Règlement grand-ducal du 28 octobre 2011 concernant la réglementation temporaire de la circulation sur la N10 entre Stolzembourg et Untereisenbach à l'occasion de travaux routiers. | http://data.legilux.public.lu/eli/etat/leg/rgd/2011/10/28/n4/jo — Luxembourg law | Esheria

Règlement grand-ducal du 28 octobre 2011 concernant la réglementation temporaire de la circulation sur la N10 entre Stolzembourg et Untereisenbach à l'occasion de travaux routiers.

This preamble states the legal bases for a grand-ducal regulation on temporary traffic circulation on the N10 during road works.

AI-assisted research synopsis — verify against the official legal text below.

Jurisdiction
Luxembourg
Instrument
Regulation
Citation
http://data.legilux.public.lu/eli/etat/leg/rgd/2011/10/28/n4/jo
Status
Repealed
Version
Undated source snapshot
Language
fr
Updated
Official source
View official record ↗
construction site safety road traffic road traffic compliance road works temporary traffic circulation

Publicly available, excluded from search-engine indexing

This page remains available for direct access and API use, but this release emits noindex,follow for the following reason:

  • The record does not meet this release's canonical indexing criteria. (market-indexing-disabled)

Statute overview

About this statute

This preamble states the legal bases for a grand-ducal regulation on temporary traffic circulation on the N10 during road works. During the works phase, traffic on the specified N10 road section must follow colored light signals, the site must be bypassed as signposted, the speed limit is 50 km/h near and through the site, and motor vehicle drivers may not overtake other motor vehicles except two-wheel motorcycles without sidecars and two-wheel mopeds. Infractions to this regulation are punished under article 7 of the modified law of 14 February 1955 on traffic regulation. The Minister for Sustainable Development and Infrastructure is responsible for carrying out this regulation.