Land Use Regulation
This regulation sets permit rules for land use operations in Yukon, including when Class A or B permits are required and what permittees must do during and after work.
AI-assisted research synopsis — verify against the official legal text below.
- Jurisdiction
- Canada — Yukon
- Instrument
- Regulation
- Version
- Undated source snapshot
- Language
- en
- Official source
- View official record ↗
Publicly available, excluded from search-engine indexing
This page remains available for direct access and API use, but this release emits
noindex,follow for the following reason:
- The record does not meet this release's canonical indexing criteria.
(emergency-noindex)
Statute overview
About this statute
This regulation sets permit rules for land use operations in Yukon, including when Class A or B permits are required and what permittees must do during and after work. This provision sets permit duties, engineer and inspector powers, fees, deadlines, and security deposit rules for land use operations.
Search within this statute
Search all stored provisions in this version.
Legal text
Provisions of Land Use Regulation
Showing 2 of 2
Part document.segment-1
Land Use Regulation — segment 1
- document.segment-1 Verify source ↗
Land Use Regulation — segment 1
AI-assisted research summary: This regulation sets permit rules for land use operations in Yukon, including when Class A or B permits are required and what permittees must do during and after work.
TERRITORIAL LANDS (YUKON) ACT LOI DU YUKON SUR LES TERRES TERRITORIALES REGLEMENT SUR L’UTILISATION DES LAND USE REGULATION TERRES O.I.C. 2003/051 DÉCRET 2003/051 Effective Date: Date d'entrée en vigueur : March 25, 2003 25 mars 2003 Land Use Regulation Règlement sur l’utilisation des terres ORDER-IN-COUNCIL DÉCRET EN CONSEIL O.I.C. 2003/051 DÉCRET 2003/051 TERRITORIAL LANDS (YUKON) ACT LOI DU YUKON SUR LES TERRES TERRITORIALES REGLEMENT SUR L’UTILISATION DES LAND USE REGULATION TERRES Pursuant to section 21 of the Territorial Lands (Yukon) Le commissaire en conseil exécutif, conformément à Act, the Commissioner in Executive Council orders as l’article 21 de la Loi du Yukon sur les terres follows territoriales, décrète : 1. The annexed Land Use Regulation is hereby made. 1. Est établi le Règlement sur l’utilisation des terres paraissant en annexe. 2. This Order comes into force April 1, 2003. 2. Le présent décret entre en vigueur le 1er avril 2003. Dated at Whitehorse, in the Yukon Territory, this 25th Fait à Whitehorse, dans le territoire du Yukon, le 25 day of March, 2003. mars 2003. Commissioner of the Yukon/Commissaire du Yukon Page ii YUKON REGULATIONS RÈGLEMENTS DU YUKON c Land Use Regulation Règlement sur l’utilisation des terres TABLE OF CONTENTS TABLE DES MATIÈRES BSTHIELCILOR T NNT A Y BODL -. SF E3O EO3SU F SR IC TOO HNN L TOE EFG N ITT SHS LEA ( T T I A V B E L A E S D S E E S M M B A LY TI ÈRES) PDTRREUEONXJEITTÈEM -DQEEU SLAEOTSIRS NIIȺOM3NE3 D AES LSAEM BLÉE LÉGISLATIVE RÈGLEMENT SUR L’UTILISATION DES LAND USE REGULATION TERRES TABLE OF CONTENTS TABLE DES MATIÈRES Section Page Article Page Definitions ............................................................................ 1 Interprétation ....................................................................... 1 Establishment of land management zones ............................ 2 Constitution de zones de gestion des terres ........................... 2 Designation of engineers ...................................................... 3 Nomination des ingénieurs .................................................... 3 Designation of inspectors ...................................................... 3 Nomination des inspecteurs .................................................. 3 Exemption from regulation ................................................... 3 Portée du règlement .............................................................. 3 Prohibitions .......................................................................... 3 Interdiction ........................................................................... 3 Small fuel caches .................................................................. 5 Cache de combustible de faible capacité ................................ 5 Excavation ............................................................................ 6 Excavation ............................................................................. 6 Water crossings .................................................................... 6 Passages d’eau ...................................................................... 6 Clearing of lines, trails or rights-of-way ................................ 6 Essartage de lignes de levé, de sentiers et de servitudes Monuments ........................................................................... 7 de passage .............................................................. 6 Archaeological sites .............................................................. 7 Bornes-signaux ..................................................................... 7 Campsites ............................................................................. 8 Gisements archéologiques ..................................................... 7 Restoration of permit area .................................................... 8 Campements ......................................................................... 8 Removal of buildings and equipment .................................... 8 Remise en état de la zone visée par un permis ...................... 8 Emergencies ......................................................................... 9 Enlèvement des bâtiments et de l’équipement ....................... 8 Eligibility for a permit ........................................................... 9 Urgences ............................................................................... 9 Application for a permit ........................................................ 9 Admissibilité ......................................................................... 9 Display of permit ................................................................ 12 Demande de permis .............................................................. 9 Terms and conditions of permits ........................................ 13 Affichage du permis ............................................................ 12 Reports □ ........................................................................... 14 Conditions des permis ......................................................... 13 Final plan ............................................................................ 14 Rapports □ ................................................................... 14 Determination of land use fee ............................................. 15 Plan définitif ........................................................................ 14 Land division and plans ...................................................... 16 Établissement du droit d’utilisation des terres ..................... 15 Security deposit .................................................................. 16 Division des terres et plans ................................................. 16 Letter of clearance .............................................................. 17 Dépôt de garantie ............................................................... 16 Duties and powers of inspectors ......................................... 17 Lettre d’acquittement .......................................................... 17 Suspension of a land use operation ..................................... 18 Fonctions et pouvoirs de l’inspecteur ................................... 17 Cancellation of permit ......................................................... 19 Suspension de l’exploitation des terres ................................ 18 Discontinuance of a land use operation ............................... 19 Annulation du permis .......................................................... 19 Assignment ......................................................................... 20 Cessation d’un travail d’utilisation des terres ....................... 19 Appeals □ ........................................................................... 20 Cession □ ........................................................................... 20 c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page iii Land Use Regulation Règlement sur l’utilisation des terres TABLE OF CONTENTS TABLE DES MATIÈRES Notice □ ........................................................................... 20 Appels □ ............................................................................20 Fees □ ........................................................................... 