Ghana Act or statute

Parliament of Ghana

Renewable Energy (Amendment) Act, 2020 (Act 1045)

This section replaces section 25 to create a competitive procurement scheme for renewable electricity, and it bars public utilities from negotiating PPAs or contracting power unless the power was obtained through an open…

administrative penaltiesclean energydistributed generationelectricityelectricity procurementemissions offsettingnet meteringpower procurementpublic administrationrenewable energyrenewable energy fundingrenewable energy procurementrepealstatutory definitions

Publicly available, excluded from search-engine indexing

This page remains available for direct research for the following reasons:

  • The record does not meet this release's canonical indexing criteria. (market-indexing-disabled)
  • The record does not meet this release's canonical indexing criteria. (emergency-noindex)

Professional statute overview

Enactment structure, operative effect and source provenance

Official source

01

Purpose and legislative effect

“This section replaces section 25 to create a competitive procurement scheme for renewable electricity, and it bars public utilities from negotiating PPAs or contracting power unless the power was obtained through an open competitive and transparent process.”

This section replaces section 25 to create a competitive procurement scheme for renewable electricity, and it bars public utilities from negotiating PPAs or contracting power unless the power was obtained through an open competitive and transparent process. Electricity distribution utilities must buy renewable electricity from consumer generators, certain fossil-fuel-related companies must invest in renewable energy to offset emissions, and eligible bulk customers must buy renewable electricity under a valid permit. Sections 27 to 29 of Act 832 are repealed. This section establishes a net-metering scheme to encourage self-generation of electricity from renewable energy sources. Fund money must be used mainly for financial incentives, subsidies, and equity participation for specified renewable energy activities.

02

How the instrument operates

  1. 01

    Start with the recorded version

    Undated source snapshot. The date shown identifies this source expression and should not be treated as proof that no later change exists.

  2. 02

    Locate the controlling provision

    Use the provision map, part headings and full-text filter to move from the broad subject to the exact legal language.

  3. 03

    Read conditions and exceptions together

    Keep subsections, definitions, provisos and cross-references in context before drawing a legal conclusion.

  4. 04

    Verify currency and official wording

    Confirm later legislation, commencement notices and corrections with the official publisher before advice, filing or reliance.

03

Research entry points

Selected provisions across the instrument. Open any row to continue with the exact stored text.

Section 25 of Act 832 amended

This section replaces section 25 to create a competitive procurement scheme for renewable electricity, and it bars public utilities from negotiating PPAs or contracting power unless the power was obtained through an open competitive and transparent process.

Section 1

Section 32 of Act 832 amended

Fund money must be used mainly for financial incentives, subsidies, and equity participation for specified renewable energy activities.

Section 5

Section 49 of Act 832 amended

The Commission may issue guidelines, after consulting the Public Utilities Regulatory Commission, for renewable-energy power procurement and net metering. The amendment also sets an administrative penalty of 3,000 penalty units.

Section 6

Section 53 of Act 832 amended

Until a Renewable Energy Authority is established, the Renewable Energy Directorate must oversee renewable energy activities, and the Minister may designate a public entity for certain renewable energy tasks.

Section 8

04

Source and current-law status

Source record view

Source record from ir.parliament.gh · Undated source snapshot

Verify current force

The source record does not state a definitive current-law status. Check the official publisher and later amendments before relying on this text.

Source-indexed provision map

Sections and provisions

Search by section, heading, part or exact legal wording. Every result remains linked to the stored source record.

Showing 8 of 8 provisions

Substitution 6RepealAmendment
§ 1Section 25 of Act 832 amendedSubstitution

This section replaces section 25 to create a competitive procurement scheme for renewable electricity, and it bars public utilities from negotiating PPAs or contracting power unless the power was obtained through an open competitive and transparent process.

Section 1—Section 25 of Act 832 amended The Renewable Energy Act, 2011 (Act 832), referred to in this Act as the "principal enactment", is amended by the substitution for section 25, of "Competitive procurement scheme 25. (1) There is established by this Act, a competitive procurement scheme for the purpose of attracting a competitive market rate for electricity generated from a renewable energy source. (2) The competitive procurement scheme shall consist of (a) a tendering process; and (b) an auction scheme. (3) The Commission shall, in consultation with the Public Utilities Regulatory Commission, determine targets as part of the annual energy supply and demand plans. (4) Electricity procured from a wholesale supplier shall be procured in accordance with the annual energy supply and demand plans and subsection (2). (5) A public utility shall not negotiate for a Power Purchase Agreement with a generator of electricity or contract power for electricity generated from a renewable energy source unless the contracted power has gone through an open competitive and transparent procurement process. 3 (6) A public utility that contravenes subsection (5) commits an offence and is liable on summary conviction to a fine of not more than ten thousand penalty units.".
§ 2Section 26 of Act 832 amendedSubstitution

Electricity distribution utilities must buy renewable electricity from consumer generators, certain fossil-fuel-related companies must invest in renewable energy to offset emissions, and eligible bulk customers must buy renewable electricity under a valid permit.

