Règlement grand-ducal du 5 novembre 2015 portant création des zones de protection autour des captages d'eau souterraine Fischbour 1 et Fischbour 2 et situées sur le territoire de la commune de Hobscheid. | http://data.legilux.public.lu/eli/etat/leg/rgd/2015/11/05/n3/jo — Luxembourg law | Esheria

Règlement grand-ducal du 5 novembre 2015 portant création des zones de protection autour des captages d'eau souterraine Fischbour 1 et Fischbour 2 et situées sur le territoire de la commune de Hobscheid.

This provision creates protection zones around the Fischbour 1 and Fischbour 2 groundwater intakes in Hobscheid.

AI-assisted research synopsis — verify against the official legal text below.

Jurisdiction
Luxembourg
Instrument
Regulation
Citation
http://data.legilux.public.lu/eli/etat/leg/rgd/2015/11/05/n3/jo
Status
Repealed
Version
Undated source snapshot
Language
fr
Updated
Official source
View official record ↗
compliance program construction standards environmental compliance forest roads permits and licensing protected areas protection zones regulatory compliance vehicle maintenance water capture operations water sampling water supply zoning

Publicly available, excluded from search-engine indexing

This page remains available for direct access and API use, but this release emits noindex,follow for the following reason:

  • The record does not meet this release's canonical indexing criteria. (market-indexing-disabled)

Statute overview

About this statute

This provision creates protection zones around the Fischbour 1 and Fischbour 2 groundwater intakes in Hobscheid. This article lists the cadastral parcels that make up the immediate, nearby, and distant protection zones. In the protected zones, forest-road access is limited to forestry work machinery, fuel and maintenance of forestry vehicles are banned, other machinery may be serviced only on an impermeable surface with enough spill recovery capacity, and certain road and drainage works must use specified techniques to protect water quality. L’exploitant du captage doit établir un programme de mesures dans les deux ans suivant l’entrée en vigueur du règlement. Certain operating establishments in protected groundwater areas must file an authorization request.