21 Avis □ ............................................................................20 Droits □ ............................................................................21 SCHEDULE 1 SCHEDULE 2 ANNEXE 1 ANNEXE 2 Page iv YUKON REGULATIONS RÈGLEMENTS DU YUKON c Land Use Regulation Règlement sur l’utilisation des terres Section 1. Article 1. OTE.IR.CR.I 2T0O0R3IA/0L5 L1A NDS (YUKON) ACT DLOÉIC RDEUT Y 2U0K0O3N/0 S5U1R LES TERRES TERRITORIALES RÈGLEMENT SUR L’UTILISATION DES LAND USE REGULATION TERRES Definitions Interprétation 1. In this Regulation, 1. Les définitions qui suivent s’appliquent au présent règlement. “Chief Operations Officer” means the Chief Operations « arpenteur en chef » L’arpenteur en chef selon la Officer appointed under the Oil and Gas Act; définition de la Loi sur l’arpentage des terres du Canada (Canada). “Surveyor General” “Class A Permit” means a permit issued pursuant to section 24; « permis de catégorie A » « borne-signal » Comprend un poteau, un jalon, une jalonnette, un monticule, une fosse, une tranchée, ou “Class B Permit” means a permit issued pursuant to tout autre objet, chose ou moyen utilisé pour marquer section 26; « permis de catégorie B » officiellement la limite d’une terre arpentée ou placée “crossing” means any bridge, causeway, or structure ou établie à des fins topographiques, géodésiques ou or any embankment, cutting, excavation, land clearing, cadastrales. “monument” or other works used or intended to be used to enable « cours d’eau » Comprend un lac, une rivière, un persons, vehicles or machinery to cross any stream, étang, un marais, un marécage, un canal, un ruisseau, highway or road; « passage » un ravin ou un couloir au fond duquel coule de l’eau “Dominion Geodesist” means the Dominion Geodesist continûment ou par intermittence. “stream” and Director of the Geodetic Survey, in the Department « date de renvoi de l’équipe » La date à laquelle, de of Energy, Mines and Resources; « géodésien fédéral » l’avis de l’ingénieur de district pour la conservation du “engineer” means, with respect to particular lands, the pétrole et du gaz, un puits foré dans le but de engineer designated by the Minister pursuant to découvrir ou de produire du pétrole ou du gaz a été section 3 to serve the area in which the lands are dûment terminé. “rig release date” located; « ingénieur » « délégué aux opérations » S’entend du délégué aux “geophysical survey” means any investigation carried opérations nommé en application de la Loi sur le out on the surface of the ground to determine the pétrole et le gaz. “Chief Operations Officer” nature and structure of the subsurface; « levé « détenteur de permis » Un détenteur de permis se géophysique » livrant à une exploitation des terres et toute personne “inspector” means an inspector designated by the employée à cette fin. “permittee” Minister pursuant to section 4; « inspecteur » « exploitation des terres » Un travail ou une activité “land use operation” means any work or undertaking exercée sur des terres territoriales et exigeant un on territorial lands that requires a permit; permis. “land use operation” « exploitation des terres » « forage dans le roc » Une excavation faite dans un c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 1 Land Use Regulation Règlement sur l’utilisation des terres Section 2. Article 2. “letter of clearance” means a letter issued by the claim minier pour obtenir des renseignements d’ordre engineer pursuant to section 36; « lettre géologique. “rock trenching” d’acquittement » « géodésien fédéral » Le géodésien fédéral et le “line” means a route used to give surface access to any directeur du Service géodésique du ministère de land for the purpose of carrying out a geophysical, l’Énergie, des Mines et des Ressources; “Dominion geological, or engineering survey; « ligne de levé » Geodesist” “monument” means any post, stake, peg, mound, pit, « ingénieur » Pour des terres données, l’ingénieur trench, or any other object, thing, or device used to désigné par le ministre conformément à l’article 3 pour officially mark the boundary of any surveyed lands, or desservir la région où les terres sont situées. placed or established for any topographic, geodetic, or “engineer” cadastral purpose; « borne-signal » « inspecteur » Un inspecteur nommé par le ministre “permit” means a Class A Permit or a Class B Permit; selon l’article 4. “inspector” « permis » « jour-personne » Dans le cas de l’utilisation d’un campement, l’utilisation de ce campement par une “permittee” means the holder of a permit and includes personne durant 24 heures. “person-day” a person engaged in a land use operation or anyone employed by a permittee to conduct a land use « lettre d’acquittement » Une lettre délivrée par operation; l’ingénieur selon l’article 36. “letter of clearance” « détenteur de permis » « levé géophysique » Une recherche effectuée à la surface du sol pour déterminer la nature et la structure “person-day”, with respect to the use of a campsite, sous-jacentes. “geophysical survey” means the use of that campsite by one person for 24 hours; « jour-personne » « ligne de levé » Une route d’accès à un terrain, utilisée pour l’exécution de levés géophysiques, “rig release date” means thedate on which, in the géologiques ou de génie civil. “line” opinion of a district oil and gas conservation engineer, a well drilled for the purpose of discovering or « passage » Comprend un pont, une chaussée, une producing oil and gas has been properly terminated; structure, une digue, une tranchée, une excavation, un « date de renvoi de l’équipe » espace libre ou autres travaux permettant ou destinés à permettre à des personnes, véhicules ou machines de “rock trenching” means any excavation carried out on franchir un cours d’eau, un chemin ou une route. a mineral claim for the purpose of obtaining geological “crossing” information; « forage dans le roc » « percée » La première pénétration du sol pour le “spud-in” means the initial penetration of the ground forage d’un puits de pétrole ou de gaz. “spud-in” for the purpose of drilling an oil or gas well; « percée » « permis » Un permis de catégorie A ou B. “permit” “stream” means any lake, river, pond, swamp, marsh, channel, gully, coulee or draw that continuously or « permis de catégorie A » Un permis délivré selon intermittently contains water; « cours d’eau » l’article 24. “Class A Permit” “Surveyor General” means the Surveyor General as « permis de catégorie B » Un permis délivré selon defined in the Canada Lands Surveys Act (Canada); l’article 26. “Class B Permit” « arpenteur en chef » Establishment of land management zones Constitution de zones de gestion des terres 2. The Yukon is hereby designated as a land 2. Le Yukon est déclaré zone de gestion des terres aux management zone for the purposes of this Regulation. fins du présent règlement. Page 2 YUKON REGULATIONS RÈGLEMENTS DU YUKON c Land Use Regulation Règlement sur l’utilisation des terres Section 3. Article 3. Designation of engineers Nomination des ingénieurs 3. The Minister may designate any public officer as an 3. Le ministre peut désigner des fonctionnaires pour engineer for the purposes of this Regulation. agir comme ingénieurs aux fins du présent règlement. Designation of inspectors Nomination des inspecteurs 4. The Minister may designate any person as an 4. Le ministre peut désigner toute personne pour agir inspector for the purposes of this Regulation. comme inspecteur aux fins du présent règlement. Exemption from regulation Portée du règlement 5.(1) This Regulation does not apply to 5.(1) Le présent règlement ne s’applique pas : (a) anything done by a resident of the Yukon in the a) aux activités de chasse, de pêche et de trappe normal course of hunting, fishing or trapping; exercées par un résident du Yukon; (b) anything done in the course of prospecting, b) aux activités de prospection, de jalonnage ou staking, or locating a mineral claim unless it de localisation d’un claim minier, à moins requires a use of equipment or material that qu’elles ne requièrent l’utilisation d’équipement normally requires a permit; ou de matériaux nécessitant un permis; (c) lands whose surface rights have all been c) aux terres dont tous les droits de surface ont disposed of by the Minister; été cédés par le ministre; (d) a timber cutting operation conducted pursuant d) aux travaux de coupe de bois effectués to paragraph 13(a) or (b) of the Timber conformément aux alinéas 13a) ou b) du Regulation; and Règlement sur le bois; (e) a timber cutting operation conducted under e) aux travaux de coupe de bois effectués en vertu authority of a permit issued under section 6 of d’un permis délivré conformément aux the Timber Regulation. articles 4 ou 6 du Règlement sur le bois. (f) a highway within the meaning of the Highways f) une route au sens de la Loi sur la voirie. Act. (Paragraph 5(1)(f) added by O.I.C. 2019/90) (Alinéa 5(1)f) ajouté par Décret 2019/90) (g) activities authorized by a permit under the g) aux activités autorisées par un permis en vertu Resource Road Regulation. du Règlement sur les chemins d'accès aux ressources. [Paragraph 5(1)(g) added by O.I.C. 2024/187] [Alinéa 5(1)g) ajouté par Décret 2024/187] (2) If there is a conflict between a provision of this (2) Les dispositions de la Loi sur le pétrole et le gaz ou Regulation and a provision of the Oil and Gas Act or a de l’un de ses règlements l’emportent sur les regulation under it, then the provision of the Oil and dispositions du présent règlement qui s’avèreraient Gas Act or the regulation under it governs. incompatibles. 