations and l’importance, à la nature et à la complexité des travaux activities, hazards and risks associated with the et des activités, ainsi que des dangers et risques operations. connexes. Application for Authorization Demande d’autorisation 6. The application for authorization must be 6. La demande d’autorisation doit être accompagnée accompanied by des documents et renseignements suivants : (a) a description of the scope of the proposed a) la description de l’étendue des activités activities; projetées; (b) an execution plan and schedule for b) un plan de mise en œuvre et un calendrier undertaking those activities; des activités projetées; (c) a safety plan that meets the requirements c) un plan de sécurité qui répond aux of section 8; exigences de l’article 8; (d) an environmental protection plan that d) un plan de protection de l’environnement meets the requirements of section 9; qui répond aux exigences de l’article 9; (e) information on any proposed flaring or e) des renseignements sur le brûlage de gaz venting of gas, including the rationale and à la torche ou le rejet de gaz dans the estimated rate, quantity and period of l’atmosphère qui sont prévus, y compris la the flaring or venting; raison du brûlage ou du rejet et une (f) information on any proposed burning of estimation du taux de rejet, des quantités oil, including the rationale and the de gaz qu’il est prévu de brûler ou de estimated quantity of oil proposed to be rejeter et de la période de temps au cours burned; de laquelle le brûlage ou le rejet aura lieu; (g) in the case of a drilling installation, a f) des renseignements sur le brûlage de description of the drilling and well control pétrole prévu, y compris la raison du equipment; brûlage et une estimation des quantités (h) in the case of a production installation, a qu’il est prévu de brûler; description of the processing facilities and g) dans le cas d’une installation de forage, la control system; description de l’équipement de forage et (i) in the case of a production project, a field de contrôle des puits; data acquisition program that allows h) dans le cas d’une installation de sufficient pool pressure measurements, production, la description du matériel de fluid samples, cased hole logs and transformation et du système de contrôle; formation flow tests for a comprehensive i) dans le cas d’un projet de production, un assessment of the performance of programme d’acquisition des données development wells, pool depletion relatives au champ, élaboré de manière à schemes and the field; permettre l’obtention des mesures de la (j) contingency plans, including emergency pression du gisement, des échantillons de response procedures, to mitigate the fluide, des diagraphies en puits tubé et des effects of any reasonably foreseeable essais d’écoulement de formation du puits event that might compromise safety or nécessaires à une évaluation complète de environmental protection, which must la performance des puits d’exploitation, (i) provide for coordination measures des scénarios d’épuisement du gisement et with any relevant municipal, du champ; provincial, territorial or federal j) des plans d’urgence, y compris des emergency response plan, and procédures d’intervention d’urgence, en 9 (ii) in an offshore area where oil is vue de réduire les conséquences de tout reasonably expected to be événement normalement prévisible qui encountered, identify the scope and pourrait compromettre la sécurité ou la frequency of the field practice protection de l’environnement, lesquels exercise of oil spill countermeasures; doivent : and (i) prévoir des mesures permettant leur (k) a description of the decommissioning and coordination avec tout plan abandonment of the site, including d’intervention d’urgence municipal, methods for restoration of the site after its provincial, territorial ou fédéral abandonment. pertinent, (ii) dans le cas d’une région extracôtière où du pétrole peut vraisemblablement être découvert, préciser l’étendue et la fréquence des exercices d’intervention en cas de rejet de pétrole; k) une description des procédures de désaffectation et d’abandon du site, y compris les méthodes de rétablissement du site après l’abandon. 7. (1) If the application for authorization covers a 7. (1) Si la demande d’autorisation vise une production installation, the applicant shall also submit installation de production, le demandeur soumet aussi to the Regulator for its approval the flow system, the à l’approbation de l’organisme de réglementation le flow calculation procedure and the flow allocation système d’écoulement et les méthodes de calcul et de procedure that will be used to conduct the répartition du débit qui seront utilisés pour effectuer le measurements referred to in Part 7. mesurage prévu à la partie 7. (2) The Regulator shall approve the flow system, (2) L’organisme de réglementation approuve le the flow calculation procedure and the flow allocation système d’écoulement et les méthodes de calcul et de procedure if the applicant demonstrates that the system répartition du débit si le demandeur établit qu’ils and procedures facilitate reasonably accurate permettent de déterminer de façon suffisamment précise measurements and allocate, on a pool or zone basis, the les mesures et répartit, par gisement ou couche, la production from and injection into individual wells. production et l’injection pour chaque puits. 8. The safety plan must set out the procedures, 8. Le plan de sécurité doit prévoir les procédures, les practices, resources, sequence of key safety-related pratiques, les ressources, la séquence des principales activities and monitoring measures necessary to ensure activités en matière de sécurité et les mesures de the safety of the proposed work or activity and must surveillance nécessaires pour assurer la sécurité des include activités projetées et doit en outre comporter : (a) a summary of and references to the a) un résumé du système de gestion et les management system that demonstrate how renvois à celui-ci qui démontrent sa mise it will be applied to the proposed work or en œuvre pendant le déroulement des activity and how the duties set out in these activités projetées et comment le système regulations with regard to safety will be de gestion permettra de se conformer aux fulfilled; obligations prévues par le présent (b) a summary of the studies undertaken to règlement en matière de sécurité; identify hazards and to evaluate safety b) un résumé des études réalisées pour cerner risks related to the proposed work or les dangers et évaluer les risques pour la activity; sécurité liés aux activités projetées; (c) a description of the hazards that were c) la description des dangers cernés et les identified and the results of the risk résultats de l’évaluation des risques; evaluation; d) un résumé des mesures pour éviter, (d) a summary of the measures to avoid, prévenir, réduire et contrôler les risques 10 prevent, reduce and manage safety risks; pour la sécurité; (e) a list of all structures, facilities, equipment e) une liste des structures, du matériel, de and systems critical to safety and a l’équipement et des systèmes qui sont summary of the system in place for their essentiels à la sécurité, ainsi qu’un résumé inspection, testing and maintenance; du système en place pour veiller à leur (f) a description of the organizational inspection, essai et entretien; structure for the proposed work or activity f) une description de la structure and the command structure on the organisationnelle relative à l’exécution installation, which clearly explains des activités projetées et de la structure de (i) their relationship to each other, and commandement de l’installation, qui (ii) the contact information and position indique clairement : of the person accountable for the (i) le lien entre les deux structures, safety plan and of the person (ii) le titre du poste et les coordonnées responsible for implementing it; de la personne qui répond du plan de (g) if the possibility of pack sea ice, drifting sécurité et de la personne chargée de icebergs or land-fast sea ice exists at the sa mise en œuvre; drill or production site, the measures to g) s’il risque d’y avoir des banquises address the protection of the installation, marines, des icebergs flottants ou des including systems for ice detection, banquises côtières sur les lieux de forage surveillance, data collection, reporting, ou de production, les mesures prévues forecasting and, if appropriate, ice pour assurer la protection de l’installation, avoidance or deflection; and y compris les systèmes de détection et de (h) a description of the arrangements for surveillance des glaces, de collecte des monitoring compliance with the plan and données, de signalement et de prévision for measuring performance in relation to et, s’il y a lieu, d’évitement ou de its objectives. déviation des glaces; h) une description des mécanismes de surveillance nécessaires pour veiller à ce que le plan soit mis en œuvre et pour évaluer le rendement au regard de ses objectifs. 9. The environmental protection plan must set out the 9. Le plan de protection de l’environnement doit procedures, practices, resources and monitoring prévoir les procédures, les pratiques, les ressources et necessary to manage hazards to and protect the les mesures de surveillance nécessaires pour gérer les environment from the proposed work or activity and dangers pour l’environnement et protéger celui-ci des must include activités projetées et doit en outre comporter : (a) a summary of and references to the a) un résumé du système de gestion et les management system that demonstrate how renvois à celui-ci qui démontrent sa mise it will be applied to the proposed work or en œuvre pendant le déroulement des activity and how the duties set out in these activités projetées et comment le système regulations with regard to environmental de gestion permettra de se conformer aux protection will be fulfilled; obligations prévues par le présent (b) a summary of the studies undertaken to règlement en matière de protection de identify environmental hazards and to l’environnement; evaluate environmental risks relating to b) un résumé des études réalisées pour cerner the proposed work or activity; les dangers pour l’environnement et (c) a description of the hazards that were évaluer les risques pour l’environnement identified and the results of the risk liés aux activités projetées; evaluation; c) une description des dangers cernés et les (d) a summary of the measures to avoid, résultats de l’évaluation des risques; prevent, reduce and manage d) un résumé des mesures prévues pour environmental risks; éviter, prévenir, réduire et contrôler les (e) a list of all structures, facilities, equipment risques pour l’environnement; 11 and systems critical to environmental e) une liste des structures, du matériel, de protection and a summary of the system in l’équipement et des systèmes essentiels à place for their inspection, testing and la protection de l’environnement, ainsi maintenance; qu’un résumé du système en place pour (f) a description of the organizational leur inspection, essai et entretien; structure for the proposed work or activity f) une description de la structure and the command structure on the organisationnelle relative à l’exécution installation, which clearly explains des activités projetées et de la structure de (i) their relationship to each other, and commandement de l’installation, qui (ii) the contact information and position indique clairement : of the person accountable for the (i) le lien entre les deux structures, environmental protection plan and (ii) le titre du poste et les coordonnées the person responsible for de la personne qui répond du plan de implementing it; protection de l’environnement et de (g) the procedures for the selection, la personne chargée de sa mise en evaluation and use of chemical substances œuvre; including process chemicals and drilling g) les procédures de sélection, d’évaluation fluid ingredients; et d’utilisation des substances chimiques, (h) a description of equipment and procedures y compris les produits chimiques utilisés for the treatment, handling and disposal of pour les procédés et les fluides de forage; waste material; h) une description de l’équipement et des (i) a description of all discharge streams and procédés de traitement, de manutention et limits for any discharge into the natural d’élimination des déchets; environment including any waste i) une description de toutes les voies material; d’évacuation et des limites relatives à (j) a description of the system for monitoring toute évacuation dans le milieu naturel, y compliance with the discharge limits compris l’évacuation des déchets; identified in paragraph (i), including the j) une description du système de contrôle sampling and analytical program to des limites d’évacuation visées à determine if those discharges are within l’alinéa i), y compris le programme the specified limits; and d’échantillonnage et d’analyse servant à (k) a description of the arrangements for vérifier si les limites sont respectées; monitoring compliance with the plan and k) une description des mesures prises pour for measuring performance in relation to contrôler la conformité au plan et en its objectives. évaluer le rendement au regard de ses objectifs. Well Approval Approbation relative au puits 10. (1) Subject to subsection (2), an operator who 10. (1) Sous réserve du paragraphe (2), l’exploitant intends to drill, re-enter, work over, complete or qui a l’intention de procéder, à l’égard d’un puits ou recomplete a well or suspend or abandon a well or part d’une partie de puits, à des travaux de forage, de of a well shall obtain a well approval. rentrée, de reconditionnement, de complétion, de remise en production, de suspension de l’exploitation ou d’abandon doit avoir reçu l’approbation afférente. (2) A well approval is not necessary to conduct a (2) Aucune approbation n’est nécessaire pour wire line, slick line or coiled tubing operation through exécuter des travaux par câble, par câble lisse ou par a Christmas tree located above sea level if tube de production concentrique au moyen d’une tête (a) the work does not alter the completion d’éruption installée au-dessus du niveau de la mer, si interval or is not expected to adversely les conditions suivantes sont réunies : affect recovery; and a) les travaux exécutés ne modifient pas (b) the equipment, operating procedures and l’état d’un intervalle de complétion ou ne qualified persons exist to conduct the wire devraient pas nuire à la récupération; 12 line, slick line or coiled tubing operations b) l’équipement, les marches à suivre et les as set out in the authorization. qualifications du personnel effectuant le travail sont conformes à l’autorisation. 11. If the well approval sought is to drill a well, the 11. La demande d’approbation relative à un puits qui application must contain vise le forage doit contenir : (a) a comprehensive description of the a) une description complète du programme drilling program; and de forage; (b) a well data acquisition program that b) un programme d’acquisition de données allows for the collection of sufficient relatives au puits élaboré de manière à cutting and fluid samples, logs, permettre l’obtention des échantillons de conventional cores, sidewall cores, déblais et de fluide, des diagraphies, des pressure measurements and formation carottes classiques, des carottes latérales, flow tests, analyses and surveys to enable des mesures de pression, des essais a comprehensive geological and reservoir d’écoulement de formation, des analyses evaluation to be made. et des levés nécessaires à une évaluation complète de la géologie et du réservoir. 12. A well approval application must contain 12. La demande d’approbation relative à un puits qui (a) if the well approval sought is to re-enter, vise les travaux ci-après doit contenir : work over, complete or recomplete a well a) s’agissant d’une rentrée ou de travaux de or suspend or abandon a well or part of it, reconditionnement, de complétion, de a detailed description of that well, the remise en production, de suspension de proposed work or activity and the l’exploitation ou d’abandon visant un rationale for conducting it; puits ou une partie d’un puits, une (b) if the well approval sought is to complete description détaillée du puits ou de la a well, in addition to the information partie, de l’activité projetée et de son but; required under paragraph (a), information b) s’agissant de la complétion d’un puits, that demonstrates that section 46 will be outre les renseignements mentionnés à complied with; and l’alinéa a), des renseignements (c) if the well approval sought is to suspend a démontrant que les exigences de well or part of it, in addition to the l’article 46 seront respectées; information required under paragraph (a), c) s’agissant de la suspension de an indication of the period within which l’exploitation d’un puits ou d’une partie the suspended well or part of it will be d’un puits, outre les renseignements abandoned or completed. mentionnés à l’alinéa a), la mention du délai dans lequel le puits ou la partie de puits sera abandonné ou complété. 13. The Regulator shall grant the well approval if the 13.
