Electrical Protection Regulation 1
This regulation requires qualified electrical workers to register, requires permits and approvals for certain electrical work and equipment, and gives inspectors and the Chief Inspector enforcement and approval powers.
- Jurisdiction
- Canada — Northwest Territories
- Instrument
- Regulation
- Version
- Undated source snapshot
- Language
- en
- Official source
- View official record ↗
Statute overview
About this statute
This regulation requires qualified electrical workers to register, requires permits and approvals for certain electrical work and equipment, and gives inspectors and the Chief Inspector enforcement and approval powers. This provision sets out fees for electrical registrations, permits, inspections, and plan approvals, and it adopts an elevator safety standard with specific variations.
Search within this statute
Search all stored provisions in this version.
Legal text
Provisions of Electrical Protection Regulation 1
Showing 2 of 2
Part document.segment-1
Electrical Protection Regulation 1 — segment 1
- document.segment-1 Verify source ↗
Electrical Protection Regulation 1 — segment 1
This regulation requires qualified electrical workers to register, requires permits and approvals for certain electrical work and equipment, and gives inspectors and the Chief Inspector enforcement and approval powers.
ELECTRICAL PROTECTION LOI SUR LA PROTECTION CONTRE LES ACT DANGERS DE L’ÉLECTRICITÉ ELECTRICAL PROTECTION RÈGLEMENT SUR LA PROTECTION REGULATIONS CONTRE LES DANGERS DE RRNWT 1990,c.E-21 L’ÉLECTRICITÉ RRTN-O 1990, ch. E-21 AMENDED BY MODIFIÉ PAR RRNWT 1990,c.E-21(Supp.) RRTN-O 1990, ch. E-21 (Suppl.) R-098-92 R-098-92 In force April 1, 1993 En vigueur le 1er avril 1993 R-050-93 R-050-93 In force August 1, 1993 En vigueur le 1er août 1993 R-017-95 R-017-95 In force February 1, 1995 En vigueur le 1er février 1995 Except sections 4 and 6 which à l’exception des articles 4 et 6 qui sont entrés came into force March 23, 1995 en vigueur le 23 mars 1995 R-038-98 R-038-98 In force May 1, 1998 En vigueur le 1er mai 1998 Except sections 2, 3 and 11 à l’exception des articles 2, 3 et 11 qui sont which came into force July 1, 1998 entrés en vigueur le 1er juillet 1998 R-054-2001 R-054-2001 In force April 1, 2001 En vigueur le 1er avril 2001 R-019-2002 R-019-2002 In force April 1, 2002 En vigueur le 1er avril 2002 R-026-2002 R-026-2002 R-061-2005 R-061-2005 In force July 1, 2005 En vigueur le 1er juillet 2005 R-045-2006 R-045-2006 In force September 1, 2006 En vigueur le 1er septembre 2006 R-111-2009 R-111-2009 In force September 1, 2009 En vigueur le 1er septembre 2009 R-014-2013 R-014-2013 In force April 1, 2013 En vigueur le 1er avril 2013 R-053-2013 R-053-2013 In force July 19, 2013 En vigueur le 19 juillet 2013 Except sections 2 and 4 à l’exception des articles 2 et 4 qui sont entrés which came into force November 1, 2013 en vigueur le 1er novembre 2013 R-035-2015 R-035-2015 In force April 1, 2015 En vigueur le 1er avril 2015 R-052-2015 R-052-2015 R-018-2016 R-018-2016 R-031-2019 R-031-2019 In force May 1, 2019 En vigueur le 1er mai 2019 R-048-2024 R-048-2024 In force July 15, 20243 En vigueur le 15 juillet 2024 R-088-2024 [F] R-088-2024 [F] R-034-2026 R-034-2026 In force June 15, 2026 En vigueur le 15 juin 2026 This consolidation is not an official statement of the La présente codification administrative ne constitue pas law. It is an office consolidation prepared by le texte officiel de la loi; elle n’est établie qu’à titre Legislation Division, Department of Justice, for documentaire par les Affaires législatives du ministère convenience of reference only. The authoritative text of de la Justice. Seuls les règlements contenus dans les regulations can be ascertained from the Revised Règlements révisés des Territoires du Nord-Ouest Regulations of the Northwest Territories, 1990 and the (1990) et dans les parutions mensuelles de la Partie II monthly publication of Part II of the Northwest de la Gazette des Territoires du Nord-Ouest ont force Territories Gazette. de loi. This consolidation and other G.N.W.T. legislation can La présente codification administrative et les autres lois be accessed on-line at et règlements du G.T.N.-O. sont disponibles en direct à l’adresse suivante : https://www.justice.gov.nt.ca/en/browse/laws-and-leg islation/ https://www.justice.gov.nt.ca/en/browse/laws-and-leg islation/ ELECTRICAL PROTECTION LOI SUR LA PROTECTION CONTRE LES ACT DANGERS DE L’ÉLECTRICITÉ ELECTRICAL PROTECTION RÈGLEMENT SUR LA PROTECTION REGULATIONS CONTRE LES DANGERS DE L’ÉLECTRICITÉ Interpretation Définitions 1. In these regulations, 1. Les définitions qui suivent s’appliquent au présent règlement. "public service" has the meaning assigned to that term by subsection 1(1) of the Public Service Act; (fonction «branchement temporaire d’un abonné lors d’une publique) construction» Désigne un branchement à un abonné d’une durée d’au plus 90 jours pour des fins de "temporary consumer’s service for construction" means construction. (temporary consumer’s service for a consumer’s service intended to be used for 90 days or construction) less for construction purposes. (branchement temporaire d’un abonné lors d’une construction) «fonction publique» S’entend au sens du R-050-93,s.2; R-017-95,s.2; R-019-2002,s.2; paragraphe 1(1) de la Loi sur la fonction publique. R-061-2005,s.2; R-111-2009,s.2; R-048-2024,s.2. (public service) R-050-93,art.2; R-017-95, art. 2; R-019-2002, art. 2(2); R-061-2005, art. 2; R-111-2009, art. 2; R-048-2024, art. 2. Other Authorizations Autres autorisations R-048-2024,s.3. R-048-2024, art. 3. 1.1. Nothing in these regulations is to be interpreted as 1.1. Le présent règlement n’a pas pour effet de exempting a person from any requirement to obtain a soustraire une personne de toute exigence d’obtention licence, permit or other authorization under the de permis, de licence ou d’autre autorisation sous le Elevators and Lifts Act or any other legislation. régime de la Loi sur les ascenseurs et les R-048-2024,s.3. monte-charges ou toute autre loi. R-048-2024, art. 3. Registration Inscription 2. (1) All qualified electrical workers performing 2. (1) Tout électricien qualifié qui effectue des electrical work under the Act or these regulations must travaux d’électricité tels que décrits dans la Loi ou dans be registered under section 3. le présent règlement doit s’inscrire en conformité avec l’article 3. (2) No qualified electrical worker is eligible to be (2) Il est interdit de délivrer un permis issued an installation permit unless he or she is d’installation à un électricien qualifié sauf s’il est inscrit registered under section 3. en conformité avec l’article 3. 