6. No person shall engage in a land use operation 6. Nul ne peut entreprendre l’exploitation des terres à except in accordance with this Regulation and the moins de se conformer au présent règlement, à la Loi Waters Act and regulations made under it. sur les eaux et au règlement établi selon cette loi. Prohibitions Interdiction 7. No person shall, without a Class A Permit, carry on 7. Nul ne peut entreprendre sur des terres any work or undertaking on territorial lands that territoriales, sans un permis de catégorie A, un travail involves ou une activité impliquant : c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 3 Land Use Regulation Règlement sur l’utilisation des terres Section 8. Article 8. (a) the use, in any 30-day period, of more a) l’utilisation, au cours d’une période de 30 jours, de plus de 150 kg d’explosifs; than 150 kg of explosives; (b) the use of any vehicle that exceeds 10 t net b) l’utilisation, d’un véhicule de plus de dix tonnes, vehicle weight, except on a public road or trail sauf sur une voie publique ou un sentier that the Minister responsible for the Highways entretenu par le ministre responsable de la Loi Act has a duty to maintain; sur la voirie; (c) the use of any power driven machinery for c) l’utilisation d’une machine de forage motorisée earth drilling purposes whose operating weight, dont le poids durant les travaux est supérieur à excluding the weight of drill rods or stems, bits, 2,5 t, non compris le poids des tiges de forage pumps, and other ancillary equipment, ou des maîtresses-tiges, des trépans, des exceeds 2.5 t; pompes et autres accessoires; (d) the establishment of any campsite that is to be d) l’installation d’un campement destiné à used for more than 400 person-days; l’utilisation pour plus de 400 jours-personnes; (e) the establishment of any petroleum fuel storage e) aux fins d’entreposage du combustible, la facility exceeding 80,000 l capacity or the use création d’installations ayant une capacité of a single container for the storage of supérieure à 80 000 l ou l’utilisation d’un seul petroleum fuel that has a capacity exceeding réservoir ayant une capacité supérieure à 4 000 4,000 l; l; (f) the use of any self-propelled power driven f) l’utilisation, pour le terrassement et l’essartage, machine for moving earth or clearing land of d’une machine motorisée autoguidée; vegetation; (g) the use of any stationary power driven machine g) l’utilisation d’une machine fixe motorisée, autre for hydraulic prospecting, moving earth or qu’une scie mécanique, pour la prospection clearing land, other than a power saw; or hydraulique, le terrassement et l’essartage; (h) the levelling, grading, clearing, cutting, or h) le nivelage, le terrassement, l’essartage, snowploughing of any line, trail, or right-of- l’excavation ou le déblaiement de neige d’une way exceeding 1.5 m in width and exceeding 4 ligne de levé, d’un sentier ou d’une servitude de ha in area. passage d’une largeur de plus 1,5 mètre et d’une superficie de plus de quatre hectares. 8. No person shall, without a Class B Permit, carry on 8. Nul ne peut entreprendre sur des terres any work or undertaking on territorial lands that territoriales, sans un permis de catégorie B, un travail involves ou une activité impliquant : (a) the use, in any 30-day period, of more than 50 a) l’utilisation, au cours d’une période kg but less than 150 kg of explosives; de 30 jours, de plus de 50 kg d’explosifs, sans dépasser 150 kg; (b) the use, except on a public road or trail that the b) l’utilisation d’un véhicule de plus de cinq tonnes Minister responsible for the Highways Act has a mais de moins de dix tonnes, ou l’utilisation duty to maintain,, of any vehicle that is more d’un véhicule exerçant sur le sol une pression than 5 t but less than 10 t net vehicle weight, supérieure à 35 kPa, sauf sur une voie publique or the use of any vehicle of any weight that ou un sentier entretenu par le ministre exerts pressure on the ground in excess of 35 k responsable de la Loi sur la voirie, pa; (c) the use of any power driven machinery for c) l’utilisation d’une machine motorisée de forage earth drilling purposes whose operating weight, dont le poids durant les travaux est supérieur à excluding the weight of drill rods or stems and 500 kg, mais inférieur à 2,5 t, non compris le bits, pumps, and other ancillary equipment, is poids des tiges de forage ou des maîtresses- Page 4 YUKON REGULATIONS RÈGLEMENTS DU YUKON c Land Use Regulation Règlement sur l’utilisation des terres Section 9 Article 9 more than 500 kg but less than 2.5 t; tiges, des trépans, des pompes et autres accessoires; (d) the establishment of any campsite that is to be d) l’installation d’un campement destiné à used by more than two people for more l’utilisation de plus de deux personnes pour than 100 but less than 400 person-days; plus de 100 jours-personnes mais moins de 400 jours-personnes; (e) the establishment of any petroleum fuel storage e) aux fins d’entreposage du combustible, la facility that has a capacity of more than 4,000 l création d’installations d’une capacité but less than 80,000 l or the use of a single supérieure à 4 000 l mais inférieure à 80 000 l container for the storage of petroleum fuel that ou l’utilisation d’un seul réservoir d’une has a capacity of more than 2,000 l but less capacité supérieure à 2 000 l mais inférieure à than 4,000 l; or 4 000; (f) the levelling, grading, clearing, cutting, or snow f) le nivelage, le terrassement, l’essartage, ploughing of any line, trail, or right-of-way l’excavation ou le déblaiement de neige d’une exceeding 1.5 m in width but not exceeding 4 ligne de levé, d’un sentier ou d’une servitude de ha in area. passage d’une largeur de plus de 1,5 mètre et d’une superficie n’excédant pas quatre hectares. 9 No permittee shall, unless expressly authorized in 9 Sauf autorisation explicite du permis ou autorisation their permit or expressly authorized in writing by an explicite écrite d’un inspecteur, un détenteur de permis inspector, ne peut : (a) conduct a land use operation within 30 m of a a) conduire une exploitation des terres à moins known monument or a known or suspected de 30 m d’une borne-signal connue, d’un archaeological site or burial ground; gisement archéologique ou d’un cimetière connu ou présumé; (b) when excavating territorial land within 100 m b) à moins de cent mètres d’un cours d’eau, sur of any stream, excavate at a point that is below des terres territoriales, faire des travaux the normal high water mark of that stream; d’excavation au-dessous du niveau normal de ses hautes eaux; (c) deposit on the bed of any stream any c) déverser des déblais dans le lit d’un cours excavated material; or d’eau; (d) when placing a fuel or supply cache within 100 d) déposer du combustible ou des fournitures m of any stream, place the fuel or supply cache dans une cache au-dessous du niveau normal below the normal high water mark of that des hautes eaux d’un cours d’eau lorsque la stream. cache est à moins de cent mètres de ce cours d’eau. Small fuel caches Cache de combustible de faible capacité 10. Every person who establishes a fuel cache of more 10. Une personne qui installe sur des terres than 400 l and less than 4,000 l on territorial land for territoriales une cache de combustible dont la capacité which a permit is not required shall, within 30 days of est supérieure à 400 l, mais inférieure à 4 000 l, et establishing it , notify the engineer in writing, giving pour laquelle un permis n’est pas exigé en avise par details of the cache including the amount and type of écrit l’ingénieur dans les 30 jours, lui donnant les fuel, size of containers, and method of storage and détails de la cache, y compris la quantité et le genre de proposed date of removal of the cache. combustible, la dimension des réservoirs, la méthode d’entreposage et la date prévue de l’enlèvement de la cache. c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 5 Land Use Regulation Règlement sur l’utilisation des terres Section 11. Article 11. Excavation Excavation 11. Subject to the terms and conditions of their permit 11. Sous réserve de son permis ou de l’autorisation or the express written authority of an inspector, every explicite écrite d’un inspecteur, un détenteur de permis permittee shall replace all materials that they remove procédant à une excavation, autre qu’un forage dans le in the course of excavating, other than rock trenching, roc, comble l’excavation avec les déblais qu’il veille à and shall level and compact the area of the excavation. niveler et à tasser. Water crossings Passages d’eau 12.(1) Subject to the terms and conditions of their 12.(1) Sous réserve de son permis ou de l’autorisation permit or the express written authority of an inspector, explicite écrite d’un inspecteur, avant l’achèvement de every permittee shall l’exploitation des terres ou avant le début de la débâcle printanière si cet événement se produit le premier, un détenteur de permis : (a) remove any material or debris deposited in any a) enlève les matériaux ou débris déposés dans un stream in the course of a land use operation, cours d’eau lors de l’exploitation des terres, whether for the purpose of constructing a que ce soit pour la construction d’un passage crossing or otherwise, and ou autre; (b) restore the channel and bed of the stream to b) replace le lit du cours d’eau dans son their original alignment and cross-section, alignement et sa coupe transversale d’origine. prior to the completion of the land use operation or prior to the commencement of spring break-up, whichever occurs first. (2) Subsection (1) shall not be deemed to permit any (2) Le paragraphe (1) n’est pas réputé autoriser person to deposit any material or debris in a stream quiconque à déposer des matériaux ou des débris dans contrary to the Waters Act or the Fisheries Act (Canada) un cours d’eau, en contravention de la Loi sur les eaux, or any regulations made under those Acts. de la Loi sur les pêches (Canada) ou de leurs règlements respectifs. Clearing of lines, trails or rights-of-way Essartage de lignes de levé, de sentiers et de servitudes de passage 13.(1) Unless expressly authorized in a permit, no 13.(1) Sauf autorisation explicite de son permis, un permittee shall détenteur de permis ne peut : (a) clear a new line, trail, or right-of-way where a) essarter une ligne de levé, un sentier ou une there is an existing line, trail, or right-of-way servitude de passage, s’il en est de praticables; that they can use; (b) clear a line, trail, or right-of-way wider than 10 b) essarter une ligne de levé, un sentier ou une m; or servitude de passage d’une largeur supérieure à dix mètres; (c) while clearing a line, trail or right-of-way, leave c) laisser des débris ou des arbres inclinés parmi leaners or debris in standing timber. du bois sur pied, au cours de l’essartage d’une ligne de levé, d’un sentier ou d’une servitude de passage. Page 6 YUKON REGULATIONS RÈGLEMENTS DU YUKON c Land Use Regulation Règlement sur l’utilisation des terres Section 14. Article 14. (2) Where, in the opinion of an inspector, serious (2) Lorsqu’un inspecteur est d’avis que l’exploitation erosion may result from a land use operation, the des terres pourrait causer une grave érosion, il peut permittee shall adopt such measures to control erosion imposer au détenteur de permis les mesures as may be required by the inspector. préventives adéquates. Monuments Bornes-signaux 14.