Part document.segment-2
Oil And Gas Operations Regulation 3 — segment 2
- document.segment-2 Verify source ↗
Oil And Gas Operations Regulation 3 — segment 2
AI-assisted research summary: The operator must keep required documents available, follow safety and environmental controls, stop unsafe or polluting work, and meet drilling and well-testing rules.
L’organisme de réglementation accorde operator demonstrates that the work or activity will be l’approbation relative au puits si l’exploitant démontre conducted safely, without waste and without pollution, que les activités seront menées en toute sécurité, sans in compliance with these regulations. gaspillage ni pollution, conformément au présent règlement. Suspension and Revocation of a Well Approval Suspension et annulation de l’approbation relative à un puits 14. (1) The Regulator may suspend the well approval 14. (1) L’organisme de réglementation peut suspendre if l’approbation relative au puits dans les cas suivants : (a) the operator fails to comply with the a) l’exploitant omet de se conformer à toute approval and the work or activity cannot condition de l’approbation et les activités be conducted safely, without waste or ne peuvent plus être menées en toute without pollution; sécurité ou sans gaspillage ou pollution; 13 (b) the safety of the work or activity becomes b) la sécurité des activités ne peut plus être uncertain because assurée pour l’une ou l’autre des raisons (i) the level of performance of the suivantes : installation or service equipment, any (i) le niveau de rendement de ancillary equipment or any support l’installation, de l’équipement de craft is demonstrably less than the service ou auxiliaire ou d’un level of performance indicated in the véhicule de service est nettement application, or inférieur au niveau précisé dans la (ii) the physical environmental demande d’approbation, conditions encountered in the area of (ii) les conditions environnementales the activity for which the well existant dans la zone où se déroule approval was granted are more l’activité pour laquelle l’approbation severe than the equipment’s a été accordée sont plus difficiles que operating limits as specified by the celles prévues par le fabricant de manufacturer; or l’équipement; (c) the operator fails to comply with the c) l’exploitant omet de se conformer à approvals issued under subsection 7(2), l’approbation délivrée par l’organisme de 52(4) or 66(2). réglementation aux termes des paragraphes 7(2), 52(4) ou 66(2). (2) The Regulator may revoke the well approval if (2) L’organisme de réglementation peut annuler the operator fails to remedy the situation causing the l’approbation si l’exploitant omet de corriger la suspension within 120 days after the date of that situation dans les 120 jours suivant la suspension. suspension. Development Plans Plan de mise en valeur 15. For the purpose of subsection 14(1) of the Act, the 15. L’approbation relative au puits qui vise un projet de well approval relating to a production project is a production vaut pour l’application du paragraphe 14(1) prescribed approval. de la Loi. (le paragraphe 14(1) de la Loi) 16. For the purpose of section 10 of the Act, Part 2 of 16. Pour l’application de l’article 10 de la Loi, la the development plan relating to a proposed partie 2 du projet de plan de mise en valeur relatif à des development of a pool or field must contain a resource activités projetées sur un gisement ou un champ doit management plan. contenir un plan de gestion des ressources. PART 3 PARTIE 3 OPERATOR’S DUTIES OBLIGATIONS DE L’EXPLOITANT Availability of Documents Disponibilité des documents 17. (1) The operator shall keep a copy of the 17. (1) L’exploitant conserve à chaque installation une authorization, the well approval and all other approvals copie de l’autorisation, de l’approbation relative au and plans required under these regulations, the Act and puits et de toute autre approbation ainsi que de tout plan the regulations made under the Act at each installation exigés par le présent règlement et par la Loi et ses and shall make them available for examination at the règlements, et les met, sur place, à la disposition de request of any person at each installation. quiconque en fait la demande. (2) The operator shall ensure that a copy of all (2) L’exploitant veille à ce qu’une copie des operating manuals and other procedures and documents manuels d’exploitation et de tout autre procédé ou necessary to execute the work or activity and to operate document nécessaire à la conduite des activités et au the installation safely without pollution are readily fonctionnement sûr et sans pollution de l’installation accessible at each installation. soit facilement accessible à chaque installation. 14 Management System Système de gestion 18. The operator shall ensure compliance with the 18. L’exploitant veille au respect du système de gestion management system referred to in section 5. prévu à l’article 5. Safety and Environmental Protection Sécurité et protection de l’environnement 19. The operator shall take all reasonable precautions 19. L’exploitant prend toutes les mesures voulues pour to ensure safety and environmental protection, assurer la sécurité et la protection de l’environnement, including ensuring that notamment : (a) any operation necessary for the safety of (a) prendre les dispositions nécessaires pour persons at an installation or on a support assurer prioritairement et en tout temps la craft has priority, at all times, over any sécurité des personnes se trouvant dans work or activity at that installation or on une installation ou un véhicule de service; that support craft; b) adopter des méthodes de travail sûres (b) safe work methods are followed during all pendant l’exécution des activités de drilling, well or production operations; forage, des travaux relatifs à un puits et (c) there is a shift handover system to des travaux de production; effectively communicate any conditions, c) mettre en place un système pour assurer, mechanical or procedural deficiencies or à chaque changement d’équipe de travail, other problems that might have an impact la communication efficace de tout on safety or environmental protection; renseignement relatif aux conditions, aux (d) differences in language or other barriers to problèmes mécaniques ou opérationnels effective communication do not ou à d’autres problèmes susceptibles jeopardize safety or environmental d’influer sur la sécurité des personnes ou protection; sur la protection de l’environnement; (e) all persons at an installation, or in transit d) veiller à ce que la sécurité ou la protection to or from an installation, receive de l’environnement ne soit pas instruction in and are familiar with safety compromise du fait d’une mauvaise and evacuation procedures and with their communication due à des obstacles roles and responsibilities in the linguistiques ou à d’autres facteurs; contingency plans, including emergency e) s’assurer que toutes les personnes se response procedures; trouvant dans une installation ou qui y (f) any drilling or well operation is conducted transitent sont informées des consignes de in a manner that maintains full control of sécurité et des procédures d’évacuation, the well at all times; ainsi que des rôles et des responsabilités (g) if there is loss of control of a well at an qui leur incombent aux termes des plans installation, all other wells at that d’urgence, y compris des procédures installation are shut in until the well that is d’intervention d’urgence; out of control is secured; f) faire en sorte que toutes les activités de (h) plans are in place to deal with potential forage ou tous les travaux relatifs à un hazards; puits soient effectués de manière à ce que (i) all equipment required for safety and le puits soit entièrement contrôlé en tout environmental protection is available and temps; in an operable condition; g) s’assurer que, en cas de perte de contrôle (j) the inventory of all equipment identified d’un puits à une installation, les in the safety plan and the environmental obturateurs de tous les autres puits de protection plan is updated after the l’installation sont fermés, jusqu’à ce que completion of any significant le puits ne présente plus de danger; modification or repair to any major h) prévoir des dispositions pour corriger component of the equipment; toute situation comportant des risques (k) the administrative and logistical support potentiels; that is provided for drilling, well or i) vérifier que tout l’équipement nécessaire production operations includes à la sécurité et à la protection de 15 accommodation, transportation, first aid l’environnement est en bon état et and storage, repair facilities and utilisable au besoin; communication systems suitable for the j) s’assurer que la liste de tout l’équipement area of operations; mentionné dans le plan de sécurité et de (l) a sufficient number of trained and protection de l’environnement est mise à competent individuals are available to jour après toute modification ou complete the authorized work or activities réparation majeure à une pièce and to carry out any work or activity d’équipement importante; safely and without pollution; and k) faire en sorte que le soutien administratif (m) any operational procedure that is a hazard et logistique prévu pour les activités de to safety or the environment is corrected forage, les travaux relatifs à un puits et les and all affected persons are informed of travaux de production comprenne la the alteration. fourniture de logement, de services de transport, d’aménagements de premiers soins, d’aménagements d’entreposage, d’ateliers de réparation et de systèmes de communication adaptés à la région; l) veiller à ce que des personnes formées et compétentes soient en nombre suffisant pour mener à terme les activités visées par l’autorisation en toute sécurité et sans causer de pollution; m) corriger toute méthode de travail présentant un risque potentiel pour la sécurité ou l’environnement et en aviser les personnes concernées. 20. (1) No person shall tamper with, activate without 20. (1) Il est interdit d’altérer l’équipement de sécurité cause or misuse any safety or environmental protection ou de protection de l’environnement, de le faire equipment. fonctionner sans motif ni d’en faire un mauvais usage. (2) A passenger on a helicopter, supply vessel or (2) Tout passager d’un hélicoptère, d’un navire de any other support craft engaged in a drilling program or ravitaillement ou de tout autre véhicule de service production project shall comply with all applicable participant à un programme de forage ou à un projet de safety instructions. production respecte les consignes de sécurité applicables. 