3. (1) A qualified electrical worker who applies to be 3. (1) Aux fins d’inscription, l’électricien qualifié fait registered shall submit an application to an inspector une demande auprès d’un inspecteur accompagnée des together with the fee set out in item 1 of Schedule A. droits prescrits au numéro 1 de l’annexe A. (2) An application must be in a form approved by (2) Toute demande d’inscription doit se faire selon the Chief Inspector. la formule approuvée par l’inspecteur en chef. 1 (3) The registration is valid for three years. (3) L’inscription est valide pour une période de trois ans. Code Code 4. The alterations and amendments to the Code 4. Les modifications au Code visé au paragraphe 7(1) referred to in subsection 7(1) of the Act, if any, are set de la Loi, le cas échéant, se trouvent à l’annexe B. out in Schedule B. R-017-95,s.3; R-038-98,s.2; R-017-95, art. 3; R-038-98, art. 2; R-019-2002, art. 3; R-019-2002,s.3; R-045-2006,s.2; R-111-2009,s.3; R-045-2006, art. 2; R-111-2009, art. 3; R-053-2013, R-053-2013,s.2. art. 2. Recognized Standards Normes reconnues 5. For the purposes of subsection 22(2) of the Act, the 5. Pour l’application du paragraphe 22(2) de la Loi, following codes and standards are adopted: les codes et normes suivants sont adoptés : (a) subject to the variations set out in a) sous réserve des modifications prévues à Schedule C, ASME A17.1/CSA l’annexe C, la norme de l’American B44-2019, Safety Code for Elevators and Society of Mechanical Engineers et de Escalators; l’Association canadienne de normalisation (b) the following codes or standards, as ASME A17.1-F2019/CSA B44:F19, amended from time to time: intitulée Code de sécurité sur les (i) CAN/CSA-C22.3 No. 1, Overhead ascenseurs ou monte-charges et les Systems, escaliers mécaniques; (ii) CAN/CSA-C22.3 No. 3, Electrical b) les codes et normes suivants, avec leurs Coordination, modifications successives : (iii) CSA C22.3 No. 4, Control of (i) la norme de l’Association canadienne Electrochemical Corrosion of de normalisation CAN/CSA-C22.3 Underground Metallic Structures, No. 1, intitulée Réseaux aériens, (iv) CAN/CSA-C22.3 No. 7, (ii) la norme de l’Association canadienne Underground Systems, d e n o r m a l i s a t i o n (v) CSA Z98, Passenger Ropeways and CAN/CSA-C22.3 No. 3, intitulée Passenger Conveyors, Coordination électrique, (vi) CAN/CSA-Z256, Safety Code for (iii) la norme de l’Association canadienne Material Hoists, de normalisation CSA C22.3 No. 4, (vii) CSA B355, Platform Lifts and Stair intitulée Contrôle de la corrosion Lifts for Barrier-Free Access, électrochimique des ouvrages (viii) CSA-C61400-1, Wind energy métalliques souterrains, generation systems - Part 1: Design (iv) la norme de l’Association canadienne requirements, de normalisation CAN/CSA-C22.3 (ix) CAN/CSA-Z185, Safety Code for No. 7, intitulée Réseaux souterrains, Personnel Hoists, (v) la norme de l’Association canadienne (x) CSA B44.1/ASME A17.5, Elevator de normalisation CSA Z98, intitulée and Escalator Electrical Equipment, Remontées mécaniques et (xi) CSA B44.2, Maintenance convoyeurs, Requirements and Intervals for (vi) la norme de l’Association canadienne Elevators, Dumbwaiters, Escalators, de normalisation CAN/CSA-Z256, and Moving Walks, intitulée Règles de sécurité pour les (xii) CSA CAN/CSA-C61215, Crystalline monte-matériaux, Silicon Terrestrial Photovoltaic (PV) (vii) la norme de l’Association canadienne Modules - Design Qualification and de normalisation CSA B355, Type Approval, intitulée Plates-formes et appareils (xiii) National Research Council of élévateurs d’escalier pour un accès Canada, National Building Code of sans obstacles, 2 Canada, section 9.34, Electrical (viii) la norme de l’Association canadienne Facilities, de normalisation CSA-C61400-1, (xiv) CAN/CSA-B311, Safety Code for intitulée Eoliennes - Partie 1: Manlifts. Exigences de conception, R-048-2024,s.4. (ix) la norme de l’Association canadienne de normalisation CAN/CSA-Z185, intitulée Règles de sécurité pour les monte-charges pour personnes, (x) la norme de l’Association canadienne d e n o r m a l i s a t i o n CSA B44.1/ASME A17.5, intitulée Équipements électriques pour ascenseurs, monte-charges et escaliers mécaniques, (xi) la norme de l’Association canadienne de normalisation CSA B44.2, intitulée Les besoins d’entretien et les intervalles pour les ascenseurs, les escaliers mécaniques, petits monte-charges et trottoirs roulants, (xii) la norme de l’Association canadienne d e n o r m a l i s a t i o n CSA CAN/CSA-C61215, intitulée Modules photovoltaïques (PV) au silicium cristallin pour application terrestre - Qualification de la conception et homologation, (xiii) la norme du Conseil national de recherches du Canada, Code national du bâtiment du Canada, article 9.34, intitulée Electrical Facilities, (xiv) la norme de l’Association canadienne de normalisation CAN/CSA-B311, intitulée Code de sécurité sur les monte-personne. R-048-2024, art. 4. 5.1. No person shall perform any electrical work 5.1. Il est interdit d’effectuer tout travail électrique si except in accordance with the codes or standards ce n’est conformément aux codes et aux normes adoptés adopted under section 5. R-111-2009,s.4. en vertu de l’article 5. R-111-2009, art. 4. Approval of Electrical Equipment Approbation du matériel électrique 6. (1) No person shall sell, display, advertise, use, 6. (1) Il est interdit de vendre, d’afficher, d’annoncer, offer for sale or otherwise dispose of, in the Northwest d’utiliser, d’offrir pour la vente ou autre aliénation dans Territories, any electrical equipment that has not been les Territoires du Nord-Ouest tout matériel électrique approved in accordance with these regulations. qui n’a pas été inspecté et approuvé en conformité avec le présent règlement. (2) In order to be approved under subsection (1), (2) Pour être approuvé en conformité avec le electrical equipment must paragraphe (1), tout matériel électrique doit, en plus de (a) be submitted for examination and testing porter la marque de certification ou d’approbation to a certification agency acceptable to the autorisée par l’agence de certification ou de l’inspecteur Chief Inspector, be given formal en chef : 3 certification by the agency to the effect a) soit être soumis à une agence de that the equipment conforms to the certification acceptable à l’inspecteur en appropriate Canadian Standards chef pour examen et mise à l’essai, être Association standards established under certifié par l’agence que le matériel est the provisions of the Code, and the conforme aux normes de l’Association certification report must be adopted by 2/3 canadienne de normalisation établies en of the Provincial and Territorial vertu du Code et, de plus, le rapport de Inspection Authorities represented by the certification doit être adopté par le 2/3 des Committee on Part I of the Code, or autorités d’inspection des provinces et des (b) be approved by the Chief Inspector in territoires qui sont réprésentées par le accordance with subsection (3), and bear comité de la partie I du Code; evidence of having been certified or b) soit être approuvé par l’inspecteur en chef approved in the form of a label or marking en conformité avec le paragraphe (3). authorized by the certification agency or the Chief Inspector. (3) Electrical equipment may be submitted to the (3) Le matériel électrique peut être présenté à Chief Inspector for approval where l’inspecteur