Règlement grand-ducal du 7 octobre 2020 portant création de zones de protection autour des captages d’eau souterraine Girst et Boursdorf situées sur les territoires de la commune de Rosport-Mompach. | http://data.legilux.public.lu/eli/etat/leg/rgd/2020/10/07/a833/jo — Luxembourg law | Esheria

Règlement grand-ducal du 7 octobre 2020 portant création de zones de protection autour des captages d’eau souterraine Girst et Boursdorf situées sur les territoires de la commune de Rosport-Mompach.

This preamble introduces a Grand-Ducal regulation creating protection zones around the groundwater capture sites Girst and Boursdorf in Rosport-Mompach.

AI-assisted research synopsis — verify against the official legal text below.

Jurisdiction
Luxembourg
Instrument
Regulation
Citation
http://data.legilux.public.lu/eli/etat/leg/rgd/2020/10/07/a833/jo
Status
In force
Version
Undated source snapshot
Language
fr
Updated
Official source
View official record ↗
agricultural operations compliance planning cost estimation drinking water government execution groundwater capture measure prioritization permits and licensing protected zones regulatory administration regulatory preamble storage tanks vehicle fueling wastewater controls water protection water quality control water supply water-resource protection

Publicly available, excluded from search-engine indexing

This page remains available for direct access and API use, but this release emits noindex,follow for the following reason:

  • The record does not meet this release's canonical indexing criteria. (market-indexing-disabled)

Statute overview

About this statute

This preamble introduces a Grand-Ducal regulation creating protection zones around the groundwater capture sites Girst and Boursdorf in Rosport-Mompach. This provision creates protection zones around two groundwater intakes in Rosport-Mompach. The protection zones around the Girst and Boursdorf groundwater intakes are shown in Annex I. Article 3 sets protection-zone rules: fencing, signage, transport bans, farming limits, tank controls, and some government derogations. The operator of the water abstraction points must set up a measures programme within two years after this regulation enters into force.