21. (1) No person shall smoke on an installation 21. (1) Il est interdit de fumer dans une installation, except in those areas set aside by the operator for that sauf aux endroits désignés à cette fin par l’exploitant. use. (2) The operator shall ensure compliance with (2) L’exploitant veille au respect du subsection (1). paragraphe (1). Storing and Handling of Consumables Entreposage et manutention des produits consomptibles 22. The operator shall ensure that fuel, potable water, 22. L’exploitant veille à ce que le carburant, l’eau spill containment products, safety-related chemicals, potable, les produits de confinement des rejets, les drilling fluids, cement and other consumables are substances chimiques liées à la sécurité, les fluides de (a) readily available and stored on an forage, le ciment et les autres produits consomptibles installation in quantities sufficient for any soient : normal and reasonably foreseeable a) facilement accessibles et entreposés à emergency condition; and l’installation en quantité suffisante pour 16 (b) stored and handled in a manner that répondre aux besoins dans des conditions minimizes their deterioration, ensures normales et dans toute autre situation safety and prevents pollution. d’urgence normalement prévisible; b) entreposés et manutentionnés de manière à limiter leur détérioration, à garantir la sécurité et à prévenir toute pollution. Handling of Chemical Substances, Waste Material Manutention des substances chimiques, and Oil des déchets et du pétrole 23. The operator shall ensure that all chemical 23. L’exploitant veille à ce que les substances substances, including process fluids and diesel fuel, chimiques, y compris les fluides de traitement et le waste material, drilling fluid and drill cuttings diesel, les déchets, le fluide et les déblais de forage generated at an installation, are handled in a way that produits à l’installation soient manipulés de manière à does not create a hazard to safety or the environment. ne pas poser de risque pour la sécurité ou l’environnement. Cessation of a Work or Activity Cessation des activités 24. (1) The operator shall ensure that a work or 24. (1) L’exploitant veille à ce que les activités activity ceases without delay if that work or activity cessent sans délai si elles : (a) endangers or is likely to endanger the a) menacent ou sont susceptibles de menacer safety of persons; la sécurité des personnes; (b) endangers or is likely to endanger the b) menacent ou sont susceptibles de menacer safety or integrity of the well or the la sécurité ou l’intégrité du puits ou de installation; or l’installation; (c) causes or is likely to cause pollution. c) causent ou sont susceptibles de causer de la pollution. (2) If the work or activity ceases, the operator (2) En cas d’interruption des activités, l’exploitant shall ensure that it does not resume until it can do so veille à ce qu’elles ne soient reprises que si la situation safely and without pollution. ayant mené à la cessation est rétablie. PART 4 PARTIE 4 EQUIPMENT AND OPERATIONS ÉQUIPEMENT ET ACTIVITÉS Wells, Installations, Equipment, Facilities and Puits, installations, équipement, Support Craft matériel et véhicules de service 25. The operator shall ensure that 25. L’exploitant veille au respect des exigences (a) all wells, installations, equipment and suivantes : facilities are designed, constructed, tested, a) tout puits, toute installation, tout maintained and operated to prevent équipement et tout matériel sont conçus, incidents and waste under the maximum construits, mis à l’essai, entretenus et load conditions that may be reasonably exploités de manière à prévenir les anticipated during an operation; incidents et le gaspillage dans des (b) a comprehensive inspection that includes conditions de charge maximale a non-destructive examination of critical normalement prévisibles pendant les joints and structural members of an activités; installation and any critical drilling or b) une inspection complète, comportant production equipment is made at an notamment des examens non destructifs interval to ensure continued safe operation des raccords critiques et des éléments of the installation or equipment and in any structuraux de toute l’installation et de case, at least once in every five-year tout équipement critique de forage ou de 17 period; and production, est effectuée à un intervalle (c) records of maintenance, tests and permettant de garantir la sécurité de inspections are kept. fonctionnement de l’installation ou de l’équipement, et, dans tous les cas, au moins une fois tous les cinq ans; c) des registres de l’entretien, des essais et des inspections sont conservés. 26. The operator shall ensure that 26. L’exploitant veille au respect des exigences (a) the components of an installation and well suivantes : tubulars, Christmas trees and wellheads a) les éléments de l’installation, le matériel are operated in accordance with good tubulaire des puits, les têtes d’éruption et engineering practices; and têtes de puits sont utilisés conformément (b) any part of an installation that may be aux règles de l’art en matière d’ingénierie; exposed to a sour environment is b) toute partie de l’installation susceptible designed, constructed and maintained to d’être exposée à un environnement acide operate safely in that environment. est conçue, construite et entretenue pour fonctionner en toute sécurité dans un tel environnement. 27. (1) The operator shall ensure that any defect in the 27. (1) L’exploitant veille à ce que toute défaillance installation, equipment, facilities and support craft that de l’installation, de l’équipement, du matériel ou d’un may be a hazard to safety or the environment is véhicule de service pouvant présenter un risque pour la rectified without delay. sécurité ou l’environnement soit corrigée sans délai. (2) If it is not possible to rectify the defect without (2) En cas de retard inévitable, l’exploitant veille delay, the operator shall ensure that it is rectified as à ce que toute défaillance soit corrigée aussitôt que les soon as the circumstances permit and that mitigation circonstances le permettent et que des mesures measures are put in place to minimize the hazards while d’atténuation soient prises entre-temps pour réduire les the defect is being rectified. risques au minimum. Drilling Fluid System Circuit du fluide de forage 28. The operator shall ensure that 28. L’exploitant veille au respect des exigences (a) the drilling fluid system and associated suivantes : monitoring equipment is designed, a) le circuit du fluide de forage et installed, operated and maintained to l’équipement de contrôle connexe sont provide an effective barrier against conçus, installés, exploités et entretenus formation pressure, to allow for proper de manière à constituer une barrière well evaluation, to ensure safe drilling efficace contre la pression de formation, à operations and to prevent pollution; and permettre une évaluation adéquate du (b) the indicators and alarms associated with puits, à assurer le déroulement sûr des the monitoring equipment are strategically activités de forage et à prévenir la located on the drilling rig to alert onsite pollution; personnel. b) les indicateurs et les dispositifs d’alarme liés à l’équipement de contrôle sont installés à des endroits stratégiques sur l’appareil de forage, de manière à alerter le personnel qui s’y trouve. 18 Marine Riser Tube prolongateur 29. (1) The operator shall ensure that every marine 29. (1) L’exploitant veille à ce que le tube riser is capable of prolongateur puisse : (a) providing access to the well; a) fournir un accès au puits; (b) isolating the well-bore from the sea; b) isoler le trou de sonde de la mer; (c) withstanding the differential pressure of c) résister à la différence de pression entre le the drilling fluid relative to the sea; fluide de forage et la mer; (d) withstanding the physical forces d) résister aux forces physiques prévues anticipated in the drilling program; and pendant le programme de forage; (e) permitting the drilling fluid to be returned e) permettre au fluide de forage de retourner to the installation. à l’installation. (2) The operator shall ensure that every marine (2) L’exploitant veille à ce que le tube riser is supported in a manner that effectively prolongateur soit supporté de manière à compenser compensates for the forces caused by the motion of the efficacement les forces résultant du mouvement de installation. l’installation. Drilling Practices Pratiques de forage 30. The operator shall ensure that adequate equipment, 30. L’exploitant veille à ce que du personnel, des procedures and personnel are in place to recognize and procédures et de l’équipement adéquats soient en place control normal and abnormal pressures, to allow for pour constater et contrôler les pressions normales et safe, controlled drilling operations and to prevent anormales, pour assurer le déroulement sûr et contrôlé pollution. des activités de forage et pour prévenir la pollution. Reference for Well Depths Référence pour la profondeur du puits 31. The operator shall ensure that any depth in a well 31. L’exploitant veille à ce que toute mesure de la is measured from a single reference point, which is profondeur d’un puits soit prise à partir d’un point de either the kelly bushing or the rotary table of the référence unique, qui est soit la table de rotation, soit la drilling rig. fourrure d’entraînement de l’appareil de forage. Directional and Deviation Surveys Mesures de déviation et de direction 32. The operator shall ensure that 32. L’exploitant veille au respect des exigences (a) directional and deviation surveys are suivantes : taken at intervals that allow the position of a) les mesures de déviation et de direction the well-bore to be determined accurately; sont effectuées à des intervalles qui and permettent de situer correctement le trou (b) except in the case of a relief well, a well is de sonde; drilled in a manner that does not intersect b) le puits est foré de manière à ne jamais an existing well. couper un puits existant, sauf s’il s’agit d’un puits de secours. Formation Leak-Off Test Test de pression de fracturation 33. The operator shall ensure that 33. L’exploitant veille au respect des exigences (a) a formation leak-off test or a formation suivantes : integrity test is conducted before drilling a) un test de pression de fracturation ou un more than 10 m below the shoe of any essai d’intégrité de la formation est casing other than the conductor casing; effectué avant de forer à une profondeur (b) the formation leak-off test or the de plus de 10 m au-dessous du sabot de formation integrity test is conducted to a tout tubage autre que le tubage initial; 19 pressure that allows for safe drilling to the b) le test ou l’essai est effectué à une next planned casing depth; and pression qui permet d’assurer la sécurité (c) a record is retained of each formation du forage jusqu’à la prochaine profondeur leak-off test and the results included in the de colonne prévue; daily drilling report referred to in c) un registre de chaque test de pression de paragraph 83(a) and in the well history fracturation est conservé et les résultats report referred to in section 88. sont consignés dans le rapport journalier de forage visé à l’alinéa 83a) et dans le rapport final du puits visé à l’article 88. Formation Flow and Well Testing Equipment Équipement pour les essais d’écoulement de formation et les essais d’un puits 34. (1) The operator shall ensure that 34. (1) L’exploitant veille au respect des exigences (a) the equipment used in a formation flow suivantes : test is designed to safely control well a) l’équipement utilisé pour les essais pressure, properly evaluate the formation d’écoulement de formation est conçu de and prevent pollution; façon à contrôler en toute sécurité la (b) the rated working pressure of formation pression du puits, à évaluer correctement flow test equipment upstream of and la formation et à prévenir la pollution; including the well testing manifold b) la pression nominale de marche de tout exceeds the maximum anticipated shut-in équipement utilisé pour les essais pressure; and d’écoulement de formation, au niveau du (c) the equipment downstream of the well collecteur d’essai du puits et en amont de testing manifold is sufficiently protected celui-ci est supérieure à la pression against overpressure. statique maximale prévue; c) l’équipement en aval du collecteur d’essai du puits est suffisamment protégé contre la surpression. (2) The operator of an offshore well or a well in a (2) L’exploitant d’un puits extracôtier ou d’un sour environment shall ensure that the formation flow puits situé dans un environnement acide veille à ce que test equipment includes a down-hole safety valve that l’équipement utilisé pour les essais d’écoulement permits closure of the test string above the packer. comprenne une vanne de sécurité de fond qui permet la fermeture du train de tiges d’essai au-dessus de la garniture d’étanchéité. (3) The operator shall ensure that any formation (3) L’exploitant veille à ce que l’équipement flow test equipment used in testing an offshore well that utilisé pour les essais d’écoulement de formation dans is drilled with a floating drilling unit has a subsea test un puits extracôtier foré à l’aide d’une unité de forage tree that includes flottante comporte une tête de puits d’essai sous-marine (a) a valve that may be operated from the munie : surface and automatically closes when a) d’une soupape qui peut être manœuvrée required to prevent uncontrolled well de la surface et se ferme automatiquement flow; and au besoin pour empêcher un écoulement (b) a release system that permits the test incontrôlé du puits; string to be hydraulically or mechanically b) d’un système de libération qui permet au disconnected within or below the train de tiges d’essai d’être débranché de blow-out preventers. façon mécanique ou hydraulique à l’intérieur ou au-dessous des blocs d’obturation. 