Règlement grand-ducal du 1er février 2010 concernant la réglementation temporaire de la circulation sur la N2 entre le lieu-dit Pulvermühle et le rond-point Schaffner à l'occasion de travaux routiers.
This provision is the preamble to a Grand-Ducal regulation on temporary traffic rules for the N2 between Pulvermühle and the Schaffner roundabout during road works.
AI-assisted research synopsis — verify against the official legal text below.
- Jurisdiction
- Luxembourg
- Instrument
- Regulation
- Citation
- http://data.legilux.public.lu/eli/etat/leg/rgd/2010/02/01/n9/jo
- Status
- Repealed
- Version
- Undated source snapshot
- Language
- fr
- Updated
- Official source
- View official record ↗
Publicly available, excluded from search-engine indexing
This page remains available for direct access and API use, but this release emits
noindex,follow for the following reason:
- The record does not meet this release's canonical indexing criteria.
(market-indexing-disabled)
Statute overview
About this statute
This provision is the preamble to a Grand-Ducal regulation on temporary traffic rules for the N2 between Pulvermühle and the Schaffner roundabout during road works. During roadworks on the N2, traffic is regulated, including a 50 km/h maximum speed, a no-overtaking rule for motor-vehicle drivers, and a pedestrian/cyclist access ban on a specified footpath section. Infractions au règlement: elles sont punies selon l’article 7 de la loi modifiée du 14 février 1955 sur la circulation routière. The Minister for Sustainable Development and Infrastructure is responsible for executing this regulation, and the regulation will be published in the Mémorial.
Ask AI about this statute
Règlement grand-ducal du 1er février 2010 concernant la réglementation temporaire de la circulation sur la N2 entre le lieu-dit Pulvermühle et le rond-point Schaffner à l'occasion de travaux routiers.
Sign in to ask AI about this statute
Sign in to start authenticated, citation-grounded statute research.
Sign in