Règlement grand-ducal du 25 juillet 2015 concernant la réglementation temporaire de la circulation sur la N12 au Heiderscheidergrund à l'occasion de travaux routiers. | http://data.legilux.public.lu/eli/etat/leg/rgd/2015/07/25/n5/jo — Luxembourg law | Esheria

Règlement grand-ducal du 25 juillet 2015 concernant la réglementation temporaire de la circulation sur la N12 au Heiderscheidergrund à l'occasion de travaux routiers.

During the roadworks on the N12 at Heiderscheidergrund, traffic is narrowed to one lane, vehicles must follow the posted signals, the chantier must be bypassed as signed, the speed limit is 50 km/h, and motor-vehicle drivers are banned from overtaking except for two-wheeled motorcycles without sidecar and two-wheeled m

AI-assisted research synopsis — verify against the official legal text below.

Jurisdiction
Luxembourg
Instrument
Regulation
Citation
http://data.legilux.public.lu/eli/etat/leg/rgd/2015/07/25/n5/jo
Status
Repealed
Version
Undated source snapshot
Language
fr
Updated
Official source
View official record ↗
penalties regulatory compliance road traffic temporary works zone

Publicly available, excluded from search-engine indexing

This page remains available for direct access and API use, but this release emits noindex,follow for the following reason:

  • The record does not meet this release's canonical indexing criteria. (market-indexing-disabled)

Statute overview

About this statute

During the roadworks on the N12 at Heiderscheidergrund, traffic is narrowed to one lane, vehicles must follow the posted signals, the chantier must be bypassed as signed, the speed limit is 50 km/h, and motor-vehicle drivers are banned from overtaking except for two-wheeled motorcycles without sidecar and two-wheeled mopeds. Infractions to this regulation are punished under Article 7 of the amended law of 14 February 1955 on road traffic regulation. The Minister for Sustainable Development and Infrastructure is responsible for carrying out this regulation.