20 Well Control Contrôle des puits 35. The operator shall ensure that adequate procedures, 35. L’exploitant veille à ce que des procédures, des materials and equipment are in place and utilized to matériaux et de l’équipement adéquats soient en place minimize the risk of loss of well control in the event of et utilisés pour réduire le risque de perte de contrôle du lost circulation. puits en cas de perte de circulation. 36. (1) The operator shall ensure that, during all well 36. (1) L’exploitant veille à ce que, au cours des operations, reliably operating well control equipment is travaux relatifs à un puits, de l’équipement fiable de installed to control kicks, prevent blow-outs and safely contrôle du puits soit en place pour contrôler les carry out all well activities and operations, including venues, prévenir les éruptions et exécuter en toute drilling, completion and workover operations. sécurité les activités et les travaux relatifs au puits, y compris le forage, la complétion et le reconditionnement. (2) After setting the surface casing, the operator (2) L’exploitant veille à ce que, après l’installation shall ensure that at least two independent and tested du tubage de surface, au moins deux barrières well barriers are in place during all well operations. indépendantes et éprouvées soient en place, et ce, pendant tous les travaux relatifs au puits. (3) If a barrier fails, the operator shall ensure that (3) L’exploitant veille à ce que, en cas de no other activities, other than those intended to restore défaillance d’une barrière, seules les activités destinées or replace the barrier, take place in the well. à sa réparation ou à son remplacement soient menées dans le puits. (4) The operator shall ensure that, during drilling, (4) L’exploitant veille à ce que, durant le forage, except when drilling under-balanced, one of the two l’une des deux barrières soit la colonne de fluide de barriers to be maintained is the drilling fluid column. forage, sauf si le forage est effectué en sous-équilibre. 37. The operator shall ensure that pressure control 37. L’exploitant veille à ce que l’équipement de equipment associated with drilling, coil tubing, slick contrôle de pression utilisé pour les activités de forage line and wire line operations is pressure-tested on et les opérations par tube de production concentrique et installation and as often as necessary to ensure its par câble lisse ou autre soit soumis à une épreuve sous continued safe operation. pression au moment de son installation, et par la suite, aussi souvent que cela est nécessaire pour en garantir la sécurité de fonctionnement. 38. If the well control is lost or if safety, environmental 38. Advenant la perte de contrôle du puits ou si la protection or resource conservation is at risk, the sécurité, la protection de l’environnement ou la operator shall ensure that any action necessary to conservation des ressources est menacée, l’exploitant rectify the situation is taken without delay, despite any veille à ce que les mesures correctives nécessaires condition to the contrary in the well approval. soient prises sans délai, malgré toute disposition contraire prévue par l’approbation relative au puits. Casing and Cementing Tubage et cimentation 39. The operator shall ensure that the well and casing 39. L’exploitant veille à ce que le puits et le tubage are designed so that soient conçus de façon à : (a) the well can be drilled safely, the targeted a) garantir la sécurité des activités de forage, formations evaluated and waste permettre l’évaluation des formations prevented; visées et prévenir le gaspillage; (b) the anticipated conditions, forces and b) pouvoir résister aux conditions, forces et stresses that may be placed on them are contraintes éventuelles; withstood; and c) protéger l’intégrité des couches d’hydrates 21 (c) the integrity of gas hydrate and permafrost de gaz et de pergélisol et, dans le cas d’un zones and, in the case of an onshore well, puits terrestre, des couches d’eau potable. potable water zones, is protected. 40. The operator shall ensure that the well and casing 40. L’exploitant veille à ce que le puits et le tubage se are installed at a depth that provides for adequate kick situent à une profondeur qui assure une résistance tolerances and well control operations that provide for suffisante aux venues et permet de mener les activités safe, constant bottom hole pressure. de contrôle de la pression du fond du puits de manière constante et sûre. 41. The operator shall ensure that cement slurry is 41. L’exploitant veille à ce que le laitier de ciment soit designed and installed so that conçu et installé de façon à : (a) the movement of formation fluids in the a) prévenir le déplacement des fluides de casing annuli is prevented and, if required formation dans le tubage annulaire et, si la for safety, resource evaluation or sécurité, l’évaluation des ressources ou la prevention of waste, the isolation of the prévention du gaspillage l’exigent, oil, gas and water zones is ensured; s’assurer que les couches de pétrole, de (b) support for the casing is provided; gaz et d’eau sont isolées les unes des (c) corrosion of the casing over the cemented autres; interval is retarded; and b) fournir un support au tubage; (d) the integrity of gas hydrate and permafrost c) retarder la corrosion du tubage se trouvant zones and, in the case of an onshore well, au-dessus de l’intervalle cimenté; potable water zones is protected. d) protéger l’intégrité des couches d’hydrates de gaz et de pergélisol et, dans le cas d’un puits terrestre, des couches d’eau potable. Waiting on Cement Time Prise du ciment 42. After the cementing of any casing or casing liner 42. L’exploitant veille à ce que, après la cimentation and before drilling out the casing shoe, the operator d’un tubage — notamment d’un tubage partiel — et shall ensure that the cement has reached the minimum avant le reforage du sabot de tubage, le ciment ait compressive strength sufficient to support the casing atteint une résistance en compression minimale and provide zonal isolation. suffisante pour supporter le tubage et garantir l’isolement des couches. Casing Pressure Testing Épreuve sous pression du tubage 43. After installing and cementing the casing and 43. Après l’installation et la cimentation d’un tubage et before drilling out the casing shoe, the operator shall avant le reforage du sabot de tubage, l’exploitant veille ensure that the casing is pressure-tested to the value à ce que le tubage soit soumis à une épreuve sous required to confirm its integrity for maximum pression à une valeur qui permet de confirmer son anticipated operating pressure. intégrité à la pression d’utilisation maximale prévue. Production Tubing Tube de production 44. The operator shall ensure that the production tubing 44. L’exploitant veille à ce que le tube de production used in a well is designed to withstand the maximum utilisé dans un puits soit conçu de manière à résister conditions, forces and stresses that may be placed on it aux conditions, forces et contraintes maximales qui and to maximize recovery from the pool. pourraient s’y appliquer et à maximiser la récupération du gisement. 22 Monitoring and Control of Process Operations Surveillance et contrôle des opérations de traitement 45. The operator shall ensure that 45. L’exploitant veille au respect des exigences (a) operations such as processing, suivantes : transportation, storage, re-injection and a) les opérations telles que le traitement, le handling of oil and gas on the installation transport, le stockage, la réinjection et la are effectively monitored to prevent manutention du pétrole et du gaz à incidents and waste; l’installation sont surveillés efficacement (b) all alarm, safety, monitoring, warning and de manière à prévenir tout incident et tout control systems associated with those gaspillage; operations are managed to prevent b) tous les systèmes d’alarme, de sécurité, de incidents and waste; and surveillance, d’avertissement et de (c) all appropriate persons are informed of the contrôle liés à ces opérations sont gérés de applicable alarm, safety, monitoring, manière à prévenir tout incident et tout warning or control systems associated gaspillage; with those operations that are taken out of c) les personnes compétentes sont informées service, and when those systems are de la mise hors service ou de la remise en returned to service. service de ces systèmes. Well Completion Complétion d’un puits 46. (1) An operator that completes a well shall ensure 46. (1) L’exploitant qui complète un puits veille en that outre au respect des exigences suivantes : (a) it is completed in a safe manner and a) le puits est complété d’une manière sûre et allows for maximum recovery; qui permet une récupération maximale; (b) except in the case of commingled b) chaque intervalle de complétion est isolé production, each completion interval is de tout autre intervalle perméable ou isolated from any other porous or poreux traversé par le puits, sauf dans le permeable interval penetrated by the well; cas de production mélangée; (c) the testing and production of any c) l’essai et l’exploitation de tout intervalle completion interval are conducted safely de complétion sont effectués en toute and do not cause waste or pollution; sécurité, sans gaspillage ni pollution; (d) if applicable, sand production is d) le cas échéant, la production de sable est controlled and does not create a safety contrôlée, ne pose aucun risque pour la hazard or cause waste; sécurité et ne produit pas de gaspillage; (e) each packer is set as close as practical to e) toute garniture d’étanchéité est installée le the top of the completion interval and that plus près possible du niveau supérieur de the pressure testing of the packer to a l’intervalle de complétion et mis à l’essai differential pressure is greater than the à une pression différentielle supérieure à maximum differential pressure anticipated la pression différentielle maximale under the production or injection prévisible dans des conditions de conditions; production ou d’injection; (f) if practical, any mechanical well condition f) dans la mesure du possible, tout problème that may have an adverse effect on d’ordre mécanique du puits pouvant nuire production of oil and gas from, or the à l’injection de fluides ou à la production injection of fluids into, the well is de pétrole et de gaz est corrigé; corrected; g) le profil d’injection ou de production du (g) the injection or production profile of the puits est amélioré ou l’intervalle de well is improved, or the completion complétion est modifié, si cela est interval of the well is changed, if it is nécessaire pour prévenir le gaspillage; necessary to do so to prevent waste; h) le puits est exploité soit comme un puits à (h) if different pressure and inflow gisement simple soit comme un puits à characteristics of two or more pools might gisements multiples séparés, si la adversely affect the recovery from any of différence entre les caractéristiques de 23 those pools, the well is operated as a pression et d’écoulement de plusieurs single pool well or as a segregated gisements peut nuire à la récupération à multi-pool well; partir d’un des gisements; (i) after initial completion, all barriers are i) après la complétion initiale, toutes les tested to the maximum pressure to which barrières sont soumises à la pression they are likely to be subjected; and maximale à laquelle elles sont (j) following any workover, any affected susceptibles