(1) Where a boundary monument is damaged, 14.(1) Si, au cours de l’exploitation des terres, le destroyed, moved, or altered in the course of a land détenteur de permis endommage, détruit, déplace ou use operation, the permittee shall modifie une borne-signal de limite, il devra : (a) report the fact immediately to the Surveyor a) soit en informer immédiatement l’arpenteur en General and pay to the Surveyor General the chef et lui paie les frais : costs of (i) investigating such damage, destruction, (i) d’enquête sur les dommages, la destruction, movement or alteration, and le déplacement ou la modification, (ii) restoring or re-establishing the monument (ii) de remise de la borne-signal dans son état to its original condition or its original place; ou à son lieu d’origine; or (b) with the prior written consent of the Surveyor b) soit faire remettre la borne-signal dans son General, cause the monument to be restored or état ou à son lieu d’origine, à ses frais, avec le re-established at the permittee’s own expense. consentement préalable et écrit de l’arpenteur en chef. (2) Where a topographic or geodetic monument is (2) Si, au cours de l’exploitation des terres, le damaged, destroyed or altered in the course of a land détenteur de permis endommage, détruit, déplace ou use operation, the permittee shall modifie une borne-signal topographique ou géodésique , il devra (a) report the fact immediately to the Dominion a) soit en informer immédiatement le géodésien Geodesist, and pay to the Dominion Geodesist fédéral et lui payer les frais visés aux sous- the costs described in subparagraphs (1)(a)(i) alinéas (1)a)(i) et (ii); and (ii); or (b) with the prior written consent of the Dominion b) soit faire remettre la borne-signal dans son Geodesist, cause the monument to be restored état ou à son lieu d’origine, à ses frais, avec le or re-established at the permittee’s own consentement préalable et écrit du géodésien expense. fédéral. (3) The restoration or re-establishment of a monument (3) La remise en état ou la remise en place d’une pursuant to subsection (1) or (2) shall be carried out in borne-signal, selon les paragraphes (1) et (2), est accordance with instructions from the Surveyor General exécutée selon les directives de l’arpenteur en chef ou or Dominion Geodesist, as the case may be. du géodésien fédéral, selon le cas. Archaeological sites Gisements archéologiques 15. Where, in the course of a land use operation, a 15. Lorsqu’au cours d’une exploitation des terres les suspected archaeological site or burial ground is travaux d’excavation font présumer l’existence d’un unearthed or otherwise discovered, the permittee shall gisement archéologique ou d’un cimetière, le détenteur immediately de permis : (a) suspend the land use operation on the site; and a) cesse l’exploitation des terres à cet endroit; c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 7 Land Use Regulation Règlement sur l’utilisation des terres Section 16. Article 16. (b) notify the engineer or an inspector of the b) avise l’ingénieur, ou un inspecteur, de location of the site and the nature of any l’emplacement du gisement et de la nature des unearthed materials, structures, or artifacts. matériaux, constructions ou objets exhumés. Campsites Campements 16.(1) Subject to the terms and conditions of their 16.(1) Sous réserve de son permis, un détenteur de permit, every permittee shall dispose of all garbage, permis qui a utilisé un campement pour une waste, and debris from any campsite used in exploitation des terres doit faire disparaître tous les connection with a land use operation by removal, déchets, rebuts et débris en les enlevant, en les burning, or burial or by such other method as may be brûlant, en les enterrant ou selon la méthode que peut directed by an inspector. imposer l’inspecteur. (2) Sanitary sewage produced in connection with land (2) Les eaux-vannes résultant de l’exploitation des use operations shall be disposed of in accordance with terres sont évacuées selon la Loi sur la santé et la the Public Health and Safety Act and any regulations sécurité publiques et ses règlements. made under it. Restoration of permit area Remise en état de la zone visée par un permis 17. Subject to the terms and conditions of their 17. À la fin de l’exploitation des terres, et sous réserve permit, every permittee shall, after completion of a de son permis, un détenteur de permis remet, autant land use operation, restore the permit area as nearly que possible, la zone concernée dans son état initial. as possible to the same condition as it was prior to the commencement of the land use operation. Removal of buildings and equipment Enlèvement des bâtiments et de l’équipement 18.(1) Subject to subsections (2) and (3), every 18.(1) Sous réserve des paragraphes (2) et (3), un permittee shall, on completion of a land use operation, détenteur de permis enlève les bâtiments, la remove all buildings, machinery, equipment, materials, machinerie, les matériaux et les barils de combustible and fuel drums or other storage containers used in ou autres réservoirs d’entreposage utilisés pour connection with the land use operation. l’exploitation, à la fin de l’exploitation des terres. (2) A permittee may, with the prior written approval of (2) Un détenteur de permis peut laisser sur des terres the engineer, leave on territorial lands such buildings, territoriales les bâtiments, l’équipement, la machinerie equipment, machinery, and materials as the permittee et les matériaux qu’il juge indispensables pour une deems may be required for future land use operations exploitation ultérieure des terres de la zone, avec or other operations in the area, but any equipment, l’autorisation préalable et écrite de l’ingénieur; dès machinery or materials so left shall be stored in a lors, l’équipement, la machinerie et les matériaux ainsi manner, at a location, and for a duration approved by laissés sont entreposés de la façon, à l’endroit et pour the engineer. la durée qu’impose l’ingénieur. (3) Subject to any applicable mining legislation, a (3) Sous réserve de toute législation minière permittee may, without the prior approval of the applicable, un détenteur de permis peut laisser les engineer, leave diamond drill cores at a drill site on carottes de foreuse à diamants dans une zone de territorial lands. forage des terres territoriales sans l’approbation préalable de l’ingénieur. Page 8 YUKON REGULATIONS RÈGLEMENTS DU YUKON c Land Use Regulation Règlement sur l’utilisation des terres Section 19. Article 19. Emergencies Urgences 19. Any person may, in an emergency that threatens 19. Une personne peut, lors d’une urgence qui menace life, property, or natural environment, carry out such la vie, les biens ou l’environnement naturel, prendre les operation as they deem necessary to cope with the mesures qu’elle juge indispensables pour y faire face, emergency, whether or not the operation is carried out que ces mesures soient conformes ou non à ce in accordance with this Regulation or any permit that règlement ou au permis détenu, et elle expédie sans they may have and they shall immediately thereafter délai à l’ingénieur un rapport écrit précisant la durée, send a written report to the engineer describing the la nature et l’étendue des mesures prises. duration, nature, and extent of the operation. Eligibility for a permit Admissibilité 20. In order to be eligible for a permit, a person shall 20. Pour être admissible à un permis, une personne doit être : (a) where a right to search for, win, or exploit a) lorsque l’exploitation des terres autorisée par le minerals or natural resources is to be exercised permis a pour objet le droit de prospection, by the carrying out of the land use operation d’extraction ou d’exploitation de minéraux ou authorized by the permit, be de ressources naturelles : (i) the holder of that right, (i) soit le titulaire de ce droit, (ii) the manager of operations, where there is (ii) soit, s’il existe plusieurs titulaires et qu’ils more than one holder of that right and such ont conclu une convention d’exploration ou holders have entered into an exploration or d’exploitation désignant l’un d’eux comme operating agreement designating one of directeur des travaux, ce directeur, them as manager of operations, or (iii) the person who contracts to have the land (iii) soit, s’il existe plusieurs titulaires et qu’ils use operations carried out, where there is n’ont pas conclu une telle convention, celui more than one holder of that right and they qui s’engage à faire exécuter l’exploitation have not entered into an exploration or des terres; operating agreement designating one of them as manager of operations; (b) where no right to search for, win, or exploit b) soit, lorsque l’exploitation des terres autorisée minerals or natural resources is to be exercised par le permis n’a pas pour objet le droit de by the carrying out of the land use operation prospection, d’extraction ou d’exploitation des authorized by the permit, be the person who minéraux ou des ressources naturelles, celui contracts to have the land use operation qui s’engage à faire exécuter l’exploitation des carried out; or terres; (c) in any case not provided for in paragraph (a) or c) soit, dans tous les autres cas, celui qui doit (b), be the person who is to carry out the land exécuter l’exploitation des terres. use operation. Application for a permit Demande de permis 21.(1) Any person who, in accordance with section 20, 21.