Règlement grand-ducal du 15 décembre 2011 concernant la réglementation temporaire de la circulation sur le CR322B à Wahlhausen à l'occasion de travaux routiers.
This preamble introduces a grand-ducal regulation on temporary traffic rules for the CR322B at Wahlhausen during road works.
AI-assisted research synopsis — verify against the official legal text below.
- Jurisdiction
- Luxembourg
- Instrument
- Regulation
- Citation
- http://data.legilux.public.lu/eli/etat/leg/rgd/2011/12/15/n1/jo
- Status
- Repealed
- Version
- Undated source snapshot
- Language
- fr
- Updated
- Official source
- View official record ↗
Publicly available, excluded from search-engine indexing
This page remains available for direct access and API use, but this release emits
noindex,follow for the following reason:
- The record does not meet this release's canonical indexing criteria.
(market-indexing-disabled)
Statute overview
About this statute
This preamble introduces a grand-ducal regulation on temporary traffic rules for the CR322B at Wahlhausen during road works. Pendant les travaux routiers, l'accès au CR322B à Wahlhausen est interdit aux conducteurs de véhicules et d'animaux, sauf pour les riverains et leurs fournisseurs. After infrastructure works are completed and until horizontal road marking is in place, the speed limit is 70 km/h and drivers of motor vehicles may not overtake other motor vehicles, except two-wheel motorcycles without sidecar and two-wheel mopeds. Infractions to this regulation are punished under article 7 of the modified law of 14 February 1955. The Minister for Sustainable Development and Infrastructure is responsible for executing this regulation.
Ask AI about this statute
Règlement grand-ducal du 15 décembre 2011 concernant la réglementation temporaire de la circulation sur le CR322B à Wahlhausen à l'occasion de travaux routiers.
Sign in to ask AI about this statute
Sign in to start authenticated, citation-grounded statute research.
Sign in