d’être exposées; barriers are pressure-tested. j) après tout reconditionnement, toutes les barrières exposées sont soumises à une épreuve de pression. (2) The operator of a segregated multi-pool well (2) L’exploitant d’un puits à gisements multiples shall ensure that séparés veille au respect des exigences suivantes : (a) after the well is completed, segregation a) à la fin des travaux de complétion, has been established within and outside l’étanchéité à l’intérieur comme à the well casing and is confirmed; and l’extérieur du tubage est confirmée; (b) if there is reason to doubt that segregation b) s’il y a des motifs de douter de is being maintained, a segregation test is l’étanchéité, un essai de séparation est conducted within a reasonable time frame. effectué dans un délai raisonnable. Subsurface Safety Valve Vannes de sécurité de subsurface 47. (1) The operator of an offshore development well 47. (1) L’exploitant d’un puits d’exploitation capable of flow shall ensure that the well is equipped extracôtier qui est éruptif veille à ce que le puits soit with a fail-safe subsurface safety valve that is designed, muni d’une vanne de sécurité de subsurface à sûreté installed, operated and tested to prevent uncontrolled intégrée conçue, installée, mise en service et mise à well flow when it is activated. l’épreuve de manière à empêcher tout écoulement incontrôlé du puits lorsqu’elle est activée. (2) If a development well is located in a zone (2) Si un puits d’exploitation est situé dans une where permafrost is present in unconsolidated zone de pergélisol formé de sédiments non consolidés, sediments, the operator shall ensure that a subsurface l’exploitant veille à ce qu’une vanne de sécurité de safety valve is installed in the tubing below the base of subsurface soit installée dans le tube de production sous the permafrost. la base du pergélisol. Wellhead and Christmas Tree Equipment Têtes de puits et têtes d’éruption 48. The operator shall ensure that the wellhead and 48. L’exploitant veille à ce que la tête de puits et la tête Christmas tree equipment, including valves, are d’éruption, y compris les vannes, soient conçues de designed to operate safely and efficiently under the manière à fonctionner efficacement et en toute sécurité maximum load conditions anticipated during the life of dans des conditions de charge maximale prévisibles the well. pendant la durée de vie du puits. PART 5 PARTIE 5 EVALUATION OF WELLS, POOLS AND FIELDS ÉVALUATION DES PUITS, GISEMENTS ET CHAMPS General Dispositions générales 49. The operator shall ensure that the well data 49. L’exploitant veille à ce que les programmes acquisition program and the field data acquisition d’acquisition des données relatives aux puits et aux program are implemented in accordance with good champs soient appliqués selon les règles de l’art en oilfield practices. matière d’exploitation pétrolière. 24 50. (1) If part of the well or field data acquisition 50. (1) Si un tel programme ne peut être appliqué en program cannot be implemented, the operator shall totalité, l’exploitant veille au respect des exigences ensure that suivantes : (a) a conservation officer is notified as soon a) un agent du contrôle de l’exploitation en as the circumstances permit; and est avisé aussitôt que les circonstances le (b) the procedures to otherwise achieve the permettent; goals of the program are submitted to the b) les mesures prévues pour atteindre Regulator for approval. autrement les objectifs du programme sont soumises à l’approbation de l’organisme de réglementation. (2) If the operator can demonstrate that the (2) L’organisme de réglementation approuve les procedures in paragraph 50(1)(b) can achieve the goals mesures prévues à l’alinéa 50(1)b) si l’exploitant of the well or field data acquisition program or are all démontre qu’elles permettent d’atteindre les objectifs that can be reasonably expected in the circumstances, du programme d’acquisition des données relatives au the Regulator shall approve them. puits ou au champ ou qu’elles sont les seules qui peuvent raisonnablement être prises dans les circonstances. Testing and Sampling of Formations Mise à l’essai et échantillonnage des formations 51. The operator shall ensure that every formation in a 51. S’il y a lieu de croire que des données sur la well is tested and sampled to obtain reservoir pressure pression des réservoirs ou des échantillons de fluide data and fluid samples from the formation, if there is an contribueraient sensiblement à l’évaluation du réservoir indication that the data or samples would contribute et de la géologie des lieux, l’exploitant veille à ce que substantially to the geological and reservoir evaluation. toute formation dans un puits soit mise à l’essai et échantillonnée de manière à obtenir ces données ou échantillons. Formation Flow Testing Essais d’écoulement de formation 52. (1) The operator shall ensure that 52. (1) L’exploitant veille au respect des exigences (a) no development well is put into suivantes : production unless the Regulator has a) aucun puits d’exploitation n’est mis en approved a formation flow test in respect production sans que l’organisme de of the development well; and réglementation n’en n’ait approuvé l’essai (b) if a development well is subjected to a d’écoulement de formation; well operation that might change its b) lorsqu’un puits d’exploitation fait l’objet deliverability, productivity or injectivity, de travaux qui pourraient en modifier la a formation flow test is conducted within capacité de débit, la productivité ou a reasonable time frame after the well l’injectivité, il est soumis, dans un délai operation is ended to determine the effects raisonnable après la fin des travaux, à un of that operation on the well’s essai d’écoulement de formation visant à deliverability, productivity or injectivity. déterminer les effets des travaux sur sa capacité de débit, sa productivité ou son injectivité. (2) The operator may conduct a formation flow (2) L’exploitant peut effectuer un essai test on a well drilled on a geological feature if, before d’écoulement de formation dans un puits foré dans une conducting that test, the operator structure géologique si, au préalable : (a) submits to the Regulator a detailed testing a) il remet à l’organisme de réglementation program; and un programme d’essai détaillé; (b) obtains the Regulator’s approval to b) il obtient l’approbation de l’organisme de conduct the test. réglementation pour effectuer cet essai. 25 (3) The Regulator may require that the operator (3) L’organisme de réglementation peut exiger de conduct a formation flow test on a well drilled on a l’exploitant qu’il effectue un essai d’écoulement de geological feature, other than the first well, if there is formation dans un puits foré dans une structure an indication that the test would contribute substantially géologique, autre que le premier puits, s’il y a lieu de to the geological and reservoir evaluation. croire que cet essai contribuerait sensiblement à l’évaluation du réservoir et de la géologie des lieux. (4) The Regulator shall approve a formation flow (4) L’organisme de réglementation approuve test if the operator demonstrates that the test will be l’essai d’écoulement de formation si l’exploitant conducted safely, without pollution and in accordance démontre que celui-ci sera effectué en toute sécurité, with good oilfield practices and that the test will enable sans causer de pollution et conformément aux règles de the operator to l’art en matière d’exploitation pétrolière et lui permettra (a) obtain data on the deliverability or à la fois : productivity of the well; a) d’obtenir des données sur la capacité de (b) establish the characteristics of the débit ou la productivité du puits; reservoir; and b) d’établir les caractéristiques du réservoir; (c) obtain representative samples of the c) d’obtenir des échantillons représentatifs formation fluids. des liquides de formation. Submission of Samples and Data Expédition des échantillons et des données 53. The operator shall ensure that all cutting samples, 53. L’exploitant veille à ce que les échantillons de fluid samples and cores collected as part of the well and déblais de forage ou de fluides et les carottes recueillis field data acquisition programs are dans le cadre des programmes d’acquisition des (a) transported and stored in a manner that données relatives aux puits et aux champs soient : prevents any loss or deterioration; a) transportés et entreposés de manière à (b) delivered to the Regulator within 60 days prévenir les pertes ou détériorations; after the rig release date unless analyses b) expédiés à l’organisme de réglementation are ongoing, in which case those samples dans les 60 jours suivant la date de and cores, or the remaining parts, are to be libération de l’appareil de forage, sauf delivered on completion of the analyses; s’ils sont en cours d’analyse, auquel cas and ils sont expédiés, ou ce qu’il en reste est (c) stored in durable containers properly expédié, après l’analyse; labelled for identification. c) emballés dans des contenants durables et correctement étiquetés. 54. The operator shall ensure that after any samples 54. Lorsque les échantillons nécessaires à des analyses, necessary for analysis or for research or academic à des recherches ou à des études universitaires ont été studies have been removed from a conventional core, prélevés d’une carotte classique, l’exploitant veille à ce the remaining core, or a longitudinal slab that is not less que le reste de la carotte ou une tranche prise dans le than one half of the cross-sectional area of that core, is sens longitudinal et correspondant à au moins la moitié submitted to the Regulator. de la section transversale de la carotte soit remis à l’organisme de réglementation. 55. Before disposing of cutting samples, fluid samples, 55. L’exploitant veille à ce que, avant l’élimination de cores or evaluation data under these regulations, the tout échantillon de déblais de forage ou de fluides, de operator shall ensure that the Regulator is notified in carottes ou de données d’évaluation aux termes du writing and is given an opportunity to request delivery présent règlement, l’organisme de réglementation en of the samples, cores or data. soit avisé par écrit et à ce qu’on lui offre la possibilité d’en demander livraison. 26 PART 6 PARTIE 6 WELL TERMINATION CESSATION DE L’EXPLOITATION D’UN PUITS Suspension or Abandonment Suspension et abandon 56. The operator shall ensure that every well that is 56. L’exploitant veille à ce que tout puits abandonné ou suspended or abandoned can be readily located and is dont l’exploitation est suspendue soit facilement left in a condition that localisable et laissé dans un état tel : (a) provides for isolation of all oil or gas a) qu’il assure l’isolement de toute couche bearing zones and discrete pressure zones renfermant du pétrole ou du gaz, toute and, in the case of an onshore well, couche de pression distincte et, dans le cas potable water zones; and d’un puits terrestre, de toute couche d’eau (b) prevents any formation fluid from flowing potable; through or escaping from the well-bore. b) qu’il empêche l’écoulement ou le rejet de fluides de formation du trou de sonde. 57. The operator of a suspended well shall ensure that 57. L’exploitant d’un puits dont l’exploitation est the well is monitored and inspected to maintain its suspendue veille à ce que le puits soit surveillé et continued integrity and to prevent pollution. inspecté pour en préserver l’intégrité et prévenir la pollution. 58. The operator shall ensure that, on the abandonment 58.
Part document.segment-3
Oil And Gas Operations Regulation 3 — segment 3
- document.segment-3 Verify source ↗
Oil And Gas Operations Regulation 3 — segment 3
AI-assisted research summary: This part requires operators to control offshore well, production, safety, training, and reporting activities, and it restricts certain actions like removing drilling installations, commingled production, flaring, venting, and burning oil unless stated conditions are met.
