Règlement grand-ducal du 29 septembre 2013 concernant la réglementation temporaire de la circulation sur le CR118 au lieu-dit «Breidweiler-Pont» à l'occasion de travaux routiers.
This is the preamble to a Grand-Ducal regulation about temporary traffic regulation on the CR118 at Breidweiler-Pont because of roadworks.
AI-assisted research synopsis — verify against the official legal text below.
- Jurisdiction
- Luxembourg
- Instrument
- Regulation
- Citation
- http://data.legilux.public.lu/eli/etat/leg/rgd/2013/09/29/n1/jo
- Status
- Repealed
- Version
- Undated source snapshot
- Language
- fr
- Updated
- Official source
- View official record ↗
Publicly available, excluded from search-engine indexing
This page remains available for direct access and API use, but this release emits
noindex,follow for the following reason:
- The record does not meet this release's canonical indexing criteria.
(market-indexing-disabled)
Statute overview
About this statute
This is the preamble to a Grand-Ducal regulation about temporary traffic regulation on the CR118 at Breidweiler-Pont because of roadworks. Pendant les travaux, la circulation sur ce tronçon est organisée par des signaux, avec une vitesse maximale de 70 km/h puis 50 km/h près du chantier, et un dépassement interdit pour certains conducteurs. L'accès au pont provisoire sur le CR118 à Breidweiler-Pont est interdit aux véhicules de plus de 3,15 mètres de largeur. Breaches of this regulation are punished under article 7 of the modified 14 February 1955 road traffic law. The Minister for Sustainable Development and Infrastructure is responsible for carrying out this regulation.
Ask AI about this statute
Règlement grand-ducal du 29 septembre 2013 concernant la réglementation temporaire de la circulation sur le CR118 au lieu-dit «Breidweiler-Pont» à l'occasion de travaux routiers.
Sign in to ask AI about this statute
Sign in to start authenticated, citation-grounded statute research.
Sign in