Real Decreto 223/2008, de 15 de febrero, por el que se aprueban el Reglamento sobre condiciones técnicas y garantías de seguridad en líneas eléctricas de alta tensión y sus instrucciones técnicas complementarias ITC-LAT 01 a 09. | BOE-A-2008-5269 — Spain law | Esheria

Real Decreto 223/2008, de 15 de febrero, por el que se aprueban el Reglamento sobre condiciones técnicas y garantías de seguridad en líneas eléctricas de alta tensión y sus instrucciones técnicas complementarias ITC-LAT 01 a 09.

This provision says the regulation sets technical conditions and safety guarantees for high-voltage electricity lines.

AI-assisted research synopsis — verify against the official legal text below.

Jurisdiction
Spain
Instrument
Regulation
Citation
BOE-A-2008-5269
Version
Undated source snapshot
Language
es
Updated
Official source
View official record ↗
EU member state documents accident reporting activity declaration administrative authorization authorization business licensing certification commissioning competence complaints compliance timing cost allocation declarations document recognition electric lines electrical equipment electrical infrastructure electrical installation electrical installation documentation electrical safety electricity distribution electricity infrastructure electricity installations electricity transmission +51 more

Publicly available, excluded from search-engine indexing

This page remains available for direct access and API use, but this release emits noindex,follow for the following reason:

  • The record does not meet this release's canonical indexing criteria. (market-indexing-disabled)

Statute overview

About this statute

Breaches of this regulation are sanctioned under the penalty rules of Law 21/1992, and, where applicable, Law 54/1997. Breaches arising from Royal Decree 1432/2008 follow that decree’s own sanctioning regime. El órgano competente del Ministerio debe elaborar y mantener actualizada una guía técnica no vinculante, y puede incluir aclaraciones sobre conceptos del reglamento y sus ITCs. Materials and equipment in high-voltage line circuits must comply with the applicable technical standards; the project designer must justify any necessary variations, and the competent public administration must authorize and inspect compliance. For high-voltage lines, a project signed by a competent qualified technician is required, and type projects may be approved and registered by the relevant authority depending on territorial scope. If there is imminent danger, line operation must be interrupted. In certain electricity network cases, the system operator or network managers decide the interruption; in emergencies, a qualified technician may take temporary measures with the owner’s authorization and must immediately report to the competent administration.