en chef pour son approbation lorsque : (a) the equipment is of a specialized nature a) le matériel est de nature spécialisée et and there is no counterpart for that qu’il n’existe pas de matériel equipment that bears certification correspondant dont la certification est acceptable to the Chief Inspector; and acceptable à l’inspecteur en chef; (b) the equipment is assembled in the b) le matériel est assemblé dans les Northwest Territories. Territoires du Nord-Ouest. (4) The Chief Inspector may approve electrical (4) L’inspecteur en chef peut approuver le matériel equipment submitted under subsection (3) where the électrique qui lui est soumis en vertu du paragraphe (3), equipment complies with the applicable standards of lorsque ce matériel est conforme aux normes (a) the Canadian Gas Association; applicables de : (b) the Underwriters’ Laboratories of Canada; a) l’Association canadienne du gaz; or b) les Underwriters’ Laboratories of (c) a testing laboratory other than one Canada; referred to in paragraph (a) or (b) that is c) un laboratoire de mise à l’essai autre que satisfactory to the Chief Inspector. ceux qui sont mentionnés aux alinéas a) et R-061-2005,s.4; R-111-2009,s.5. b) et qui est acceptable à l’inspecteur en chef. R-061-2005, art.4; R-111-2009, art. 5. 7. (1) Where electrical equipment is installed and 7. (1) Lorsqu’une installation de matériel électrique connected to an electrical energy source before the est raccordée à une source d’énergie électrique avant equipment is approved in accordance with section 6, an que le matériel soit approuvé en conformité avec inspector may l’article 6, l’inspecteur peut jusqu’à ce que le matériel (a) instruct the supply authority to withhold électrique soit approuvé : or disconnect the supply of electric energy a) soit donner l’instruction au fournisseur to the premises in or on which the autorisé de suspendre ou de débrancher la electrical equipment is located, or fourniture d’énergie électrique au local (b) remove the electrical equipment from the dans ou sur lequel le matériel électrique premises in or on which the electrical est placé; equipment is located, b) soit enlever le matériel électrique du local until the electrical equipment is approved. dans ou sur lequel ce matériel est placé. 4 (2) Where a supply authority is instructed to (2) Lorsque le fournisseur autorisé reçoit withhold or disconnect the supply of electric energy to l’instruction de suspendre ou de débrancher la premises under paragraph (1)(a), the supply authority fourniture d’énergie électrique à un local visé à shall not supply electric energy to those premises until l’alinéa (1)a), il est interdit au fournisseur autorisé de authorized by an inspector. fournir de l’énergie électrique à ce local sans l’autorisation de l’inspecteur. 8. (1) Where a person displays, advertises, offers for 8. (1) Lorsqu’une personne affiche, annonce, offre sale or otherwise disposes of electrical equipment pour la vente ou autre aliénation tout matériel électrique before it is approved in accordance with section 6, an avant que ce matériel soit approuvé en vertu de inspector may l’article 6, l’inspecteur peut : (a) order the person to remove the electrical a) soit ordonner à la personne d’enlever le equipment from display and to cease matériel électrique à l’affiche et de cesser advertising, offering for sale or otherwise la publicité, la vente ou autre aliénation de disposing of the electrical equipment; or ce matériel; (b) remove the electrical equipment from the b) soit enlever le matériel électrique du local premises in or on which the electrical dans ou sur lequel ce matériel est placé. equipment is located. (2) A person who is subject to an order of an (2) Quiconque est assujetti à ordre d’un inspecteur inspector made under paragraph (1)(a) shall comply donné en application de l’alinéa (1)a), s’y conformer. with the order. Installation Permit Permis d’installation 9. (1) An application for an installation permit must 9. (1) Toute demande de permis d’installation doit se be in a form approved by the Chief Inspector. faire selon la formule approuvée par l’inspecteur en chef. (2) Subject to subsection (4), the fee for an (2) Sous réserve du paragraphe (4), les droits installation permit is set out in item 2 of Schedule A. exigibles pour l’obtention d’un permis d’installation figurent à l’article 2 de l’annexe A. (3) Repealed, R-048-2024,s.5(2). (3) Abrogé, R-048-2024, art. 5(2). (4) The fee for an installation permit for a (4) Les droits exigibles pour l’obtention d’un temporary consumer’s service for construction is set out permis d’installation pour le branchement temporaire in item 4 of Schedule A. d’un abonné lors d’une construction sont indiqués à l’article 4 de l’annexe A. (5) Every person who fails to pay a fee referred to (5) Quiconque omet de payer les droits visés au in subsection (2) or (4) prior to commencing electrical paragraphe (2) ou (4) avant le début de travaux work, is liable to a penalty of an amount that is equal to d’électricité est passible d’une amende égale au double twice the amount of the fee. R-038-98,s.4; R-061-2005, du montant des droits. R-038-98, art. 4; R-061-2005, s.5; R-048-2024,s.5. art. 5; R-048-2024, art. 5; R-088-2024, art. 2. 10. (1) The permit fee under subsection 9(2) is 10. (1) Les droits exigibles pour l’obtention d’un calculated in accordance with this section and permis visé au paragraphe 9(2) sont calculés en section 12. conformité avec le présent article ainsi que l’article 12. (2) Where labour and materials for electrical work (2) Lorsque la main-d’œuvre et le matériel pour are to be provided by an applicant for an installation les travaux électriques sont fournis par l’auteur du permit, the permit fee is based on permis d’installation, les droits exigibles pour 5 (a) the charge to the customer for the l’obtention d’un permis sont fondés sur : electrical equipment installed and the a) le coût au client du matériel électrique electrical work performed, other than installé ainsi que du travail d’électricité electrical equipment supplied by the qui est effectué, mais ne comprend pas le customer and electrical work referred to in matériel électrique fourni par le client ni paragraph (c); le travail d’électricité visé à l’alinéa c); (b) all reasonable travelling and living b) tous les frais raisonnables de déplacement expenses incurred by the applicant while et de séjour de l’auteur du permis absent from his or her place of residence encourus lors de son absence de son lieu and in the course of carrying out the ordinaire de résidence pour l’exécution electrical work; and des travaux; (c) twice the charge to the customer for any c) le double du coût au client pour tout electrical work performed in installing travail d’électricité effectué à l’installation electrical equipment supplied by the du matériel électrique fourni par le client. customer. (3) Where labour only for electrical work is to be (3) Lorsque l’auteur d’un permis d’installation ne provided by an applicant for an installation permit, the compte fournir que la main-d’œuvre pour les travaux permit fee is based on d’électricité, les droits exigibles pour l’obtention du (a) twice the charge to the customer of the permis sont fondés sur : electrical work performed; and a) le double du coût au client pour les travaux (b) all reasonable travelling and living d’électricité effectués; expenses incurred by the applicant while b) tous les frais raisonnables de déplacement absent from his or her place of residence et de séjour de l’auteur du permis encourus and in the course of carrying out the lors de son absence de son lieu ordinaire de electrical work. résidence pour l’exécution des travaux. (4) The charge to the customer for electrical (4) Le coût au client du matériel électrique equipment that is portable, as defined in the Code, is portable tel que défini dans le Code, ne figure pas au not included in calculating the permit fee. calcul des droits exigibles pour l’obtention du permis. 