Règlement grand-ducal du 23 octobre 2015 concernant la réglementation temporaire de la circulation sur la N14 entre Biwer et Wecker à l'occasion de travaux routiers.
This preamble says the regulation concerns temporary traffic arrangements on the N14 between Biwer and Wecker for roadworks.
AI-assisted research synopsis — verify against the official legal text below.
- Jurisdiction
- Luxembourg
- Instrument
- Regulation
- Citation
- http://data.legilux.public.lu/eli/etat/leg/rgd/2015/10/23/n6/jo
- Status
- Repealed
- Version
- Undated source snapshot
- Language
- fr
- Updated
- Official source
- View official record ↗
Publicly available, excluded from search-engine indexing
This page remains available for direct access and API use, but this release emits
noindex,follow for the following reason:
- The record does not meet this release's canonical indexing criteria.
(market-indexing-disabled)
Statute overview
About this statute
This preamble says the regulation concerns temporary traffic arrangements on the N14 between Biwer and Wecker for roadworks. During the works execution phase, the maximum speed on the specified N14 section is 50 km/h in both directions. Infractions to this regulation are punished under article 7 of the modified law of 14 February 1955 on road traffic regulation. Le ministre du Développement durable et des Infrastructures est chargé d’exécuter ce règlement.
Ask AI about this statute
Règlement grand-ducal du 23 octobre 2015 concernant la réglementation temporaire de la circulation sur la N14 entre Biwer et Wecker à l'occasion de travaux routiers.
Sign in to ask AI about this statute
Sign in to start authenticated, citation-grounded statute research.
Sign in