Loi du 31 juillet 1995 modifiant et complétant la loi modifiée du 16 août 1967 ayant pour objet la création d'une grande voirie de communication et d'un fonds des routes.
This preamble identifies the law and records its formal adoption and promulgation.
AI-assisted research synopsis — verify against the official legal text below.
- Jurisdiction
- Luxembourg
- Instrument
- Act or statute
- Citation
- http://data.legilux.public.lu/eli/etat/leg/loi/1995/07/31/n8/jo
- Status
- In force
- Version
- Undated source snapshot
- Language
- fr
- Updated
- Official source
- View official record ↗
Publicly available, excluded from search-engine indexing
This page remains available for direct access and API use, but this release emits
noindex,follow for the following reason:
- The record does not meet this release's canonical indexing criteria.
(market-indexing-disabled)
Statute overview
About this statute
This preamble identifies the law and records its formal adoption and promulgation. This article replaces part of article 6 of the modified law of 16 August 1967 with a new description of the South collector road. This article adds a sentence saying the same rule applies to bypass roads that are part of an interregional road-link concept. An environmental impact study is required before a construction project can be entered into the law’s procedure, and public consultation must occur before the route is fixed.
Ask AI about this statute
Loi du 31 juillet 1995 modifiant et complétant la loi modifiée du 16 août 1967 ayant pour objet la création d'une grande voirie de communication et d'un fonds des routes.
Sign in to ask AI about this statute
Sign in to start authenticated, citation-grounded statute research.
Sign in