(1) Une personne admissible à un permis selon is eligible for a permit may submit to the engineer, in l’article 20 peut présenter, en double exemplaire, à duplicate, an application for a permit in a form l’ingénieur une demande de permis sous la forme approved by the Minister. autorisée par le ministre. c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 9 Land Use Regulation Règlement sur l’utilisation des terres Section 22. Article 22. (2) Every permit application submitted pursuant to (2) La demande de permis présentée selon le subsection (1) shall be accompanied by the application paragraphe (1) est accompagnée du droit pour services fee set out in Schedule 1, the land use fee set out in rendus applicable, selon l’annexe 1, du droit Schedule 2 and a preliminary plan showing d’utilisation applicable, selon l’annexe 2 et d’un plan provisoire indiquant : [Subsection 21(2) amended by O.I.C. 2005/38] [Paragraphe 21(2) modifié par décret 2005/38] [Subsection 21(2) amended by O.I.C. 2006/124] [Paragraphe 21(2) modifié par décret 2006/124] (a) the lands proposed to be used and an estimate a) les terres que le requérant se propose d’utiliser of their area; and et leur superficie estimative; (b) the approximate location of all b) l’emplacement approximatif : (i) existing lines, trails, rights-of-way, and (i) des lignes de levé, sentiers, servitudes de cleared areas proposed to be used in the passage et zones essartées en existence que land use operation, le requérant se propose d’utiliser lors de l’exploitation des terres, (ii) new lines, trails, rights-of-way, and cleared (ii) des nouvelles lignes de levé, nouveaux areas proposed to be used in the land use sentiers, nouvelles servitudes de passage et operation, nouvelles zones essartées que le requérant se propose d’utiliser lors de l’exploitation des terres, (iii) buildings, campsites, air landing strips, air (iii) des bâtiments, campements, pistes navigation aids, fuel and supply storage d’atterrissage, aides à la navigation sites, waste disposal sites, excavations, and aérienne, endroits d’entreposage des other works and places proposed to be combustibles et fournitures, dépotoirs, constructed or used during the land use excavations et autres travaux et endroits que operation, and le requérant se propose d’aménager ou d’utiliser lors de l’exploitation des terres, (iv) bridges, dams, ditches, railroads, highways (iv) des ponts, barrages, fossés, voies ferrées, and roads, transmission lines, pipelines, routes, chemins, lignes de transmission, survey lines and monuments, air landing pipe-lines, lignes de levé et bornes-signaux, strips, streams, and all other features, pistes d’atterrissage, cours d’eau et autres structures or works that, in the opinion of éléments, structures ou travaux pouvant, de the applicant, may be affected by the land l’avis du requérant, être affectés par use operation. l’exploitation des terres. (3) For the purpose of calculating the land use fee (3) Aux fins du calcul du droit d’utilisation, la largeur payable where territorial lands are proposed to be used des lignes de levé, des sentiers ou des servitudes de for a line, trail or right-of-way, the width of the line, passage devant être aménagés à même des terres trail or right-of-way shall, unless otherwise specified by territoriales est censée être de dix mètres, sauf avis the engineer in the permit, be deemed to be 10 m. contraire de l’ingénieur mentionné dans le permis. (4) (4) [Subsection 21(4) added by O.I.C. 2005/38] [Paragraphe 21(4) ajouté par décret 2005/38] [Subsection 21(4) revoked by O.I.C. 2006/124] [Paragraphe 21(4) abrogé par décret 2006/124] 22.(1) The engineer may, before issuing a permit, 22.(1) Avant de délivrer un permis, l’ingénieur peut : (a) order an inspection of the lands proposed to be a) ordonner une inspection des terres que le used thereunder; and requérant se propose d’utiliser; Page 10 YUKON REGULATIONS RÈGLEMENTS DU YUKON c Land Use Regulation Règlement sur l’utilisation des terres Section 23. Article 23. (b) require an applicant for a permit to provide the b) exiger du requérant qu’il lui fournisse des engineer with such information and data renseignements et des données sur l’utilisation concerning the proposed use of the lands and projetée de terres et sur leurs caractéristiques the physical and biological characteristics of the physiques et biologiques, de façon à lui lands as will enable the engineer to evaluate permettre de prédire les effets qualitatifs et any quantitative and qualitative effects of the quantitatifs de leur exploitation. proposed land use operation. (2) Where an inspector makes an inspection pursuant (2) L’inspecteur qui fait une inspection sur ordre de to an order of the engineer under paragraph (1)(a), the l’ingénieur selon l’alinéa (1)a) informe celui-ci des inspector shall investigate and report to the engineer résultats de son enquête sur : particulars of (a) the existing biological and physical a) les caractéristiques physiques et biologiques characteristics of the lands proposed to be used existantes des terres dont l’utilisation est and the surrounding lands; projetée et des terres adjacentes; (b) any disturbance that the proposed land use b) la perturbation que l’exploitation envisagée des operation may cause on the lands proposed to terres peut causer à ces terres et aux terres be used and the surrounding lands and the adjacentes, ainsi que les caractéristiques biological characteristics of the lands; and biologiques de cette perturbation; (c) the manner in which the disturbance referred c) la façon dont la perturbation peut être réduite to in paragraph (b) may be minimized and et contrôlée. controlled. (3) The engineer may, where he or she deems it (3) Lorsqu’il le juge nécessaire, ou à la demande du necessary or when requested to do so by an applicant, requérant, l’ingénieur peut aviser ce dernier du inform the applicant of the nature of an inspector’s contenu du rapport de l’inspecteur visé au report referred to in subsection (2). paragraphe (2). 23. Where the engineer receives an application for a 23. Dans les dix jours de la réception d’une demande Class A Permit that is not made in accordance with this de permis de catégorie A qui n’est pas conforme au Regulation, the engineer shall, within 10 days after présent règlement, l’ingénieur donne au requérant un receiving it, notify the applicant in writing that their avis écrit et motivé du rejet de sa demande. application cannot be accepted and give the reasons why. 24.(1) The engineer shall, within 10 days after receipt 24.(1) Dans les dix jours de la réception d’une of an application for a Class A Permit made in demande de permis de catégorie A conforme à ce accordance with this Regulation, règlement, l’ingénieur : (a) issue a Class A Permit subject to any terms and a) soit délivre le permis sous réserve des conditions he or she may include therein conditions qu’il peut y énoncer, selon le pursuant to subsection 30(1); paragraphe 30(1); (b) notify the applicant that further time is b) soit donne au requérant un avis motivé du délai required to issue a permit and give the reasons supplémentaire requis pour sa délivrance; for the further time; (c) notify the applicant in writing that the engineer c) soit donne au requérant un avis écrit et motivé has ordered further studies or investigations to à l’effet qu’il a ordonné des études ou des be made respecting the lands proposed to be enquêtes supplémentaires sur les terres dont used and state the reasons therefor; or l’utilisation est envisagée; c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 11 Land Use Regulation Règlement sur l’utilisation des terres Section 25. Article 25. (d) refuse to issue a permit and notify the d) soit donne au requérant un avis écrit et motivé applicant in writing of the refusal and the du rejet de la demande de permis. reasons for it. (2) Where the engineer has notified an applicant that (2) Après avoir avisé le requérant du délai further time is required to issue a permit pursuant to supplémentaire requis pour la délivrance du permis, paragraph (1)(b), the engineer shall, within 42 days selon l’alinéa (1)b), l’ingénieur se conforme aux after the date of receipt of the application, comply with alinéas 1(a), c) ou d), dans les 42 jours de la réception paragraph (1)(a), (c) or (d). de la demande. (3) Where the engineer has notified an applicant that (3) Après avoir avisé le requérant qu’il a ordonné des the engineer has ordered further studies or études ou des enquêtes supplémentaires, selon investigations to be made pursuant to paragraph (1)(c), l’alinéa (1)c), l’ingénieur se conforme aux alinéas (1)a) the engineer shall, within 12 months after the date of ou d), dans les douze mois de la réception de la receipt of the application, comply with paragraph (1)(a) demande. or (d). 25. Where the engineer receives an application for a 25. Dans les trois jours de la réception d’une demande Class B Permit that is not made in accordance with this de permis de catégorie B non conforme au présent Regulation, the engineer shall, within three days règlement, l’ingénieur donne au requérant un avis écrit thereafter, notify the applicant in writing that the et motivé du rejet de sa demande. application cannot be accepted and give the reasons why. 26. The engineer shall, within 10 days after receipt of 26. Dans les dix jours de la réception d’une demande an application for a Class B Permit made in accordance de permis de catégorie B conforme au présent with this Regulation, règlement, l’ingénieur : (a) issue a Class B Permit subject to any terms and a) soit délivre le permis sous réserve des conditions he or she may include therein conditions qu’il peut y énoncer, selon le pursuant to subsection 30(1); or paragraphe 30(1); (b) refuse to issue a permit and notify the b) soit donne au requérant un avis écrit et motivé applicant in writing of the refusal and the du rejet de la demande de permis. reasons why. 27. The engineer may, where he or she deems it 27.
Part document.segment-2
Land Use Regulation — segment 2
- document.segment-2 Verify source ↗
Land Use Regulation — segment 2
AI-assisted research summary: This provision sets permit duties, engineer and inspector powers, fees, deadlines, and security deposit rules for land use operations.