11. An applicant for an installation permit shall 11. À la demande d’un inspecteur, l’auteur d’un permis produce, at the request of an inspector, all invoices, d’installation doit produire toute facture, toute written estimates and other evidence that the inspector estimation par écrit et toute autre documentation jugée may require to calculate the permit fee. nécessaire par l’inspecteur au calcul des droits exigibles pour l’obtention du permis. 12. (1) In this section, "cost of electrical work" means 12. (1) Dans le présent article, «coût des travaux the charges and expenses referred to in subsection 10(2) d’électricité» s’entend des coûts et des dépenses visés or (3). aux paragraphes 10(2) ou (3). (2) Where the cost of electrical work cannot be (2) Lorsque le coût des travaux d’électricité ne determined at the time of the application for an peut être défini avec précision lors de la demande d’un installation permit, the permit fee is calculated on the permis d’installation, les droits exigibles pour basis of the estimated cost of the electrical work. l’obtention du permis sont calculés à partir de l’estimation du coût des travaux d’électricité. (3) Subject to subsection (4), where the actual cost (3) Sous réserve du paragraphe (4), lorsque le coût of electrical work under an installation permit exceeds réel des travaux d’électricité prévu au permis the estimated cost of the electrical work, the holder of d’installation excède l’estimation du coût de ces the permit shall pay a supplementary fee, based on the travaux, le titulaire du permis doit verser un droit actual cost of the electrical work less the fees already supplémentaire fondé sur le coût réel des travaux paid. d’électricité moins le montant déjà versé. 6 (4) The holder of an installation permit is not (4) Le titulaire d’un permis d’installation n’a pas required to pay a supplementary fee where the amount à verser de droit supplémentaire lorsque ce droit est of the supplementary fee is $25 or less. d’au plus 25 $. (5) Subject to subsections (6) and (7), where the (5) Sous réserve des paragraphes (6) et (7), estimated cost of electrical work under an installation lorsque l’estimation du coût des travaux d’électricité permit exceeds the actual cost of the electrical work, an prévue au permis d’installation excède le coût réel de inspector shall, on application, refund the excess fees ces travaux, l’inspecteur doit, sur demande rembourser paid. l’excès des droits versés. (6) An inspector shall not give a refund where the (6) L’inspecteur ne doit pas faire un amount of the refund is $25 or less. remboursement lorsque le montant du remboursement est égal ou inférieur à 25 $. (7) An inspector shall deduct the sum of $25 from (7) L’inspecteur déduit le montant de 25 $ de tout any refund over $25. remboursement excédant 25 $. 13. (1) An installation permit, other than for a 13. (1) Tout permis d’installation, sauf les permis pour temporary consumer’s service for construction, is valid le branchement temporaire d’un abonné lors d’une for one year. construction, est valide pour une période d’un an. (2) An installation permit for a temporary (2) Un permis d’installation pour le branchement consumer’s service for construction is valid for 90 days temporaire d’un abonné lors d’une construction est or for such shorter period as may be specified by an valide pour une période de 90 jours ou pour toute autre inspector on the permit. période de moins de 90 jours que l’inspecteur spécifie. (3) An inspector may grant one or more extensions (3) L’inspecteur peut proroger le délai d’un permis of an installation permit. d’installation. (4) Where an installation permit is extended, the (4) Lorsque la période d’un permis d’installation holder of the permit is not required to pay an additional est prolongée, le titulaire du permis n’est pas requis de fee. verser un droit supplémentaire. 14. (1) An inspector may cancel an installation permit, 14. (1) Un inspecteur peut annuler tout permis other than for a temporary consumer’s service for d’installation sauf les permis d’installation pour le construction, where branchement temporaire d’un abonné lors d’une (a) no work has been done under the permit construction lorsque : for 90 days or longer; or a) aucun travail prévu au permis n’a été (b) the holder of the permit fails to comply effectué pendant une période d’au moins with any provision contained in the 90 jours; permit, the Act or these regulations. b) le titulaire du permis ne se conforme pas aux dispositions du permis, de la Loi ou du présent règlement. (2) Where an installation permit is cancelled under (2) Lorsqu’un permis d’installation est annulé en this section, an inspector may instruct the supply vertu du présent article, l’inspecteur peut donner authority to withhold or disconnect the supply of l’instruction au fournisseur autorisé de suspendre ou de electric energy to the premises in or on which the débrancher la fourniture d’énergie électrique au local electrical work authorized by the permit is being dans ou sur lequel les travaux d’électricité autorisés par performed. le permis sont effectués. (3) Where a supply authority is instructed to (3) Lorsque le fournisseur autorisé reçoit withhold or disconnect the supply of electric energy to l’instruction de suspendre ou de débrancher la 7 premises under subsection (2), the supply authority fourniture d’énergie électrique au local visé au shall not supply electric energy to those premises until paragraphe (2), le fournisseur autorisé ne peut fournir authorized by an inspector. d’énergie électrique à ce local sans l’autorisation de l’inspecteur. 