Règlement grand-ducal du 27 novembre 2015 concernant la réglementation temporaire de la circulation sur la N11A entre Echternach et Echternacher-Brück à l'occasion de travaux routiers.
This preamble introduces a Grand-Ducal regulation on temporary traffic arrangements on the N11A between Echternach and Echternacher-Brück during roadworks.
AI-assisted research synopsis — verify against the official legal text below.
- Jurisdiction
- Luxembourg
- Instrument
- Regulation
- Citation
- http://data.legilux.public.lu/eli/etat/leg/rgd/2015/11/27/n4/jo
- Status
- Repealed
- Version
- Undated source snapshot
- Language
- fr
- Updated
- Official source
- View official record ↗
Publicly available, excluded from search-engine indexing
This page remains available for direct access and API use, but this release emits
noindex,follow for the following reason:
- The record does not meet this release's canonical indexing criteria.
(market-indexing-disabled)
Statute overview
About this statute
This preamble introduces a Grand-Ducal regulation on temporary traffic arrangements on the N11A between Echternach and Echternacher-Brück during roadworks. Près du chantier, la vitesse est limitée à 50 km/h et les conducteurs de véhicules automoteurs ne peuvent pas dépasser, sauf certaines deux-roues; ils doivent aussi contourner le chantier selon la signalisation. Infractions to this regulation are punished under article 7 of the modified law of 14 February 1955 on road traffic regulation. The Minister for Sustainable Development and Infrastructure is responsible for carrying out this regulation.
Ask AI about this statute
Règlement grand-ducal du 27 novembre 2015 concernant la réglementation temporaire de la circulation sur la N11A entre Echternach et Echternacher-Brück à l'occasion de travaux routiers.
Sign in to ask AI about this statute
Sign in to start authenticated, citation-grounded statute research.
Sign in