S’il le juge nécessaire, l’ingénieur peut aviser par necessary, notify an applicant in writing that the écrit le requérant que sa demande de permis de application for a Class B Permit will be considered as catégorie B sera considérée comme une demande de an application for a Class A Permit. permis de catégorie A. 28. The engineer shall assign a number to each permit 28. L’ingénieur attribue un numéro à chaque permis that he or she issues. qu’il délivre. Display of permit Affichage du permis 29. Every permittee engaged in a work or an 29. Un détenteur de permis effectuant un travail ou undertaking authorized by a permit shall display une activité autorisée par le permis affiche : (a) an exact copy of the permit, including the a) une copie conforme du permis et de ses conditions thereof, in such manner and at such conditions, de la façon et aux endroits prescrits places as the engineer may require; and par l’ingénieur; (b) the number assigned to the permit on such b) le numéro du permis sur les articles et articles and equipment, in such manner and at l’équipement, de la façon et aux endroits such places as the engineer may require. prescrits par l’ingénieur. Page 12 YUKON REGULATIONS RÈGLEMENTS DU YUKON c Land Use Regulation Règlement sur l’utilisation des terres Section 30. Article 30. Terms and conditions of permits Conditions des permis 30.(1) The engineer may include in any permit terms 30.(1) L’ingénieur peut énoncer dans un permis des and conditions respecting conditions concernant : (a) the location and the area of territorial lands a) l’emplacement et la superficie des terres that may be used; territoriales pouvant être utilisées; (b) the times at which any work or undertaking b) les périodes au cours desquelles un travail ou may be carried on; une activité peut être exécuté; (c) the type and size of equipment that may be c) le genre et la taille de l’équipement pouvant used in the land use operation; être employé lors de l’exploitation des terres; (d) the methods and techniques to be employed by d) les méthodes et techniques que doit employer the permittee in carrying out the land use le détenteur de permis lors de l’exploitation des operation; terres; (e) the type, location, capacity, and operation of all e) le genre, l’emplacement, la capacité et le facilities to be used by the permittee in the land fonctionnement de toutes les installations que use operation; doit utiliser le détenteur de permis lors de l’exploitation des terres; (f) the methods of controlling or preventing f) les mesures préventives contre l’accumulation ponding of water, flooding, erosion, slides, and d’eau, l’inondation, l’érosion, les glissements et subsidences of land; les affaissements de terrain; (g) the use, storage, handling, and ultimate g) l’emploi, l’entreposage, la manipulation et disposal of any chemical or toxic material to be l’élimination des matières chimiques ou used in the land use operation; toxiques qui doivent être utilisées au cours de l’exploitation des terres; (h) the protection of wildlife and fisheries habitat; h) la protection de la faune terrestre et aquatique; (i) the protection of objects and places of i) la protection des objets et des lieux ayant une recreational, scenic, and ecological value; valeur récréative, panoramique ou écologique; (j) the deposit of security in accordance with j) le dépôt d’une garantie, selon l’article 35; section 35; (k) the establishment of petroleum fuel storage k) la mise sur pied d’installations pour facilities; l’entreposage du combustible; (l) the methods and techniques for debris and l) les méthodes et techniques utilisées pour brush disposal; and disposer des débris et des broussailles; (m) such other matters not inconsistent with this m) d’autres matières, compatibles avec le présent Regulation as the engineer thinks necessary for règlement, que l’ingénieur juge nécessaires à la the protection of the biological or physical protection des caractéristiques physiques et characteristics of the land management zone. biologiques de la zone de gestion des terres. (2) The engineer may modify any of the terms or (2) L’ingénieur peut modifier les conditions d’un conditions included in a permit on receipt of a written permis à la réception d’une demande écrite du request from the permittee that sets out détenteur énonçant : (a) the terms or conditions in the permit that the a) les conditions du permis que le détenteur permittee wishes modified; and désire faire modifier; c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 13 Land Use Regulation Règlement sur l’utilisation des terres Section 31. Article 31. (b) the nature of the modification proposed and b) la nature et le motif du changement proposé. the reasons for the modification. (3) Where the engineer receives a written request (3) Dans les dix jours de la réception de la demande from a permittee pursuant to subsection (2), the visée au paragraphe (2), l’ingénieur donne au engineer shall notify the permittee of the engineer’s détenteur de permis un avis motivé de sa décision. decision and the reasons for it within 10 days of receipt of the request. (4) Every permit shall set out the period for which it is (4) Le permis indique sa période de validité n’excédant valid and such period shall be based on the estimated pas deux ans et fixée d’après les dates prévues dans la dates of commencement and completion as set out by demande de permis pour le commencement et la fin the permittee in the application, but in no case shall a des travaux. permit be valid for a period exceeding two years. (5) On receipt of a written request from a permittee (5) Sur réception d’une demande écrite d’un détenteur for an extension of the duration of their permit, the de permis concernant la prolongation de la durée de engineer may extend the duration of the permit subject validité de son permis, l’ingénieur peut, sous réserve to such conditions not inconsistent with this Regulation des conditions qu’il juge à propos et compatibles avec as the engineer thinks fit, for such period, not le présent règlement, accorder la prolongation, qui exceeding one year, as the engineer thinks necessary n’excédera pas un an, qu’il juge nécessaire à to enable the permittee to complete the land use l’achèvement de l’exploitation des terres autorisée par operation authorized by the permit. le permis. Reports □ Rapports □ 31. Every permittee shall submit to the inspector or 31. Le détenteur de permis présente à l’inspecteur ou engineer, in a form and on a date satisfactory to the à l’ingénieur, dans la forme et aux dates qu’ils jugent inspector or engineer, such reports as are requested by satisfaisantes, les rapports qu’ils demandent afin de the inspector or engineer, in order to ascertain the s’enquérir de l’avancement de l’exploitation des terres. progress of the land use operation. Final plan Plan définitif 32.(1) Every permittee shall, within 60 days after the 32.(1) Dans les 60 jours de l’achèvement de completion of a land use operation or the expiry of l’exploitation des terres ou de la date d’expiration de their permit, whichever occurs first, submit a final plan son permis si cette éventualité survient en premier, le in duplicate to the engineer showing détenteur de permis présente à l’ingénieur un plan définitif, en double exemplaire, indiquant : (a) the lands actually subjected to the land use a) les terres effectivement sujettes à l’exploitation; operation; (b) the location of b) l’emplacement : (i) lines, trails, rights-of-way, and cleared areas (i) des lignes de levé, sentiers, servitudes de that were used by the permittee during the passage et zones essartées que le détenteur land use operation, specifying those that a utilisés au cours de l’exploitation des were cleared by the permittee and those that terres, en précisant ceux qu’il a lui-même existed before the land use operation began, essartés et ceux qui existaient déjà au début de l’exploitation, (ii) buildings, campsites, air landing strips, air (ii) des bâtiments, campements, pistes navigation aids, fuel and supply storage d’atterrissage, aides à la navigation sites, waste disposal sites, excavations, and aérienne, endroits d’entreposage des other works and places that were combustibles et des fournitures, dépotoirs, Page 14 YUKON REGULATIONS RÈGLEMENTS DU YUKON c Land Use Regulation Règlement sur l’utilisation des terres Section 33. Article 33. constructed or used by the permittee during excavations et autres travaux ou endroits the land use operation, and que le détenteur a utilisés ou aménagés au cours de l’exploitation des terres, (iii) bridges, dams, ditches, railroads, highways (iii) des ponts, barrages, fossés, voies ferrées, and roads, transmission lines, pipelines, routes, chemins, lignes de transmission, survey lines and monuments, air landing pipe-lines, lignes de levé et bornes-signaux, strips, streams, and all other features, pistes d’atterrissage, cours d’eau et autres structures or works that were affected by the éléments, structures ou travaux affectés par land use operation; and l’exploitation des terres; (c) the calculations of the area of territorial lands c) les calculs de la superficie des terres used in the operation. territoriales utilisées dans l’exploitation. (2) The final plan submitted to the engineer pursuant (2) Le plan définitif présenté à l’ingénieur selon le to subsection (1) shall be paragraphe (1) est : (a) certified by the permittee or their agent a) soit certifié par le détenteur du permis, ou par authorized for the purpose as to the son mandataire autorisé à cette fin, quant à accuracy of l’exactitude : (i) locations, distances, and areas, and (i) des emplacements, distances et superficies, (ii) the representation of the land use (ii) de la description de l’exploitation des terres; operation; or (b) drawn from and accompanied by positive prints b) soit tiré et accompagné de clichés positifs de of vertical aerial photographs or aerial photographies aériennes verticales, montrant photomosaics showing the lands subjected to les terres sujettes à l’exploitation. the land use operation. (3) On receipt of a written request from a permittee (3) L’ingénieur peut proroger, de 60 jours au plus, le for an extension of the time for filing a final plan, the délai fixé pour la présentation du plan définitif, s’il engineer may extend the time for filing the final plan reçoit une demande écrite en ce sens, d’un détenteur by not more than 60 days. de permis. (4) The engineer shall reject the final plan if it does not (4) L’ingénieur rejette un plan définitif non conforme à comply with this section and section 34 and the cet article et à l’article 34 et, dans les trois semaines de permittee shall, within three weeks after receipt of la réception d’un avis écrit de l’ingénieur à cet effet, le written notice from the engineer of rejection of the détenteur de permis lui soumet un nouveau plan plan, submit to the engineer another final plan that définitif conforme à cet article et à l’article 34. complies with this section and section 34. (5) Notwithstanding the expiry of a permit or the (5) Malgré l’expiration d’un permis ou la présentation submission of a final plan, every permittee remains d’un plan définitif, le détenteur de permis est tenu de responsible for their obligations arising under the satisfaire aux obligations énoncées dans le permis ou terms and conditions of the permit or under this dans le présent règlement, jusqu’au moment où Regulation until such time as the engineer issues a l’ingénieur lui délivre une lettre d’acquittement relative letter of clearance for the land use operation. à l’exploitation des terres. Determination of land use fee Établissement du droit d’utilisation des terres 33.