Section 2—Section 26 of Act 832 amended The principal enactment is amended by the substitution for section 26, of "Renewable energy purchase obligation 26. (1) An electricity distribution utility shall procure electricity from a renewable energy source from a consumer generator in accordance with section 30A. (2) The Public Utilities Regulatory Commission shall, in consultation with the Commission and the distribution utilities, determine the price at which a distribution utility shall procure electricity from a consumer generator under a net metering scheme at any specific time. (3) A fossil fuel based wholesale electricity supplier, a fossil fuel producer and any other company that contributes to greenhouse gas emission shall. invest in a non-utility scale renewable energy to offset the greenhouse gas emission and mitigate the impact of climate change. (4) The Board shall, in consultation with— (a) the Public Utilities Regulatory Commission, and (b) the distribution utilities determine the level of the non-utility scale renewable energy and technology required to be invested in under subsection (3). (5) A bulk customer who holds a valid permit issued by the Commission shall purchase electricity from a renewable energy source at a price negotiated between the bulk customer and a wholesale supplier. (6) The Public Utilities Regulatory Commission shall, in consultation with the Commission, specify the percentage level of electricity to be purchased by the bulk customer.".
§ 3Sections 27 to 29 of Act 832 repealedRepeal

Sections 27 to 29 of Act 832 are repealed.

Section 3—Sections 27 to 29 of Act 832 repealed The principal enactment is amended by the repeal of sections 27 to 29.
§ 4Section 30A insertedAmendment

This section establishes a net-metering scheme to encourage self-generation of electricity from renewable energy sources.

Section 4—Section 30A inserted The principal enactment is amended by the insertion after section 30, of "Net-metering scheme 30A. There is established by this Act, a net-metering scheme for the purpose of encouraging self- generation of electricity from a renewable energy source on a power cost reduction or a climate change mitigation basis and not for income generation.".
§ 5Section 32 of Act 832 amendedSubstitution

Fund money must be used mainly for financial incentives, subsidies, and equity participation for specified renewable energy activities.

Section 5—Section 32 of Act 832 amended The principal enactment is amended in section 32 by the substitution for subsection (2), of " (2) For the purposes of achieving the object of the Fund, moneys from the Fund shall be applied primarily to the provision of financial incentives, capital subsidies, production based subsidies and equity participation for (a) grid interactive renewable electricity; 4 (b) mini-grid and off-grid renewable power systems for remote areas and islands; (c) renewable energy projects for non-electricity purposes; and (d) any other renewable energy activity that the Commission may determine.".
§ 6Section 49 of Act 832 amendedSubstitution

The Commission may issue guidelines, after consulting the Public Utilities Regulatory Commission, for renewable-energy power procurement and net metering. The amendment also sets an administrative penalty of 3,000 penalty units.

Section 6—Section 49 of Act 832 amended The principal enactment is amended in (a) section 49 by the insertion after subsection (1), of "(1A) The Commission may, in consultation with the Public Utilities Regulatory Commission, issue guidelines for the (a) competitive procurement of power from a renewable energy source; and (b) implementation of the net-metering scheme. (1B) The guidelines issued pursuant to paragraph (a) of subsection (1A) shall take into account (a) the technology being used in the renewable energy industry; (b) the location of the generation facility; (c) the operating norms for the specific technology under consideration; and (d) maintaining a balance between the interest of the consumer, the public utilities and an investor."; and (b) subsection (4) of section 49 by the substitution for paragraph (a), of "(a) imposition of an administrative penalty of three thousand penalty units;".
§ 7Section 51 of Act 832 amendedSubstitution

This section amends section 51 by changing and adding several definitions.

Section 7—Section 51 of Act 832 amended The principal enactment is amended in section 51 by (a) the insertion after the definition for "Commission", of ""clean energy alternative" includes nuclear energy;"; (b) the deletion of the definition for "feed-in-tariff"; (c) the deletion of the definition for "feed-in-tariff scheme"; (d) the substitution for the definition for "hydro", of "" hydro" means a water-based energy system which produces electricity;"; (e) the insertion after the definition for "municipal waste", of ""net-metering" means a billing related mechanism designed to encourage an electricity consumer to supplement the purchase of electricity with grid-connected renewable energy self-generation;"; and (f) the substitution for the definition for "woodfuel", of ""woodfuel" includes (a) firewood; (b) charcoal; (c) briquette; and 5 (d) pellet.".
§ 8Section 53 of Act 832 amendedSubstitution

Until a Renewable Energy Authority is established, the Renewable Energy Directorate must oversee renewable energy activities, and the Minister may designate a public entity for certain renewable energy tasks.

Section 8—Section 53 of Act 832 amended The principal enactment is amended by the substitution for section 53, of "Transitional provisions 53. Until such time that a Renewable Energy Authority is established, (a) the Renewable Energy Directorate under the Ministry of Energy shall oversee the implementation of renewable energy activities in the country; and (b) the Minister may designate a public entity to (i) execute renewable energy projects initiated by the State or in which the State has an interest; (ii) manage the assets in the renewable energy sector on behalf of the State; and (iii) undertake a renewable energy activity and any other clean energy alternative activity for the purpose of generating electric power.". Date of Gazette Notification: 29th December, 2020.

Legislative relationships

0 referenced instruments

Names are derived from the stored provision headings and citation-enrichment layer. Treat this as a research index and verify each relationship against the source text.

No structured legislative relationships were detected

The statute remains fully searchable by provision. Consult the source text for amendments and cross-references that have not yet been indexed.

Recorded versions and source checkpoint

1 version available in this collection

Current-law checkpoint
  • Undated version · currentEnglish

Source-linked research

Ask AI about this statute

The overview, provisions, and source records above are public. Continue in a separate conversation with this statute’s jurisdiction and source version attached.

About this LexChat collection

Statute information is organised from identified legislative sources for professional research. Corrections can be reported to hello@esheria.ai.