15. (1) An inspector may cancel an installation permit 15. (1) L’inspecteur peut annuler un permis for a temporary consumer’s service for construction d’installation pour le branchement temporaire d’un where the holder of the permit fails to comply with any abonné lors d’une construction lorsque le titulaire du provision contained in the permit, the Act or these permis ne se conforme pas aux dispositions du permis, regulations. de la Loi ou du présent règlement. (2) Where an installation permit for a temporary (2) Lorsqu’un permis d’installation pour le consumer’s service for construction is cancelled, an branchement temporaire d’un abonné lors d’une inspector may instruct the supply authority to withhold construction est annulé, l’inspecteur peut donner or disconnect the supply of electric energy to the l’instruction au fournisseur autorisé de suspendre ou de temporary consumer’s service for construction. débrancher la fourniture d’énergie électrique à ce branchement temporaire. (3) Where a supply authority is instructed to (3) Lorsque le fournisseur autorisé reçoit withhold or disconnect the supply of electric energy to l’instruction de suspendre ou de débrancher la fourniture a temporary consumer’s service for construction, the d’énergie électrique au branchement temporaire d’un supply authority shall not supply electric energy to that abonné lors d’une construction, il lui est interdit de service until authorized by an inspector. fournir de l’énergie électrique à ce branchement temporaire sans l’autorisation de l’inspecteur. Annual Permit Permis annuel 16. (1) An application for an annual permit must be in 16. (1) Toute demande de permis annuel doit être faite a form approved by the Chief Inspector. selon la formule approuvée par l’inspecteur en chef. (2) The fee for an annual permit is set out in item (2) Les droits exigibles pour le permis annuel 5 of Schedule A. figurent à l’article 5 de l’annexe A. (3) The fee is calculated according to the total (3) Le droit exigible est calculé selon la puissance installed capacity in kilovolt-amperes of the industrial totale installée en kilovoltampères de l’entreprise or commercial establishment of the operator applying industrielle ou commerciale de l’opérateur qui fait la for the permit. demande du permis. (4) Every person who fails to pay a fee referred to (4) Quiconque omet de payer les droits visés au in subsection (2) prior to commencing electrical work, paragraphe (2) avant le début de travaux d’électricité is liable to a penalty of an amount that is equal to twice est passible d’une amende égale au double du montant the amount of the fee. R-038-98,s.5; R-061-2005,s.6. des droits. R-038-98, art. 5; R-061-2005, art 6. 17. An inspector may cancel an annual permit where 17. L’inspecteur peut annuler le permis annuel lorsque the holder of the permit fails to comply with any le titulaire du permis ne se conforme pas aux provision contained in the permit, the Act or these dispositions du permis, de la Loi ou du présent regulations. règlement. 18. Electrical work performed under an annual permit 18. Les travaux d’électricité visés au permis annuel ne must doivent pas : (a) not increase the installed capacity in a) soit augmenter la puissance installée en kilovolt-amperes of the establishment by kilovoltampère de l’entreprise au-delà de 10% or more; or 10 %; 8 (b) not require a connection to the distribution b) soit nécessiter un branchement au système system of the supply authority. de distribution du fournisseur autorisé. 19. (1) The holder of an annual permit shall keep and 19. (1) Le titulaire d’un permis annuel doit garder et maintain in his or her establishment a written record of tenir dans son établissement un registre par écrit de tous all electrical work performed in the establishment travaux d’électricité effectués dans l’établissement, y including compris : (a) the date the work is performed; a) la date à laquelle les travaux d’électricité (b) a description of the work performed; and sont effectués; (c) the name of the qualified electrical worker b) la description des travaux d’électricité who performed the work. complétés; c) le nom de l’électricien qualifié qui a effectué les travaux d’électricité. (2) The holder of an annual permit shall produce (2) Sur demande de l’inspecteur, le titulaire d’un the record for examination upon the request of an permis annuel doit produire le registre pour examen. inspector. Residential Property Owner’s Permit Permis de propriétaire de résidence 20. (1) An application for a residential property 20. (1) Toute demande de permis de propriétaire de owner’s permit must be in a form approved by the Chief résidence doit se faire selon la formule approuvée par Inspector. l’inspecteur en chef. (2) Subject to subsection (3), the fee for a (2) Sous réserve du paragraphe (3), le droit residential property owner’s permit is set out in item 2 exigible pour l’obtention d’un permis de propriétaire de of Schedule A and is based on twice the cost to the résidence figure à l’article 2 de l’annexe A et est fondé applicant of the electrical equipment to be installed sur le double du coût à l’auteur du permis du matériel under the permit. électrique à installer aux termes du permis. (3) The fee for a residential property owner’s (3) Le droit exigible pour l’obtention d’un permis permit for a temporary consumer’s service for de propriétaire de résidence pour le branchement construction is set out in item 4 of Schedule A. temporaire d’un abonné lors d’une construction est indiqué à l’article 4 de l’annexe A. (4) The cost of electrical equipment that is (4) Le coût du matériel électrique portable tel que portable as defined in the Code is not included in défini dans le Code n’est pas inclus au calcul du droit calculating the permit fee under subsection (2). exigible pour l’obtention d’un permis visé au paragraphe (2). (5) An applicant for a residential property owner’s (5) Sur demande de l’inspecteur, l’auteur d’un permit shall produce, at the request of an inspector, all permis de propriétaire de résidence produit toute invoices, written estimates and other evidence as the facture, toute estimation par écrit ou toute autre preuve inspector may require to calculate the permit fee. que l’inspecteur peut juger nécessaire au calcul du droit exigible pour l’obtention du permis. (6) Every person who fails to pay a fee referred to (6) Quiconque omet de payer les droits visés au in subsection (2) or (3) prior to commencing electrical paragraphe (2) ou (3) avant le début de travaux work, is liable to a penalty of an amount that is equal to d’électricité est passible d’une amende égale au double twice the amount of the fee. R-038-98,s.6; du montant des droits. R-038-98, art. 6; R-061-2005, R-061-2005,s.7. art. 7. 9 21. (1) A residential property owner’s permit, other 21. (1) Tout permis de propriétaire de résidence, à than for a temporary consumer’s service for l’exception du permis de branchement temporaire d’un construction, is valid for one year. abonné lors d’une construction, est valide pour une année. (2) A residential property owner’s permit for a (2) Tout permis de proprétaire de résidence pour temporary consumer’s service for construction is valid le branchement temporaire d’un abonné lors d’une for 90 days or for such shorter period as may be construction est valide pour une période de 90 jours ou specified by an inspector on the permit. pour toute période de moins de 90 jours que l’inspecteur spécifie. (3) An inspector may grant one or more extensions (3) L’inspecteur peut proroger le délai d’un permis of a residential property owner’s permit. de propriétaire de résidence. (4) Where a residential property owner’s permit is (4) Lorsque le délai d’un permis de propriétaire de extended, the holder of the permit is not required to pay résidence est prorogé, le titulaire du permis n’est pas an additional fee. requis de verser un droit supplémentaire. 