Lorsqu’un puits extracôtier est abandonné, of an offshore well, the seafloor is cleared of any l’exploitant veille à ce que le fond marin soit débarrassé material or equipment that might interfere with other de tout matériel ou équipement qui pourrait nuire aux commercial uses of the sea. autres utilisations commerciales de la mer. Installation Removal Déplacement d’une installation 59. No operator shall remove or cause to have removed 59. Il est interdit à l’exploitant de retirer ou de faire a drilling installation from a well drilled under these retirer une installation de forage d’un puits, en vertu du regulations unless the well has been terminated in présent règlement, à moins que l’exploitation du puits accordance with these regulations. n’ait cessé conformément au présent règlement. PART 7 PARTIE 7 MEASUREMENTS MESURAGE Flow and Volume Débit et volume 60. (1) Unless otherwise included in the approval 60. (1) Sauf disposition contraire précisée dans issued under subsection 7(2), the operator shall ensure l’approbation délivrée aux termes du paragraphe 7(2), that the rate of flow and the volume of the following are l’exploitant veille à ce que soient mesurés et enregistrés measured and recorded: le débit et le volume des fluides et matériaux suivants : (a) the fluid that is produced from each well; a) le fluide produit par chaque puits; (b) the fluid that is injected into each well; b) le fluide injecté dans chaque puits; (c) any produced fluid that enters, leaves, is c) le fluide produit qui entre dans une used or is flared, vented, burned or installation, y compris dans une salle des otherwise disposed of on an installation, accumulateurs, une installation de including any battery room, treatment traitement ou une usine de transformation, facility or processing plant; ou qui en sort, y est utilisé ou est brûlé à (d) any air or materials injected for the la torche, est rejeté, est brûlé ou autrement purposes of disposal, storage or cycling, éliminé; including drill cuttings and other useless d) l’air ou les matériaux injectés à des fins material that is generated during drilling, d’élimination, de stockage ou de well or production operations. recyclage, y compris les déblais de forage 27 et autres matériaux inutilisables produits au cours des activités de forage, des travaux relatifs à un puits ou à des travaux de production. (2) The operator shall ensure that any (2) L’exploitant veille à ce que le mesurage soit measurements are conducted in accordance with the effectué conformément au système d’écoulement et aux flow system, flow calculation procedure and flow méthodes de calcul et de répartition du débit approuvés allocation procedure approved under subsection 7(2). au titre du paragraphe 7(2). 61. (1) The operator shall ensure that group 61. (1) L’exploitant veille à ce que soient réparties au production of oil and gas from wells and injection of a prorata la production regroupée de pétrole et de gaz des fluid into wells is allocated on a pro rata basis, in puits et l’injection de fluides dans les puits, accordance with the flow system, flow calculation conformément au système d’écoulement et aux procedure and flow allocation procedure approved méthodes de calcul et de répartition du débit approuvés under subsection 7(2). au titre du paragraphe 7(2). (2) If a well is completed over multiple pools or (2) Dans le cas d’un puits dont la complétion est zones, the operator shall ensure that production or réalisée sur plusieurs gisements ou couches, l’exploitant injection volumes for the well are allocated on a pro veille à ce que la production ou l’injection pour chaque rata basis to the pools or zones in accordance with the gisement ou couche soit répartie au prorata selon la flow allocation procedure approved under méthode de répartition du débit approuvée au titre du subsection 7(2). paragraphe 7(2). Testing, Maintenance and Notification Essais, entretien et notification 62. The operator shall ensure that 62. L’exploitant veille au respect des exigences (a) meters and associated equipment are suivantes : calibrated and maintained to ensure their a) les compteurs et le matériel connexe sont continued accuracy; entretenus et étalonnés de manière à (b) equipment used to calibrate the flow assurer la précision des mesures; system is calibrated in accordance with b) l’équipement utilisé pour étalonner le good measurement practices; système d’écoulement est étalonné (c) any component of the flow system that conformément aux règles de l’art en may have an impact on the accuracy or matière de mesurage; integrity of the flow system and that is not c) tout composant du système d’écoulement functioning in accordance with the pouvant avoir des effets sur la précision manufacturer’s specifications is repaired ou sur l’intégrité du système d’écoulement or replaced without delay, or, if it is not et dont le fonctionnement n’est pas possible to do so without delay, corrective conforme aux spécifications du fabricant measures are taken to minimize the est réparé ou remplacé sans délai; en cas impact on the accuracy and integrity of de retard inévitable, des mesures the flow system while the repair or correctives sont prises entre-temps pour replacement is proceeding; and réduire au minimum ces effets; (d) a conservation officer is notified, as soon d) un agent du contrôle de l’exploitation est as the circumstances permit, of any avisé, aussitôt que les circonstances le malfunction or failure of any flow system permettent, de toute défectuosité ou component that may have an impact on défaillance d’un composant du système the accuracy of the flow system and of the d’écoulement qui pourrait avoir des effets corrective measures taken. sur l’exactitude du système d’écoulement et des mesures correctives prises. 28 Transfer Meters Compteurs de transfert 63. The operator shall ensure that 63. L’exploitant veille au respect des exigences (a) a conservation officer is notified at least suivantes : 14 days before the day on which any a) un agent du contrôle de l’exploitation est transfer meter prover or master meter used avisé au moins 14 jours avant l’étalonnage in conjunction with a transfer meter is d’un compteur étalon de transfert ou d’un calibrated; and compteur général lié à celui-ci; (b) a copy of the calibration certificate is b) une copie du certificat d’étalonnage est submitted to the Chief Conservation remise au délégué à l’exploitation aussitôt Officer as soon as the circumstances que les circonstances le permettent après permit, following completion of the l’étalonnage. calibration. Proration Testing Frequency Fréquence d’essais au prorata 64. The operator of a development well that is 64. L’exploitant d’un puits d’exploitation produisant du producing oil or gas shall ensure that sufficient pétrole ou du gaz veille à ce que le puits soit soumis à proration tests are performed to permit reasonably un nombre suffisant d’essais au prorata pour permettre accurate determination of the allocation of oil, gas and de déterminer avec une précision suffisante la water production on a pool and zone basis. répartition de la production de pétrole, de gaz et d’eau par gisement et par couche. PART 8 PARTIE 8 PRODUCTION CONSERVATION RATIONALISATION DE LA PRODUCTION Resource Management Gestion des ressources 65. The operator shall ensure that 65. L’exploitant veille au respect des exigences (a) maximum recovery from a pool or zone is suivantes : achieved in accordance with good oilfield a) la récupération maximale d’un gisement ou practices; d’une couche est réalisée selon les règles de (b) wells are located and operated to provide l’art en matière d’exploitation pétrolière; for maximum recovery from a pool; and b) les puits sont disposés et exploités de (c) if there is reason to believe that infill manière à permettre la récupération drilling or implementation of an enhanced maximale d’un gisement; recovery scheme might result in increased c) s’il y a lieu de croire que le forage recovery from a pool or field, studies on intercalaire ou la mise en oeuvre d’un plan these methods are carried out and de récupération assistée permettrait submitted to the Regulator. d’accroître la récupération d’un gisement ou d’un champ, ces méthodes font l’objet d’une étude qui est remise à l’organisme de réglementation. Commingled Production Production mélangée 66. (1) No operator shall engage in commingled 66. (1) Il est interdit à l’exploitant de se livrer à une production except in accordance with the approval production mélangée, sauf en conformité avec granted under subsection (2). l’approbation accordée au paragraphe (2). (2) The Regulator shall approve the commingled (2) L’organisme de réglementation approuve la production if the operator demonstrates that it would production mélangée si l’exploitant démontre que not reduce the recovery from the pools or zones. celle-ci ne réduirait pas la récupération des gisements ou des couches. 29 (3) An operator engaging in commingled (3) L’exploitant qui se livre à une production production shall ensure that the total volume and the mélangée veille à ce que le volume total et le taux de rate of production of each fluid produced is measured production de chaque fluide produit soient mesurés et and the volume from each pool or zone is allocated in que le volume pour chaque gisement ou chaque couche accordance with the requirements of Part 7. soit réparti conformément aux exigences de la partie 7. Gas Flaring and Venting Brûlage de gaz à la torche et rejet de gaz dans l’atmosphère 67. No operator shall flare or vent gas unless 67. Il est interdit à l’exploitant de brûler du gaz à la (a) it is otherwise permitted in the approval torche ou de rejeter du gaz dans l’atmosphère, sauf dans issued under subsection 52(4) or in the les cas suivants : authorization; or a) le brûlage ou le rejet est par ailleurs permis (b) it is necessary to do so because of an aux termes de l’approbation accordée au emergency situation and the Regulator is titre du paragraphe 52(4) ou dans notified in the daily drilling report, daily l’autorisation; production report or in any other written b) le brûlage ou le rejet est nécessaire pour or electronic form, as soon as the remédier à une situation d’urgence, auquel circumstances permit, of the flaring or cas l’organisme de réglementation en est venting and of the amount flared or avisé, aussitôt que les circonstances le vented. permettent, dans le rapport journalier de forage ou le registre quotidien relatif à la production ou encore sous toute autre forme écrite ou électronique, avec indication des quantités brûlées ou rejetées. Oil Burning Brûlage de pétrole 68. No operator shall burn oil unless 68. Il est interdit à l’exploitant de brûler du pétrole, (a) it is otherwise permitted in the approval sauf dans les cas suivants : issued under subsection 52(4) or in the a) le brûlage est par ailleurs permis aux authorization; or termes de l’approbation accordée au titre (b) it is necessary to do so because of an du paragraphe 52(4) ou dans emergency situation and the Regulator is l’autorisation; notified in the daily drilling report, daily b) il est nécessaire pour remédier à une production report or in any other written situation d’urgence, auquel cas or electronic form, as soon as the l’organisme de réglementation en est circumstances permit, of the burning and avisé, aussitôt que les circonstances le the amount burned. permettent, dans le rapport journalier de forage ou le registre quotidien relatif à la production ou encore sous toute autre forme écrite ou électronique, avec indication des quantités brûlées. PART 9 PARTIE 9 SUPPORT OPERATIONS OPÉRATIONS DE SOUTIEN Support Craft Véhicules de service 69. The operator shall ensure that all support craft are 69. L’exploitant veille à ce que tout véhicule de service designed, constructed and maintained to supply the soit conçu, construit et entretenu de manière à pouvoir necessary support functions and operate safely in the remplir son rôle de soutien et fonctionner en toute foreseeable physical environmental conditions sécurité dans les conditions environnementales qui prevailing in the area in which they operate. règnent normalement dans la région desservie. 