Règlement grand-ducal du 26 juin 2019 concernant la réglementation temporaire de la circulation sur le CR342 entre Rodershausen et la N7 et sur le CR324 entre Hosingen et Obereisenbach à l’occasion de travaux routiers.
This preamble introduces a Grand-Ducal regulation on temporary traffic arrangements on the CR342 and CR324 because of road works.
AI-assisted research synopsis — verify against the official legal text below.
- Jurisdiction
- Luxembourg
- Instrument
- Regulation
- Citation
- http://data.legilux.public.lu/eli/etat/leg/rgd/2019/06/26/a457/jo
- Status
- In force
- Version
- Undated source snapshot
- Language
- fr
- Updated
- Official source
- View official record ↗
Publicly available, excluded from search-engine indexing
This page remains available for direct access and API use, but this release emits
noindex,follow for the following reason:
- The record does not meet this release's canonical indexing criteria.
(market-indexing-disabled)
Statute overview
About this statute
This preamble introduces a Grand-Ducal regulation on temporary traffic arrangements on the CR342 and CR324 because of road works. During roadworks, access is forbidden for vehicles over 3.5 tonnes on the specified section of CR342, except bus drivers. During the works phase, vehicles over 3.5 tonnes are forbidden from accessing the stated road section, except bus drivers. Breaches of this regulation are punished under article 7 of the amended law of 14 February 1955 on traffic regulation on public roads. The Minister of Mobility and Public Works is responsible for carrying out this regulation.
Ask AI about this statute
Règlement grand-ducal du 26 juin 2019 concernant la réglementation temporaire de la circulation sur le CR342 entre Rodershausen et la N7 et sur le CR324 entre Hosingen et Obereisenbach à l’occasion de travaux routiers.
Sign in to ask AI about this statute
Sign in to start authenticated, citation-grounded statute research.
Sign in