Règlement grand-ducal du 13 octobre 2023 concernant la réglementation temporaire de la circulation sur la N2 entre Sandweiler et Moutfort à l’occasion de travaux d’infrastructures. | http://data.legilux.public.lu/eli/etat/leg/rgd/2023/10/13/a697/jo — Luxembourg law | Esheria

Règlement grand-ducal du 13 octobre 2023 concernant la réglementation temporaire de la circulation sur la N2 entre Sandweiler et Moutfort à l’occasion de travaux d’infrastructures.

This preamble says the regulation is adopted for temporary traffic regulation on the N2 between Sandweiler and Moutfort because of infrastructure works.

AI-assisted research synopsis — verify against the official legal text below.

Jurisdiction
Luxembourg
Instrument
Regulation
Citation
http://data.legilux.public.lu/eli/etat/leg/rgd/2023/10/13/a697/jo
Status
In force
Version
Undated source snapshot
Language
fr
Updated
Official source
View official record ↗
construction construction traffic management construction works official publication regulatory compliance road traffic road traffic compliance road use speed limit traffic control traffic management transport

Publicly available, excluded from search-engine indexing

This page remains available for direct access and API use, but this release emits noindex,follow for the following reason:

  • The record does not meet this release's canonical indexing criteria. (market-indexing-disabled)

Statute overview

About this statute

This preamble says the regulation is adopted for temporary traffic regulation on the N2 between Sandweiler and Moutfort because of infrastructure works. During the works phase, the speed limit on the listed N2 road section is reduced to 70 km/h and then 50 km/h in both directions. During the works phase, access to the listed road section is forbidden to vehicle and animal drivers, except chantier management/control drivers, and drivers who enter must stop, yield, and follow the arrow direction. Pendant les travaux, les conducteurs ne peuvent pas tourner à gauche sur la N2 entre Moutfort et Sandweiler. During the works phase, drivers may not turn right on the listed public road, except for drivers of vehicles and machines assigned to chantier management and control, who may turn right.