30 70. (1) The operator of a manned installation shall 70. (1) L’exploitant d’une installation habitée veille à ensure that at least one support craft is ce qu’au moins un véhicule de service soit : (a) available at a distance that is not greater a) disponible à une distance permettant une than that required for a return time of intervention d’au plus 20 minutes 20 minutes; and aller-retour; (b) suitably equipped to supply the necessary b) équipé de manière à pouvoir fournir les emergency services including rescue and services d’urgence nécessaires, y compris first aid treatment for all personnel on the le secours et les premiers soins pour tout installation in the event of an emergency. le personnel à l’installation au besoin. (2) If the support craft exceeds the distance (2) Le cas échéant, si le véhicule de service se referred to in paragraph (1)(a), both the installation trouve à une distance plus grande que celle prévue à manager and the person in charge of the support craft l’alinéa (1)a), le chargé de projet et la personne shall log this fact and the reason why the distance or responsable du véhicule de service consignent ce fait et time was exceeded. indiquent la raison pour laquelle la distance ou le délai n’a pas été respecté. (3) Under the direction of the installation manager, (3) Sous la direction du chargé de projet, le the support craft crew shall keep the craft in close personnel attaché au véhicule de service doit tenir le proximity to the installation, maintain open véhicule à proximité de l’installation, maintenir communication channels with the installation and be ouvertes les voies de communication avec celle-ci et prepared to conduct rescue operations during any être prêt à mener des opérations de sauvetage durant activity or condition that presents an increased level of toute activité ou dans toute situation qui présente un risk to the safety of personnel or the installation. risque accru pour la sécurité du personnel ou de l’installation. Safety Zone Zone de sécurité 71. (1) For the purposes of this section, the safety 71. (1) Pour l’application du présent article, la zone de zone around an offshore installation consists of the area sécurité autour d’une installation extracôtière est within a line enclosing and drawn at a distance of formée de la superficie se trouvant dans les 500 m à 500 m from the outer edge of the installation. l’extérieur du périmètre de l’installation. (2) A support craft shall not enter the safety zone (2) Un véhicule de service ne peut entrer dans la without the consent of the installation manager. zone de sécurité sans le consentement du chargé de projet. (3) The operator shall take all reasonable measures (3) L’exploitant prend toutes les mesures voulues to warn persons who are in charge of vessels and pour aviser les responsables de navires ou d’aéronefs aircraft of the safety zone boundaries, of the facilities des limites de la zone de sécurité, du matériel qui s’y within the safety zone and of any related potential trouve et des risques éventuels y afférents. hazards. PART 10 PARTIE 10 TRAINING AND COMPETENCY FORMATION ET COMPÉTENCE 72. The operator shall ensure that 72. L’exploitant veille au respect des exigences (a) all personnel have, before assuming their suivantes : duties, the necessary experience, training a) avant d’assumer ses fonctions, tout le and qualifications and are able to conduct personnel doit avoir l’expérience, la their duties safely, competently and in formation et les qualifications voulues compliance with these regulations; and ainsi que la capacité d’exécuter ses (b) records of the experience, training and fonctions en toute sécurité et de façon qualifications of all personnel are kept and compétente, et ce, conformément au 31 made available to the Regulator upon présent règlement; request. b) les dossiers relatifs à l’expérience, la formation et les qualifications du personnel sont conservés et, sur demande, ils sont mis à la disposition de l’organisme de réglementation. PART 11 PARTIE 11 SUBMISSIONS, NOTIFICATIONS, RECORDS PRÉSENTATIONS, AVIS, REGISTRES ET AND REPORTS RAPPORTS Reference to Names and Designations Mention des noms et désignations 73. When submitting any information for the purposes 73. Au moment de la présentation de renseignements of these regulations, the operator shall refer to each en application du présent règlement, l’exploitant y well, pool and field by the name given to it under indique chaque puits, gisement ou champ par le nom sections 3 and 4, or if a zone, by its designation by the qui lui est attribué en vertu des articles 3 et 4 ou, Regulator under section 4. s’agissant d’une couche, par la désignation de l’organisme de réglementation en vertu de l’article 4. Surveys Arpentage 74. (1) The operator shall ensure that a survey is used 74. (1) L’exploitant veille à ce qu’un arpentage soit to confirm effectué pour confirmer : (a) for an onshore well, the surface location; a) dans le cas d’un puits terrestre, and l’emplacement en surface; (b) for an offshore well, the location on the b) dans le cas d’un puits extracôtier, seafloor. l’emplacement sur le fond marin. (2) The survey shall be certified by a person (2) L’arpentage est certifié par une personne licensed under the Canada Lands Surveyors Act. titulaire d’un permis en vertu de la Loi sur les arpenteurs des terres du Canada. (3) The operator shall ensure that a copy of the (3) L’exploitant veille à ce qu’une copie du plan survey plan filed with the Canada Lands Surveys d’arpentage déposé aux Archives d’arpentage des terres Records is submitted to the Regulator. du Canada soit remise à l’organisme de réglementation. Incidents and Near-misses Incidents et quasi-incidents 75. (1) The operator shall ensure that 75. (1) L’exploitant veille au respect des exigences (a) the Regulator is notified of any incident or suivantes : near-miss as soon as the circumstances a) l’organisme de réglementation est avisé, permit; and aussitôt que les circonstances le permettent, (b) the Regulator is notified at least 24 hours de tout incident ou quasi-incident; in advance of any press release or press b) l’organisme de réglementation est avisé, au conference held by the operator moins 24 heures avant la diffusion de tout concerning any incident or near-miss communiqué ou la tenue de toute during any activity to which these conférence de presse par l’exploitant, de regulations apply, except in an emergency tout incident ou quasi-incident survenu lors situation, in which case it shall be notified d’une activité visée par le présent without delay before the press release or règlement, sauf en situation d’urgence, press conference. auquel cas avis lui est donné sans délai avant le communiqué ou la conférence de presse. 32 (2) The operator shall ensure that (2) L’exploitant veille au respect des exigences (a) any incident or near-miss is investigated, suivantes : its root cause and causal factors identified a) une enquête est menée à l’égard de chaque and corrective action taken; and incident ou quasi-incident, sa cause (b) for any of the following incidents or première et les facteurs contributifs sont near-misses, a copy of an investigation précisés et des mesures correctives sont report identifying the root cause, causal prises; factors and corrective action taken is b) un rapport d’enquête précisant la cause submitted to the Regulator no later than première de l’incident ou quasi-incident, 21 days after the day on which the les facteurs contributifs et les mesures incident or near-miss occurred: correctives est remis à l’organisme de (i) a lost or restricted workday injury, réglementation au plus tard 21 jours après (ii) death, l’incident ou quasi-incident, s’il s’agit : (iii) fire or explosion, (i) d’une blessure entraînant une perte (iv) a loss of containment of any fluid de temps de travail, from a well, (ii) d’une perte de vie, (v) an imminent threat to the safety of a (iii) d’un incendie ou d’une explosion, person, installation or support craft, (iv) d’une défaillance du confinement (vi) a significant pollution event. d’un fluide provenant d’un puits, (v) d’une menace imminente à la sécurité d’une personne, d’une installation ou d’un véhicule de service, (vi) d’un événement de pollution important. Submission of Data and Analysis Présentation de données et analyses 76. (1) The operator shall ensure that a final copy of 76. (1) L’exploitant veille à ce que soient remis à the results, data, analyses and schematics obtained from l’organisme de réglementation les résultats, données, the following sources is submitted to the Regulator: analyses et schémas définitifs fondés sur : (a) testing, sampling and pressure surveys a) la mise à l’essai, l’échantillonnage et les carried out as part of the well and field relevés de pression effectués dans le cadre data acquisition programs referred to in des programmes d’acquisition des section 49 and testing and sampling of données relatives aux puits et aux champs formations referred to in section 51; visés à l’article 49, et la mise à l’essai et (b) any segregation test or well operation. l’échantillonnage prévus à l’article 51; b) les essais de séparation ou les travaux relatifs à un puits. (2) Unless otherwise indicated in these (2) Sauf disposition contraire du présent regulations, the operator shall ensure that the results, règlement, l’exploitant veille à ce que les résultats, data, analyses and schematics are submitted within données, analyses et schémas soient présentés dans les 60 days after the day on which an activity referred to in 60 jours suivant la fin d’une activité mentionnée aux paragraphs (1)(a) and (b) is completed. alinéas (1)a) et b). Records Registres 77. The operator shall ensure that records are kept of 77. L’exploitant veille à ce que soient tenus des (a) all persons arriving, leaving or present on registres concernant : the installation; a) les personnes qui arrivent à l’installation, (b) the location and movement of support qui s’y trouvent ou qui la quittent; craft, the emergency drills and exercises, b) l’emplacement et les déplacements des incidents, near-misses, the quantities of véhicules de service, les exercices 33 consumable substances that are required d’urgence, les incidents, les to ensure the safety of operations and quasi-incidents, les quantités de other observations and information critical substances consomptibles nécessaires à la to the safety of persons on the installation sécurité des opérations et tout autre or the protection of the environment; observation ou renseignement essentiel (c) daily maintenance and operating pour la sécurité des personnes se trouvant activities, including any activity that may à l’installation ou la protection de be critical to the safety of persons on the l’environnement; installation, the protection of the c) les activités quotidiennes d’entretien et environment or the prevention of waste; d’exploitation, y compris toute activité (d) in the case of a production installation, essentielle pour la sécurité des personnes (i) the inspection of the installation and se trouvant à l’installation, la protection related equipment for corrosion and de l’environnement ou la prévention du erosion and any resulting gaspillage; maintenance carried out, d) dans le cas d’une installation de (ii) the pressure, temperature and flow production : rate data for compressors and (i) les inspections de l’installation et du treating and processing facilities, matériel connexe en vue de vérifier (iii) the calibration of meters and la présence de corrosion et d’érosion instruments, et les travaux d’entretien effectués (iv) the testing of surface and subsurface par suite de ces inspections, safety valves, (ii) les données relatives à la pression, à (v) the status of each well and the status la température et au débit des of well operations, and compresseurs, du matériel de (vi) the status of the equipment and traitement et de transformation, systems critical to safety and (iii) l’étalonnage des compteurs et autres protection of the environment instruments, including any unsuccessful test result (iv) les essais des vannes de sécurité de or equipment failure leading to an surface et de subsurface, impairment of the systems; and (v) l’état de chacun des puits et l’état (e) in the case of a floating installation, all d’avancement des travaux relatifs installation movements, data, aux puits, observations, measurements and (vi) l’état de l’équipement et des calculations related to the stability and systèmes essentiels à la sécurité et à station-keeping capability of the la protection de l’environnement, y installation. compris tout résultat négatif des essais et toute défaillance de l’équipement qui ont mené à un affaiblissement des systèmes; e) dans le cas d’une installation flottante, les mouvements de l’installation et les données, observations, mesures et calculs relatifs à la stabilité de l’installation et à sa capacité de conserver sa position. Meteorological Observations Observations météorologiques 78. The operator of an offshore installation shall ensure 78. L’exploitant d’une installation extracôtière veille au that respect des exigences suivantes : (a) the installation is equipped with facilities a) l’installation est dotée des moyens et de and equipment for observing, measuring l’équipement nécessaires pour observer, and recording physical environmental mesurer et consigner les conditions conditions and that a comprehensive environnementales et un rapport détaillé record of observations of physical des observations de ces conditions est 34 environmental conditions is maintained conservé à bord de l’installation; onboard the installation; and b) les prévisions des conditions (b) forecasts of meteorological conditions, sea météorologiques, de l’état de la mer et du states and ice movements are obtained and mouvement des glaces sont obtenues et recorded each day and each time during consignées chaque jour, ainsi qu’à chaque the day that they change substantially fois qu’il y a des variations sensibles de from those forecasted. ceux-ci. Daily Production Record Registres quotidiens relatifs à la production 79. The operator shall ensure that a daily production 79. L’exploitant veille à ce qu’un registre quotidien record, which includes the metering records and other relatif à la production, contenant les dossiers relatifs information relating to the production of oil and gas and aux compteurs et tout autre renseignement concernant other fluids in respect of a pool or well, is retained and la production de pétrole et de gaz et d’autres fluides readily accessible to the Regulator until the field or well dans un gisement ou un puits, soit conservé et soit in which the pool is located is abandoned and at that facilement accessible à l’organisme de réglementation time the operator shall offer the record to the Regulator jusqu’à l’abandon du champ ou du puits dans lequel le before destroying it. gisement est situé, et il l’offre à l’organisme de réglementation avant de le détruire. Management of Records Gestion des registres 80. The operator shall ensure that 80. L’exploitant veille au respect des exigences (a) all processes are in place and suivantes : implemented to identify, generate, control a) les processus sont en place et mis en and retain records necessary to support oeuvre pour identifier, produire, contrôler operational and regulatory requirements; et conserver les registres requis pour and répondre aux exigences opérationnelles et (b) the records are readily accessible for réglementaires; inspection by the Regulator. b) les registres sont facilement accessibles à l’organisme de réglementation pour examen. Formation Flow Test Reports Rapports relatifs aux essais d’écoulement de formation 81. The operator shall ensure that 81. L’exploitant veille au respect des exigences (a) in respect of exploration and delineation suivantes : wells, a daily record of formation flow a) pour les puits d’exploitation et de test results is submitted to the Regulator; délimitation, un registre quotidien des and résultats des essais d’écoulement de (b) in respect of all wells, a formation flow formation est remis à l’organisme de test report is submitted to the Regulator as réglementation; soon as the circumstances permit, b) pour tous les puits, un rapport des essais following completion of the test. d’écoulement de formation est remis à l’organisme de réglementation aussitôt que les circonstances le permettent après l’essai. 