(1) Within 30 days after the engineer has issued a 33.(1) Dans les 30 jours de la délivrance par letter of clearance, the permittee shall calculate the l’ingénieur d’une lettre d’acquittement, le détenteur de land use fee payable based on the actual area of land permis calcule le droit d’utilisation des terres d’après la used in the operation and the engineer shall, superficie réelle des terres utilisées, et l’ingénieur : c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 15 Land Use Regulation Règlement sur l’utilisation des terres Section 34. Article 34. (a) where the land use fee submitted with the a) soit, lorsque le droit d’utilisation joint à la application is greater than the fee so demande de permis dépasse le montant du calculated, refund the excess to the permittee; droit ainsi calculé, rembourse le détenteur de or permis du montant excédentaire; (b) where the land use fee submitted with the b) soit, lorsque le droit d’utilisation joint à la application is less than the fee so calculated, demande de permis est moindre que le demand, by notice in writing to the permittee, montant du droit ainsi calculé, réclame le payment of the deficiency. montant de la différence au détenteur de permis par un avis écrit. (2) Where an application for a permit is refused, the (2) Lorsqu’une demande de permis est rejetée, le droit land use fee submitted with the application shall be d’utilisation est remboursé au requérant. refunded to the applicant. (3) No application fee shall be refunded. (3) Le droit exigé pour la demande n’est pas remboursable. Land division and plans Division des terres et plans 34. Every preliminary plan or final plan submitted 34. Un plan provisoire ou définitif présenté selon le under this Regulation shall présent règlement : (a) be drawn to a scale that clearly shows the lands a) est établi à une échelle indiquant clairement les that the applicant for a permit proposes to use terres que le requérant d’un permis se propose or the permittee has used; d’utiliser ou que le détenteur de permis a utilisées; (b) show the scale to which the plan is drawn; and b) indique l’échelle du plan; (c) show locations c) indique les emplacements : (i) in accordance with sections 2 to 4 of the Oil (i) soit selon les articles 2 à 4 du Règlement sur and Gas Disposition Regulations, or les titres d’aliénation pétroliers et gaziers, (ii) by giving the geographic co-ordinates (ii) soit en donnant leurs coordonnées thereof. géographiques. Security deposit Dépôt de garantie 35.(1) In order to ensure that a permittee complies 35.(1) Pour s’assurer que le détenteur de permis se with the terms and conditions of their permit and with conforme aux conditions de son permis et au présent this Regulation, the engineer may include in the permit règlement, l’ingénieur peut imposer comme condition a condition that the permittee deposit with the Minister qu’il dépose auprès du ministre une garantie a security deposit not exceeding $100,000. n’excédant pas 100 000 $. (2) Where a permit includes a condition requiring a (2) Un détenteur de permis ne peut commencer security deposit, the permittee shall not begin the land l’exploitation des terres avant d’avoir déposé auprès du use operation until a security deposit has been ministre la garantie exigée dans le permis. deposited with the Minister. (3) A security deposit shall be in the form of (3) Le dépôt d’une garantie se fait sous forme : (a) a promissory note guaranteed by a chartered a) soit de billet à ordre garanti par une banque à bank and payable to the Receiver General; charte et payable au receveur général; Page 16 YUKON REGULATIONS RÈGLEMENTS DU YUKON c Land Use Regulation Règlement sur l’utilisation des terres Section 36. Article 36. (b) a certified cheque drawn on a chartered bank b) soit de chèque visé tiré sur une banque à in Canada and payable to the Receiver General; charte canadienne et payable au receveur général; (c) bearer bonds issued or guaranteed by the c) soit d’obligations au porteur émises ou Government of Canada; or garanties par le gouvernement du Canada; (d) a combination of the securities described in d) soit d’une combinaison des garanties décrites paragraphs (a) to (c). aux alinéas a) à c). (4) A security deposit shall be returned by the Minister (4) Le ministre rembourse le dépôt de garantie lorsque when the engineer has issued a letter of clearance in l’ingénieur a délivré une lettre d’acquittement relative à respect of the land use operation. l’exploitation des terres. (5) Where a permittee has not complied with all the (5) Lorsqu’un détenteur de permis ne s’est pas terms and conditions of his permit or with this conformé à toutes les conditions de son permis ou au Regulation and the land use operation of the permittee présent règlement et qu’il a, par son exploitation des results in damage to the lands, the Minister may retain terres, endommagé celles-ci, le ministre peut retenir the whole of the security deposit or such portion of the tout ou partie du dépôt de garantie, selon ce qui est security deposit as is required to restore the lands to nécessaire pour remettre en bon état les terres their former condition. endommagées. (6) Where the Minister retains a portion of a security (6) Si le ministre retient une partie du dépôt de deposit pursuant to subsection (5), the Minister shall garantie conformément au paragraphe (5), il en remet return the remainder of the security deposit to the le reliquat au détenteur de permis. permittee. (7) Where the whole of a security deposit retained by (7) Si le montant du dépôt de garantie retenu the Minister pursuant to subsection (5) is insufficient to conformément au paragraphe (5) est insuffisant pour cover the cost of restoring the lands to their former acquitter le coût des travaux effectués pour remettre condition, the deficiency shall be collectable as a debt en bon état les terres endommagées, la différence peut due to the Government of the Yukon. être recouvrée du détenteur de permis à titre de créance du gouvernement du Yukon. Letter of clearance Lettre d’acquittement 36. When the engineer is satisfied that a permittee has 36. Lorsque l’ingénieur est convaincu que le détenteur complied with all the terms and conditions of the de permis s’est conformé aux conditions de son permis permit and with the provisions of this Regulation, the et au présent règlement, il lui délivre une lettre engineer shall issue a letter of clearance to the d’acquittement. permittee. Duties and powers of inspectors Fonctions et pouvoirs de l’inspecteur 37.(1) It shall be a condition of every permit that the 37.(1) Tout permis est sujet au droit d’un inspecteur permittee shall permit an inspector, at any reasonable de pénétrer, à tout moment raisonnable, en un lieu ou time, to enter any place or premises on territorial lands dans des locaux situés sur des terres territoriales et under the permittee’s ownership or occupation, other dont le détenteur de permis est l’occupant ou le than a private dwelling, and make such inspections as propriétaire, sauf dans une habitation particulière, et the inspector thinks necessary to determine whether de faire les inspections qu’il juge nécessaires pour the terms and conditions of the permit or the déterminer si les conditions du permis ou les provisions of this Regulation are being complied with. dispositions du présent règlement sont respectées. c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 17 Land Use Regulation Règlement sur l’utilisation des terres Section 38. Article 38. (2) An inspector shall be furnished with a certificate of (2) Un inspecteur est muni du certificat de sa his or her appointment as an inspector and on entering nomination comme inspecteur et il le présente sur any place or premises under subsection (1) shall, if so demande lorsqu’il pénètre en un lieu ou dans des requested, produce the certificate. locaux selon le paragraphe (1). (3) Every person in any place or premises entered by (3) Une personne présente en un lieu ou dans des an inspector under subsection (1) shall give the locaux visités par un inspecteur selon le paragraphe (1) inspector such assistance and furnish the inspector lui fournit l’aide et les renseignements qu’il peut with such information as the inspector may, for the raisonnablement exiger pour exécuter ses fonctions purpose of carrying out his or her duties under this selon le présent règlement. Regulation, reasonably require. 38. No person shall willfully obstruct or hinder an 38. Nul ne peut nuire volontairement à un inspecteur inspector in carrying out the inspector’s duties under dans l’exécution de ses fonctions en vertu du présent this Regulation. règlement. 39. No person shall knowingly make a false or 39. Nul ne peut faire, verbalement ou par écrit, une misleading statement either orally or in writing to an déclaration fausse ou trompeuse à un inspecteur inspector engaged in carrying out the inspector’s duties exécutant ses fonctions en vertu du présent règlement. under this Regulation. Suspension of a land use operation Suspension de l’exploitation des terres 40.(1) Where an inspector is of the opinion that a 40.(1) Lorsqu’un inspecteur est d’avis qu’un détenteur permittee has failed to comply with any term or de permis ne s’est pas conformé à une condition de son condition of their permit or any provision of this permis ou à une disposition du présent règlement, il en Regulation, the inspector shall so inform the permittee informe le détenteur de permis et, si le manquement and, if the default continues, the inspector may give persiste, il peut l’aviser qu’à défaut de conformité dans notice to the permittee that if the default is not le délai précisé dans l’avis, il peut suspendre une partie corrected within the time specified in the notice the ou la totalité de l’exploitation des terres. inspector may order the suspension of the land use operation or any part of it. (2) If a permittee does not correct a default within the (2) Si le détenteur de permis ne se conforme pas dans time specified in a notice given by an inspector under le délai précisé dans l’avis donné par un inspecteur subsection (1), the inspector may order the permittee selon le paragraphe (1), l’inspecteur peut lui ordonner to suspend the land use operation or any part of it and de suspendre une partie ou la totalité de l’exploitation the permittee shall thereupon suspend the land use des terres, et le détenteur de permis cesse alors operation or part of it until the inspector authorizes the l’exploitation jusqu’à ce que l’inspecteur l’autorise à la permittee to resume the land use operation. reprendre. (3) An inspector shall authorize a permittee to resume (3) L’inspecteur autorise un détenteur de permis à a land use operation or part thereof suspended under reprendre l’exploitation des terres suspendue selon le subsection (2) when the inspector or the engineer is paragraphe (2) lorsque lui-même ou l’ingénieur s’est satisfied that the default has been corrected, unless