Règlement grand-ducal du 24 avril 2018 concernant la réglementation temporaire de la circulation sur l’A1 et l’A6 entre la Croix de Gasperich et le tunnel Howald à l’occasion de travaux routiers.
This preamble introduces a grand-ducal regulation on temporary traffic rules for the A1 and A6 between Croix de Gasperich and the Howald tunnel because of roadworks.
AI-assisted research synopsis — verify against the official legal text below.
- Jurisdiction
- Luxembourg
- Instrument
- Regulation
- Citation
- http://data.legilux.public.lu/eli/etat/leg/rgd/2018/04/24/a338/jo
- Status
- In force
- Version
- Undated source snapshot
- Language
- fr
- Updated
- Official source
- View official record ↗
Publicly available, excluded from search-engine indexing
This page remains available for direct access and API use, but this release emits
noindex,follow for the following reason:
- The record does not meet this release's canonical indexing criteria.
(market-indexing-disabled)
Statute overview
About this statute
This preamble introduces a grand-ducal regulation on temporary traffic rules for the A1 and A6 between Croix de Gasperich and the Howald tunnel because of roadworks. Sur certains tronçons de l’A1 et de l’A6, la vitesse maximale est réduite et certains conducteurs n’ont pas le droit de dépasser d’autres véhicules. Infractions to this regulation are punished under article 7 of the modified law of 14 February 1955 on road traffic. The Minister for Sustainable Development and Infrastructure is responsible for carrying out this regulation.
Ask AI about this statute
Règlement grand-ducal du 24 avril 2018 concernant la réglementation temporaire de la circulation sur l’A1 et l’A6 entre la Croix de Gasperich et le tunnel Howald à l’occasion de travaux routiers.
Sign in to ask AI about this statute
Sign in to start authenticated, citation-grounded statute research.
Sign in