Règlement grand-ducal du 19 mai 2014 concernant la réglementation temporaire de la circulation sur le CR360 entre Michelbouch et Mertzig à l'occasion de travaux routiers.
This preamble introduces a grand-ducal regulation on temporary traffic rules for the CR360 between Michelbouch and Mertzig during road works.
AI-assisted research synopsis — verify against the official legal text below.
- Jurisdiction
- Luxembourg
- Instrument
- Regulation
- Citation
- http://data.legilux.public.lu/eli/etat/leg/rgd/2014/05/19/n7/jo
- Status
- Repealed
- Version
- Undated source snapshot
- Language
- fr
- Updated
- Official source
- View official record ↗
Publicly available, excluded from search-engine indexing
This page remains available for direct access and API use, but this release emits
noindex,follow for the following reason:
- The record does not meet this release's canonical indexing criteria.
(market-indexing-disabled)
Statute overview
About this statute
This preamble introduces a grand-ducal regulation on temporary traffic rules for the CR360 between Michelbouch and Mertzig during road works. During the works phase, vehicle and animal drivers are not allowed to enter the specified road section, except those managing or controlling the chantier. Infractions to this regulation are punished under article 7 of the 14 February 1955 road traffic law. Le ministre chargé du développement durable et des infrastructures doit exécuter le règlement et veiller à sa publication au Mémorial.
Ask AI about this statute
Règlement grand-ducal du 19 mai 2014 concernant la réglementation temporaire de la circulation sur le CR360 entre Michelbouch et Mertzig à l'occasion de travaux routiers.
Sign in to ask AI about this statute
Sign in to start authenticated, citation-grounded statute research.
Sign in