22. (1) An inspector may cancel a residential property 22. (1) L’inspecteur peut annuler un permis de owner’s permit, other than for a temporary consumer’s propriétaire de résidence, autre que pour le branchement service for construction, where temporaire d’un abonné lors d’une construction, lorsque : (a) no work has been done under the permit a) aucun travail prévu au permis n’a été for 90 days or longer; or effectué pendant une période d’au moins (b) the holder of the permit fails to comply 90 jours; with any provision contained in the b) le titulaire du permis ne se conforme pas permit, the Act or these regulations. aux dispositions du permis, de la Loi ou du présent règlement. (2) Where a residential property owner’s permit is (2) Lorsqu’un permis de propriétaire de résidence cancelled under subsection (1), an inspector may est annulé en vertu du paragraphe (1), l’inspecteur peut instruct the supply authority to withhold or disconnect donner l’instruction au fournisseur autorisé de the supply of electric energy to the premises in or on suspendre ou de débrancher la fourniture d’énergie which the electrical work authorized by the permit is électrique au local dans ou sur lequel les travaux being performed. d’électricité autorisés par le permis sont effectués. (3) Where a supply authority is instructed to (3) Lorsque le fournisseur autorisé reçoit withhold or disconnect the supply of electric energy to l’instruction de suspendre ou de débrancher la fourniture premises under subsection (2), the supply authority d’énergie électrique au local visé au paragraphe (2), le shall not supply electric energy to those premises until fournisseur autorisé ne peut fournir d’énergie électrique authorized by an inspector. à ce local sans l’autorisation de l’inspecteur. 23. (1) An inspector may cancel a residential property 23. (1) L’inspecteur peut annuler un permis de owner’s permit for a temporary consumer’s service for propriétaire de résidence pour le branchement construction where the holder of the permit fails to temporaire d’un abonné lors d’une construction lorsque comply with any provision contained in the permit, the le titulaire ne se conforme pas aux dispositions du Act or these regulations. permis, de la Loi ou du présent règlement. (2) Where a residential property owner’s permit (2) Lorsqu’un permis de propriétaire de résidence for a temporary consumer’s service for construction is pour le branchement temporaire d’un abonné lors d’une cancelled, an inspector may instruct the supply construction est annulé, l’inspecteur peut donner authority to withhold or disconnect the supply of l’instruction au fournisseur autorisé de suspendre ou de electric energy to that service. débrancher la fourniture d’énergie électrique à ce branchement. 10 (3) Where a supply authority is instructed to (3) Lorsqu’un fournisseur autorisé reçoit withhold or disconnect the supply of electric energy to l’instruction de suspendre ou de débrancher la a temporary consumer’s service for construction, the fourniture d’énergie au branchement temporaire d’un supply authority shall not supply electric energy to that abonné lors d’une construction, il lui est interdit de service until authorized by an inspector. fournir de l’énergie électrique sans l’autorisation de l’inspecteur. 24. No residential property owner’s permit shall be 24. Il est interdit de délivrer un permis de propriétaire issued for electrical work to a residence where the de résidence pour des travaux d’électricité à une rating of the consumer’s service exceeds 125 amperes résidence lorsque la puissance du branchement d’un or the consumer’s service is other than single phase. abonné dépasse 125 ampères ou lorsque le branchement d’un abonné est autre que monophasé. Refunds Remboursement 25. (1) Subject to this section, an inspector shall, on 25. (1) Sous réserve du présent article, l’inspecteur the application of the holder of an installation permit or doit, sur demande du titulaire d’un permis d’installation a residential property owner’s permit, refund the fees ou d’un permis de propriétaire de résidence, rembourser paid where the inspector is satisfied that les droits versés lorsque l’inspecteur est satisfait que : (a) the electrical work authorized by the a) soit que les travaux d’électricité autorisés permit is par le permis : (i) not commenced, (i) ne sont pas commencés, (ii) cancelled or destroyed before (ii) sont annulés ou détruits avant d’être completion, or terminés, (iii) included in another permit; or (iii) sont inclus dans un autre permis; (b) the permit is cancelled. b) soit que le permis est annulé. (2) An inspector shall not refund fees paid on (2) L’inspecteur ne rembourse pas les droits versés electrical work that is completed under the permit, pour les travaux d’électricité complétés selon le permis unless the electrical work is destroyed. sauf si ces derniers sont détruits. (3) No person is eligible for a refund of fees under (3) Seuls ceux qui font une demande de a permit unless an application for the refund is made remboursement de droits versés pour l’obtention d’un within 90 days of the day the permit is issued. permis dans les 90 jours suivant la date de délivrance du permis ont droit à un remboursement. (4) An inspector shall not give a refund where the (4) L’inspecteur ne doit pas faire un amount of the refund is $25 or less. remboursement lorsque le montant du remboursement est de 25 $ ou moins. (5) An inspector shall deduct the sum of $25 from (5) L’inspecteur déduit le montant de 25 $ de tout any refund over $25. remboursement au-delà de 25 $. (6) A holder of a residential property owner’s (6) Le titulaire d’un permis de propriétaire de permit for a temporary consumer’s service for résidence pour le branchement temporaire d’un abonné construction or an installation permit for a temporary lors d’une construction ou le titulaire d’un permis consumer’s service for construction is not eligible for a d’installation pour le branchement temporaire d’un refund of fees under the permit. R-048-2024,s.6. abonné lors d’une construction n’a pas droit au remboursement du droit versé pour l’obtention du permis. R-048-2024, art. 6. 11 General Disposition générale 26. A permit is not transferable. 26. Un permis n’est pas transférable. Inspections Inspections 26.1. An inspector may inspect any electrical work. 26.1. Les inspecteurs peuvent inspecter tout travail R-111-2009,s.6. électrique. R-111-2009, art. 6. 