35 Pilot Scheme Projet pilote 82. (1) For the purposes of this section, "pilot scheme" 82. (1) Pour l’application du présent article, «projet means a scheme that applies existing or experimental pilote» s’entend de tout projet pour lequel on utilise une technology over a limited portion of a pool to obtain technique conventionnelle ou expérimentale dans une information on reservoir or production performance for section limitée d’un gisement afin d’obtenir des the purpose of optimizing field development or renseignements sur le rendement du réservoir ou sur la improving reservoir or production performance. production à des fins d’optimisation de la mise en valeur du champ ou d’amélioration du rendement du réservoir ou de la production. (2) The operator shall ensure that interim (2) L’exploitant veille à ce que des évaluations evaluations of any pilot scheme respecting a pool, field provisoires de tout projet pilote relatif à un gisement, un or zone are submitted to the Regulator. champ ou une couche soient remises à l’organisme de réglementation. (3) When the operator completes a pilot scheme, (3) Au terme d’un projet pilote, l’exploitant veille the operator shall ensure that a report is submitted to à ce que soit remis à l’organisme de réglementation un the Regulator that sets out rapport faisant état : (a) the results of the scheme and supporting a) des résultats du projet, avec les données et data and analyses; and analyses à l’appui; (b) the operator’s conclusions as to the b) des conclusions de l’exploitant quant à la potential of the scheme for application to possibilité de passer à la mise en full-scale production. production à plein rendement. Daily Reports Rapports quotidiens 83. The operator shall ensure that a copy of each of the 83. L’exploitant veille à ce que soit remis à following is submitted to the Regulator daily: l’organisme de réglementation quotidiennement : (a) the daily drilling report; a) le rapport journalier de forage; (b) the daily geological report, including any b) le rapport géologique quotidien, y compris formation evaluation logs and data; les diagraphies et les données relatives à (c) in the case of a production installation, a l’évaluation de la formation; summary, in the form of a daily c) dans le cas d’une installation de production report, of the records referred production, un résumé des registres visés to in paragraph 77(d) and the daily à l’alinéa 77d) et du registre quotidien production record. relatif à la production, sous forme d’un rapport de la production quotidienne. Monthly Production Report Rapport mensuel concernant la production 84. (1) The operator shall ensure that a report 84. (1) L’exploitant veille à ce que soit présenté à summarizing the production data collected during the l’organisme de réglementation, au plus tard le 15e jour preceding month is submitted to the Regulator not later du mois, un rapport résumant les données de production than the 15th day of each month. du mois précédent. (2) The report shall use established production (2) Le rapport de la production mensuelle est accounting procedures. établi selon des méthodes reconnues de comptabilité de la production. 36 Annual Production Report Rapport annuel de production 85. The operator shall ensure that, not later than 85. L’exploitant veille à ce que soit présenté à March 31 of each year, an annual production report l’organisme de réglementation, au plus tard le 31 mars relating to the preceding year for a pool, field or zone de chaque année, un rapport annuel de la production de is submitted to the Regulator including details on the l’année précédente ayant trait à un gisement, un champ performance, production forecast, reserve revision, ou une couche et comprenant notamment des données reasons for significant deviations in well performance sur le rendement, des prévisions concernant la from predictions in previous annual production reports, production, une révision des réserves, une explication gas conservation resources, efforts to maximize de tout écart marqué entre le rendement d’un puits et recovery and reduce costs, and any other information les prévisions contenues dans les rapports annuels de required to demonstrate how the operator manages and production antérieurs, les ressources affectées à la intends to manage the resource without causing waste. conservation du gaz, les efforts faits pour optimiser la récupération et réduire les coûts, et toute autre information qui démontre de quelle manière l’exploitant gère les ressources et entend les gérer à l’avenir sans gaspillage. Environmental Reports Rapport sur les conditions environnementales 86. (1) For each production project, the operator shall 86. (1) Pour chaque projet de production, l’exploitant ensure that, not later than March 31 of each year, an veille à ce que soit présenté à l’organisme de annual environmental report relating to the preceding réglementation, au plus tard le 31 mars de chaque year is submitted to the Regulator and includes année, un rapport annuel sur les conditions (a) for an offshore installation, a summary of environnementales pour l’année précédente et the general environmental conditions contenant : during the year and a description of ice a) dans le cas d’une installation extracôtière, management activities; and un résumé des conditions (b) a summary of environmental protection environnementales générales de l’année matters during the year, including a ainsi qu’une description des activités de summary of any incidents that may have gestion des glaces; an environmental impact, discharges that b) un résumé des situations afférentes à la occurred and waste material that was protection de l’environnement survenues produced, a discussion of efforts au cours de l’année, y compris des undertaken to reduce pollution and waste données sommaires sur les incidents material and a description of pouvant avoir des effets environmental contingency plan exercises. environnementaux, les rejets survenus et les déchets produits, un exposé des efforts accomplis pour réduire la pollution et les déchets et une description des exercices de simulation du plan d’urgence environnementale. (2) For each drilling installation for an exploration (2) Pour chaque installation de forage d’un puits or delineation well, the operator shall ensure that an d’exploration ou de délimitation, l’exploitant veille à ce environmental report relating to each well is submitted que soit présenté à l’organisme de réglementation pour to the Regulator within 90 days after the rig release date chaque puits, dans les 90 jours suivant la date de and includes libération de l’appareil de forage, un rapport sur les (a) a description of the general environmental conditions environnementales qui contient ce qui suit : conditions during the drilling program and a) une description des conditions a description of ice management activities environnementales générales dans and downtime caused by weather or ice; lesquelles le programme de forage a été and exécuté, ainsi qu’une description des (b) a summary of environmental protection activités de gestion des glaces et un relevé 37 matters during the drilling program, des périodes d’arrêt imputables aux including a summary of spills, discharges conditions atmosphériques ou aux glaces; occurred and waste material produced, a b) un résumé des situations afférentes à la discussion of efforts undertaken to reduce protection de l’environnement survenues them, and a description of environmental durant l’exécution du programme de contingency plan exercises. forage, y compris des données sommaires sur les déversements et les rejets survenus et sur les déchets produits, un exposé des efforts accomplis pour réduire ceux-ci, et une description des exercices de simulation du plan d’urgence environnementale. Annual Safety Report Rapport annuel sur la sécurité 87. The operator shall ensure that, not later than 87. L’exploitant veille à ce que soit présenté à March 31 of each year, an annual safety report relating l’organisme de réglementation, au plus tard le 31 mars to the preceding year is submitted to the Regulator and de chaque année, un rapport annuel sur la sécurité includes portant sur l’année précédente et contenant ce qui suit : (a) a summary of lost or restricted workday a) un résumé des blessures entraînant une injuries, minor injuries and safety-related perte de temps de travail, des blessures incidents and near-misses that have sans gravité et des incidents et occurred during the preceding year; and quasi-incidents en matière de sécurité (b) a discussion of efforts undertaken to survenus au cours de l’année; improve safety. b) un exposé des mesures prises pour renforcer la sécurité. Well History Report Rapport final 88. (1) The operator shall ensure that a well history 88. (1) L’exploitant veille à ce qu’un rapport final soit report is prepared for every well drilled by the operator établi pour chacun des puits qu’il a forés aux termes de under the well approval and that the report is submitted l’approbation relative au puits et à ce que le rapport soit to the Regulator. remis à l’organisme de réglementation. (2) The well history report shall contain a record (2) Le rapport final contient tous les of all operational, engineering, petrophysical and renseignements opérationnels, techniques, geological information that is relevant to the drilling pétrophysiques et géologiques concernant le forage et and evaluation of the well. l’évaluation du puits. Well Operations Report Rapport d’exploitation du puits 89. (1) The operator shall ensure that a report 89. (1) L’exploitant veille à ce que soit remis à including the following information is submitted to the l’organisme de réglementation, dans les 30 jours Regulator within 30 days after the end of a well suivant la fin des travaux relatifs à un puits, un rapport operation: qui contient : (a) a summary of the well operation, a) un résumé des travaux, y compris les including any problems encountered problèmes survenus au cours de ceux-ci; during the well operation; b) une description des propriétés des fluides (b) a description of the completion fluid de complétion; properties; c) un schéma et les détails techniques des (c) a schematic of, and relevant engineering équipements de fond, des tubulaires, de la data on, the down-hole equipment, tête d’éruption et du système de contrôle tubulars, Christmas tree and production de la production; control system; d) les détails de toute incidence que 38 (d) details of any impact of the well operation l’exploitation du puits pourrait avoir sur on the performance of the well, including son rendement, y compris sur la any effect on recovery; récupération; (e) for any well completion, suspension or e) la date de libération de l’appareil de abandonment, the rig release date. forage en ce qui concerne la complétion, la suspension de l’exploitation ou l’abandon d’un puits. (2) The report must be signed and dated by the (2) Le rapport doit être daté et signé par operator or the operator’s representative. l’exploitant ou son représentant. Other Reports Autres rapports 90. The operator shall ensure that the Regulator is 90. L’exploitant veille à ce que l’organisme de made aware, at least once a year, of any report réglementation soit prévenu, au moins une fois l’an, de containing relevant information regarding applied tout rapport renfermant de l’information utile sur des research work or studies obtained or compiled by the études ou des travaux de recherche appliquée qu’il a operator relating to the operator’s work or activities and obtenus ou compilés concernant ses activités et veille à that a copy of any report is submitted to the Regulator ce qu’il lui en soit remis copie, sur demande. on request. COMING INTO FORCE ENTRÉE EN VIGUEUR 91. These regulations come into force April 1, 2014. 91. Le présent règlement entre en vigueur le 1er avril 2014. Printed by Imprimé par Territorial Printer, Northwest Territories l'imprimeur territorial, Territoires du Nord-Ouest Yellowknife, N.W.T./2014© Yellowknife (T. N.-O.)/2014© 39
Provision text is displayed from LexChat’s stored statute record. Use the official source links to verify amendments, commencement, and current legal force.