the assuré de la correction du défaut, à moins que le permit has in the meantime been cancelled pursuant to permis n’ait été annulé entre-temps selon l’article 41. section 41. (4) Where a permittee has been informed of a default (4) Si, après avis d’un défaut selon le paragraphe (1) pursuant to subsection (1) or an order has been made ou réception d’un ordre selon le paragraphe (2), le in respect of it pursuant to subsection (2), the engineer détenteur de permis n’a pas remédié à la situation, may, if the permittee fails to correct the default, take l’ingénieur peut prendre les mesures qu’il juge such action as the inspector deems necessary to nécessaires pour y satisfaire. correct the default. Page 18 YUKON REGULATIONS RÈGLEMENTS DU YUKON c Land Use Regulation Règlement sur l’utilisation des terres Section 41. Article 41. (5) The costs of any action taken by the engineer (5) Les frais des mesures prises par l’ingénieur selon le pursuant to subsection (4) may be recovered from the paragraphe (4) peuvent être recouvrés du détenteur de permittee as a debt due to the Government of the permis à titre de créance du gouvernement du Yukon. Yukon. (6) Nothing in this section relieves a permittee from (6) Aucune disposition du présent article ne relève un prosecution for any violation of this Regulation. détenteur de permis des poursuites dont il est passible pour violation du présent règlement. (7) No order pursuant to subsection (2) shall be made (7) S’il s’agit du forage d’un puits de pétrole ou de gaz, in respect of an oil or gas drilling site between the time aucun ordre visé au paragraphe (2) ne peut être donné of spud-in and the rig release date without the entre la percée de forage et le renvoi de l’équipe, sans concurrence of the Chief Operations Officer. l’accord du délégué aux opérations. Cancellation of permit Annulation du permis 41.(1) Where a land use operation has been suspended 41.(1) Lorsque l’exploitation des terres a été pursuant to section 40 and the permittee fails or suspendue selon l’article 40 et que le détenteur de refuses to correct the default in complying with any permis néglige ou refuse de remédier à son défaut de terms and conditions of a permit or of any provision of se conformer aux conditions du permis ou au présent this Regulation, the engineer may cancel the permit. règlement, l’ingénieur peut annuler le permis. (2) The cancellation of a permit under subsection (1) (2) L’annulation d’un permis selon le paragraphe (1) ne shall not relieve the permittee from any obligation dégage pas le détenteur de permis de ses obligations arising under the terms and conditions of the permit or découlant du permis ou du présent règlement, ni de under this Regulation, or from complying with any l’obligation de se conformer à un avis, à une directive notice, direction or order given by an inspector or by ou à un ordre reçu d’un inspecteur ou de l’ingénieur. the engineer. Discontinuance of a land use operation Cessation d’un travail d’utilisation des terres 42.(1) Subject to subsection (2), where a permittee 42.(1) Sous réserve du paragraphe (2), le détenteur de wishes to discontinue a land use operation at any time permis qui désire cesser l’exploitation des terres avant prior to the date of completion set out in the permit, la date d’achèvement visée dans le permis, en donne à the permittee shall give notice of discontinuance in l’ingénieur un avis écrit, et lui indique la date prévue writing to the engineer indicating the date upon which de la cessation. the permittee proposes to discontinue the land use operation. (2) A notice of discontinuance given pursuant to (2) L’avis de cessation donné selon le paragraphe (1) subsection (1) shall be given to the engineer at least 10 est donné à l’ingénieur au moins dix jours avant la date days prior to the proposed date of the discontinuance. prévue de la cessation. (3) On receipt of a notice of discontinuance, the (3) Sur réception de l’avis de cessation, l’ingénieur engineer shall amend a copy of the permit accordingly modifie une copie du permis en conséquence et la and shall forward the amended copy of the permit to transmet au détenteur de permis. the permittee. (4) The discontinuance of a land use operation (4) La cessation de l’exploitation des terres, selon le pursuant to this section does not relieve the permittee présent article, ne dégage pas le détenteur de permis from any obligations arising under the terms and de ses obligations découlant du permis ou du présent conditions of the permit or under this Regulation up to règlement, jusqu’à la date de cessation, ni de the time of discontinuance or from complying with any l’obligation de se conformer à un avis, à une directive notice, direction or order given by an inspector or by ou à un ordre reçu d’un inspecteur ou de l’ingénieur. the engineer. c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 19 Land Use Regulation Règlement sur l’utilisation des terres Section 43. Article 43. Assignment Cession □ 43.(1) On receipt of an application in writing for 43.(1) L’ingénieur peut approuver la cession — totale approval of an assignment of a permit and of the fee ou partielle d’un permis sur réception d’une demande set out in Schedule 1, the engineer may approve the écrite à cet effet accompagnée du droit prévu à assignment in whole or in part. l’annexe 1. (2) An application for approval of an assignment shall (2) La demande d’approbation de la cession est be forwarded to the engineer at least 10 days prior to transmise à l’ingénieur au moins dix jours avant la the proposed effective date of the assignment and shall date prévue de la cession et indique le numéro de include the permit number of the assignor, the name permis du cédant, le nom et l’adresse du cessionnaire and address of the proposed assignee, and particulars et les détails des intérêts ou droits dévolus au of the interests or rights of the assignee to be benefited cessionnaire par suite de la cession. by the assignment of the permit. Appeals □ Appels □ 44.(1) An applicant for a permit or a permittee may, 44.(1) Le requérant d’un permis ou le détenteur de within 30 days after any decision, direction, or order permis peut, dans les 30 jours de la date d’une made by the engineer or an inspector, appeal from it to décision, d’une directive ou d’un ordre, reçus de the Minister. l’ingénieur ou d’un inspecteur, en appeler au ministre. (2) An appeal referred to in subsection (1) shall be by (2) L’appel visé au paragraphe (1) se fait par avis écrit notice in writing setting forth exposant : (a) the decision, direction, or order appealed from; a) la décision, la directive ou l’ordre faisant l’objet de l’appel; (b) the relevant circumstances surrounding the b) les circonstances pertinentes ayant suscité la giving of the decision, direction, or order; and décision, la directive ou l’ordre; (c) the grounds of the appeal. c) les motifs de l’appel. (3) A person appealing to the Minister pursuant to (3) Quiconque interjette appel au ministre selon le subsection (1) shall provide the Minister with such paragraphe (1) lui fournit les détails supplémentaires further particulars with respect to the appeal as the pertinents qu’il peut exiger. Minister may require. (4) The Minister may, after receipt of an appeal (4) Le ministre peut, après réception d’un appel selon pursuant to subsection (1), set aside, confirm, or vary le paragraphe (1), annuler, confirmer ou modifier la the decision, direction, or order appealed from or may décision, la directive ou l’ordre faisant l’objet de l’appel, remit it to the engineer for reconsideration with such ou le renvoyer à l’ingénieur pour révision avec les instructions as the Minister deems proper. directives qu’il juge à propos. (5) A decision, direction, or order appealed from (5) Une décision, une directive ou un ordre faisant remains in full force and effect pending the decision of l’objet d’un appel reste en vigueur jusqu’à la décision the Minister or an officer appointed by the Minister du ministre ou du fonctionnaire nommé par lui selon le pursuant to subsection (6). paragraphe (6). (6) The Minister may authorize a public officer in the (6) Le ministre peut autoriser un fonctionnaire de son Minister’s department, other than the engineer, to ministère, sauf l’ingénieur, à exercer les pouvoirs du exercise the Minister’s powers in respect of any appeal ministre concernant un appel selon le présent article. pursuant to this section. Notice □ Avis □ 45.(1) Any direction, notice, or order given to a 45.(1) Une directive, un avis ou un ordre donné à un Page 20 YUKON REGULATIONS RÈGLEMENTS DU YUKON c Land Use Regulation Règlement sur l’utilisation des terres Section 45. Article 45. permittee under this Regulation shall be sufficiently détenteur de permis selon le présent règlement est given if sent by registered mail to, or left at, the valablement donné s’il a été expédié sous pli permittee’s address as stated in the permittee’s recommandé ou déposé à l’adresse que le détenteur de application for the permit and shall be deemed to have permis a déclarée dans sa demande de permis, et il est been given to the permittee on the date it was so censé avoir été donné au détenteur à la date de son mailed or left. expédition ou de son dépôt. (2) Where a direction, notice, or order is given to a (2) Une directive, un avis ou un ordre donné permittee otherwise than in writing, it shall forthwith verbalement à un détenteur de permis est be confirmed in writing. immédiatement confirmé par écrit. Fees □ Droits □ 46. The fee set out in column 2 of an item of 46. Les droits exigibles qui se trouvent à la colonne 2 Schedule 1 or Schedule 2 is payable for the service set d’un article de l’annexe 1 sont payables pour un service out in column 1 of that item. qui se trouve à la colonne 1 de cet article. c YUKON REGULATIONS RÈGLEMENTS DU YUKON Page 21 Land Use Regulation Règlement sur l’utilisation des terres SCHEDULE 1 ANNEXE 1 SCHEDULE 1 (ANNEXE 1) SCHEDULE 1 ANNEXE 1 SERVICE FEES DROITS POUR SERVICES RENDUS Item Column 1 Service Column 2 Fee Article Colonne 1 Services rendus Colonne 2 Droits ($) 1. Permit application $150 1. Demande de permis 150 2. Assignment of permit 50 2. Cession de permis 50 3. Copies of documents 1.00 per page 3. Copies de documents 1 00/page SCHEDULE 2 (ANNEXE 2) SCHEDULE 2 ANNEXE 2 LAND USE FEES DROITS D’UTILISATION DES TERRES Item Column 1 Description Column 2 Fee Article Colonne 1 Description Colonne 2 Droits ($) 1. Where area of lands $50 1. Terres qui, selon le plan 50 proposed to be used as provisoire, ont une shown on the preliminary superficie égale ou plan is less than or equal inférieure à 2 hectares to 2 ha 2. Where area of lands $50 plus 2. Terres qui, selon le plan 50 plus 50 $ proposed to be used as $50/ha for provisoire, ont une pour chaque shown on the preliminary each hectare superficie supérieure à 2 hectare, ou plan is greater than 2 ha or portion of a hectares fraction hectare in d’hectare, excess of 2 ha en sus de 2 Page 22 YUKON REGULATIONS RÈGLEMENTS DU YUKON c
Provision text is displayed from LexChat’s stored statute record. Use the official source links to verify amendments, commencement, and current legal force.
Ask AI about this statute
Land Use Regulation
Sign in to ask AI about this statute
Sign in to start authenticated, citation-grounded statute research.
Sign in