27. (1) Where more than one inspection and one re- 27. (1) Lorsque l’inspecteur juge que plus d’une inspection of electrical work are necessary in the inspection et plus d’une inspection ultérieure des opinion of an inspector, the fee that the inspector may travaux d’électricité sont nécessaires, le droit exigible charge for each subsequent re-inspection is set out in pour chacune des réinspections figure à l’article 6 de item 6 of Schedule A. l’annexe A. (2) A person who requests that an inspection not (2) La personne qui demande une inspection de otherwise required by the Act be made of electrical travaux d’électricité qui n’est pas autrement requise par work shall pay the fee set out in item 6 of Schedule A la Loi doit verser le droit indiqué à l’article 6 de for the inspection. l’annexe A pour l’inspection. (3) The number of ½ hour intervals used to (3) Le nombre de demi-heures utilisé pour calculer calculate the fees referred to in subsections (1) and (2) les droits visés aux paragraphes (1) et (2) comprend le includes the time necessary for the inspector to travel temps du déplacement de l’inspecteur de son bureau au from his or her office to the inspection site and to return site de l’inspection et le retour. to his or her office. (4) The cost of travelling and living expenses are (4) Les frais de déplacement et de séjour sont payable where an inspector is absent from his or her payables lorsqu’un inspecteur accomplit, hors du lieu place of residence in order to perform a re-inspection or de sa résidence habituelle, une inspection ultérieure ou inspection referred to in subsections (1) and (2). une inspection visées aux paragraphes (1) et (2). (5) Where travelling and living expenses are (5) Lorsque les frais de déplacement et de séjour payable under subsection (4), the amount payable shall sont payables en vertu du paragraphe (4), le montant be calculated in accordance with the allowances payable est le montant que les fonctionnaires de la payable to persons employed in the public service for fonction publique reçoivent pour leurs frais de duty travel expenses. R-038-98,s.7; R-111-2009,s.7; déplacement et de séjour. R-038-98, art. 7; R-111-2009, R-014-2013,s.2; R-048-2024,s.7. art. 7; R-014-2013, art. 3; R-048-2024, art. 7. (6) Repealed, R-048-2024,s.7. (6) Abrogé, R-048-2024, art. 7. Approval of Plans Approbation de plans 28. (1) The installation of electrical equipment in any 28. (1) L’installation de matériel électrique dans un building is an installation under paragraph 9(1)(c) of the bâtiment est réputée être une installation en vertu de Act. l’alinéa 9(1)c) de la Loi. (2) Subsection (1) does not apply to an installation (2) Le paragraphe (1) ne s’applique pas à une in a building kept or occupied solely as a single family installation dans un bâtiment servant uniquement dwelling-house. R-018-2016,s.2; R-048-2024,s.8. d’habitation unifamiliale. R-018-2016, art. 2; R-048-2024, art. 8. 12 29. An inspector shall not approve plans and 29. Sauf si les plans et spécifications portent specifications for an installation under subsection 9(2) l’estampille ou le sceau d’un ingénieur tel qu’il est of the Act where défini dans la Loi sur les professions d’ingénieur et de (a) the installation includes the installation of géoscientifique en conformité avec cette loi, il est a consumer’s service in which the rating interdit à l’inspecteur d’approuver les plans et of the consumer’s service exceeds 400 spécifications d’une installation visée au amperes and is single phase, paragraphe 9(2) de la Loi lorsque : (b) the installation includes the installation of a) l’installation inclut l’installation d’un a consumer’s service in which the rating branchement d’abonné dont la puissance of the consumer’s service exceeds 200 dépasse 400 ampères et est monophasée; amperes and is three phase, or b) l’installation inclut l’installation d’un (c) the nominal voltage rating of the electrical branchement d’abonné dont la puissance equipment being installed exceeds 750 dépasse 200 ampères et est triplephasée; volts, c) la tension nominale du matériel électrique unless the plans and specifications are stamped or installé dépasse 750 volts. sealed by a professional engineer, as defined in the R-111-2009, art. 8. Engineering and Geoscience Professions Act, in accordance with that Act. R-111-2009,s.8. 30. A person who submits plans and specifications 30. Quiconque soumet des plans et spécifications en under subsection 9(1) of the Act shall pay the fee set vertu du paragraphe 9(1) de la Loi doit verser le droit out in item 7 of Schedule A. R-018-2016,s.3. exigible qui figure au numéro 7 de l’annexe A. Heading repealed, R-048-2024,s.9. Intertitre abrogé, R-048-2024, art. 9. 31 to 42 - Repealed, R-048-2024,s.9. 31 à 42 - Abrogés, R-048-2024, art. 9. Appeal Appel 43. (1) A person who is aggrieved by a decision or 43. (1) La personne lésée par la décision ou l’ordre order of an inspector under these regulations, may d’un inspecteur en vertu du présent règlement peut en appeal to the Chief Inspector. appeler à l’inspecteur en chef. (2) Subsections 19(2) to (4) of the Act apply to an (2) Les paragraphes 19(2) à (4) de la Loi appeal under subsection (1). s’appliquent à tout appel visé au paragraphe (1). Transitional Dispositions transitoires 44. (1) A permit issued before the commencement of 44. (1) Tout permis délivré avant l’entrée en vigueur these regulations is deemed to be a permit under these du présent règlement est réputé être un permis en regulations. conformité avec le présent règlement. (2) A certificate issued before the commencement (2) Tout certificat délivré avant l’entrée en vigueur of these regulations is deemed to be a certificate under du présent règlement est réputé être un certificat en these regulations. conformité avec le présent règlement. 13 SCHEDULE A (Sections 3, 9, 16, 20, 27, 30, 32, 34 and 35) 1. The registration fee for a qualified electrical worker is .......... $ 88 2. The fee for an installation permit or a residential property owner’s permit for electrical work that costs (a) $500 or less is................................... $ 48 (b) $501 to $1,000 is ................................ $ 95 (c) $1,001 to $2,000 is............................... $ 127 (d) $2,001 to $5,000,000 is ........................... $ 127 plus $32 for every $1,000 or part of $1,000 over $2,001 (e) over $5,000,000 is ............................. $160,202 plus $32 for every $1,000,000 or part of $1,000,000 over $5,000,000 3. The fee for an installation permit or residential property owner’s permit for a temporary consumer’s service for construction with a capacity of (a) 100 amperes or less is........................... $ 91 (b) over 100 amperes is ............................ $ 91 plus $48 for every 100 amperes or part of 100 amperes over 100 amperes 4. The fee for an annual permit where the installed capacity in kilovolt-amperes (kVA) of the establishment is (a) 100 kVA or less is .............................
Part document.segment-2
Electrical Protection Regulation 1 — segment 2
- document.segment-2 Verify source ↗
Electrical Protection Regulation 1 — segment 2
This provision sets out fees for electrical registrations, permits, inspections, and plan approvals, and it adopts an elevator safety standard with specific variations.
$ 230 (b) 101 kVA to 2,500 kVA is........................ $ 230 plus $32 for every 100 kVA or part of 100 kVA over 101 kVA (c) 2,501 kVA to 5,000 kVA is ...................... $ 991 plus $26 for every 100 kVA or part of 100 kVA over 2,501 kVA 14 ANNEXE A (articles 3, 9, 16, 20, 27, 30, 32, 34 et 35) 1. Droit payable pour l’inscription d’un électricien qualifié......... 88 $ 2. Droit payable pour l’obtention d’un permis d’installation ou d’un permis de propriétaire de résidence, lorsque le coût des travaux d’électricité est : a) de 500 $ ou moins................................ 48 $ b) de 501 $ à 1 000 $ ............................... 95 $ c) de 1 001 $ à 2 000 $.............................. 127 $ d) de 2 001 $ à 5 000 000 $ .......................... 127 $ plus 32 $ pour chaque tranche de 1 000 $ ou partie de tranche de 1 000 $ au-delà de 2 001 $ e) de plus de 5 000 000 $ ......................... 160 202 $ plus 32 $ pour chaque tranche de 1 000 000 $ ou partie de tranche de 1 000 000 $ au-delà de 5 000 000 $ 3. Droit payable pour l’obtention d’un permis d’installation ou d’un permis de propriétaire de résidence pour le branchement temporaire d’un abonné lors d’une construction, avec une capacité de : a) 100 ampères ou moins ......................... 91 $ b) plus de 100 ampères........................... 91 $ plus 48 $ pour chaque tranche de 100 ampères ou partie de tranche de 100 ampères au-delà de 100 ampères 4. Droit payable pour l’obtention d’un permis annuel, lorsque la puissance installée en kilovoltampère (kVA) de l’établissement est : a) de 100 kVA ou moins.......................... 230 $ b) de 101 kVA à 2 500 kVA....................... 230 $ plus 32 $ pour chaque tranche de 100 kVA ou partie de tranche de 100 kVA au-delà de 101 kVA; c) de 2 501 kVA à 5 000 kVA ..................... 991 $ plus 26 $ pour chaque tranche de 100 kVA ou partie de tranche de 100 kVA au-delà de 2 501 kVA 15 (d) 5,001 kVA to 10,000 kVA is ....................... $1,586 plus $19 for every 100 kVA or part of 100 kVA over 5,001 kVA (e) 10,001 kVA to 20,000 kVA is ...................... $2,538 plus $13 for every 100 kVA or part of 100 kVA over 10,001 kVA (f) over 20,000 kVA is............................... $3,806 plus $9 for every 100 kVA or part of 100 kVA over 20,000 kVA 5. The fee for each subsequent re-inspection and each requested inspection of electrical work is............................. $ 80 for each ½ hour or part of a ½ hour plus travelling and living expenses 6. The fee for the approval of plans and specifications is........... $ 80 for each ½ hour or part of a ½ hour R-034-2026,s.2. 16 d) de 5 001 kVA à 10 000 kVA ....................... 1 586 $ plus 19 $ pour chaque tranche de 100 kVA ou partie de tranche de 100 kVA au-delà de 5 001 kVA e) de 10 001 kVA à 20 000 kVA ...................... 2 538 $ plus 13 $ pour chaque tranche de 100 kVA ou partie de tranche de 100 kVA au-delà de 10 001 kVA f) plus de 20 000 kVA .............................. 3 806 $ plus 9 $ pour chaque tranche de 100 kVA ou partie de tranche de 100 kVA au-delà de 20 000 kVA 5. Droit payable pour chaque inspection ultérieure et chaque demande d’inspection de travaux d’électricité......................... 80 $ par demi-heure ou fraction de demi-heure en sus des frais de déplacement et de séjour 6. Droit payable pour l’approbation des plans et spécifications...... 80 $ par demi-heure ou fraction de demi-heure R-034-2026, art. 2. 17 SCHEDULE B (Section 4) ALTERATIONS FOR THE NORTHWEST TERRITORIES TO THE CODE 1. Repealed, R-053-2013,s.4. 2. Repealed, R-053-2013,s.4. R-017-95,s.8; R-038-98,s.11; R-019-2002,s.5; R-045-2006,s.3; R-111-2009,s.9; R-053-2013,s.4. ANNEXE B (article 4) MODIFICATIONS POUR LES TERRITOIRES DU NORD-OUEST AU CODE 1. Abrogé, R-053-2013, art. 4. 2. Abrogé, R-053-2013, art. 4. R-017-95, art. 8; R-038-98, art. 11; R-019-2002, art. 5; R-045-2006, art. 3; R-111-2009, art. 9; R-053-2013, art. 4. 18 SCHEDULE C ANNEXE C (Paragraph 5(a)) (alinéa 5a)) VARIATIONS TO STANDARD MODIFICATION À LA NORME DE ASME A17.1/CSA B44-2019, SAFETY CODE FOR L’AMERICAN SOCIETY OF ELEVATORS AND ESCALATORS MECHANICAL ENGINEERS ET DE L’ASSOCIATION CANADIENNE DE NORMALISATION ASME A17.1-F2019/CSA B44:F19, INTITULÉE CODE DE SÉCURITÉ SUR LES ASCENSEURS OU MONTE-CHARGES ET LES ESCALIERS MÉCANIQUES 1. (1) For the purposes of paragraph 5(a) of these 1. (1) Pour l’application de l’alinéa 5a) du présent regulations, the standard ASME A17.1/CSA règlement, la norme de l’American Society of B44-2019, Safety Code for Elevators and Escalators Mechanical Engineers et de l’Association is adopted with the variations set out in this item. canadienne de normalisation ASME A17.1- F2019/CSA B44:F19, intitulée Code de sécurité sur les ascenseurs ou monte-charges et les escaliers mécaniques, est adoptée avec les modifications prévues au présent numéro. (2) Section 1.1 is varied by (2) L’article 1.1 est modifié par : (a) repealing subparagraph 1.1.2(w) and a) abrogation de l’alinéa 1.1.2w) et par substituting the following: substitution de ce qui suit : (w) devices having a rise of 2,743 mm w) les appareils dont l’élévation ne dépasse (108 in.) or less and used only for the pas 2 743 mm (108 po) et servant transfer of materials or equipment uniquement à transporter des matériaux ou des appareils; (b) repealing subparagraph 1.1.2(x) and b) abrogation de l’alinéa 1.1.2x) et par substituting the following: substitution de ce qui suit : (x) scissor lifts x) les tables élévatrices à ciseaux. (c) repealing subsection 1.1.3 and c) abrogation de l’article 1.1.3 et par substituting the following: substitution de ce qui suit : This Code applies to new installations Ce Code s’applique aux nouvelles only, except Part 1 and Sections 5.10, 8.1, installations seulement, à l’exception de la 8.6 through 8.8, and 8.10 through 8.12, partie 1 et des articles 5.10, which apply to both new and existing 8.1, 8.6 à 8.8, et 8.10 à 8.12, qui visent les installations. installations nouvelles et existantes. R-048-2024,s.11. R-048-2024, art. 11. 19 SCHEDULE D - Repealed, R-048-2024,s.12. ANNEXE D - Abrogée, R-048-2024, art. 12 © 2026 Territorial Printer © 2026 l’imprimeur territorial Yellowknife, N.W.T. Yellowknife (T. N.-O.)2 April 2015 20
Provision text is displayed from LexChat’s stored statute record. Use the official source links to verify amendments, commencement, and current legal force.
Ask AI about this statute
Electrical Protection Regulation 1