Règlement grand-ducal du 11 février 2025 concernant la réglementation temporaire de la circulation sur la N10 entre Putscheid et Untereisenbach à l’occasion de travaux d’infrastructures.
This preamble says the regulation is about temporary traffic rules on the N10 between Putscheid and Untereisenbach during infrastructure works.
AI-assisted research synopsis — verify against the official legal text below.
- Jurisdiction
- Luxembourg
- Instrument
- Regulation
- Citation
- http://data.legilux.public.lu/eli/etat/leg/rgd/2025/02/11/a60/jo
- Status
- In force
- Version
- Undated source snapshot
- Language
- fr
- Updated
- Official source
- View official record ↗
Publicly available, excluded from search-engine indexing
This page remains available for direct access and API use, but this release emits
noindex,follow for the following reason:
- The record does not meet this release's canonical indexing criteria.
(market-indexing-disabled)
Statute overview
About this statute
This preamble says the regulation is about temporary traffic rules on the N10 between Putscheid and Untereisenbach during infrastructure works. During road works, the road is narrowed and traffic is controlled by colored light signals; if the signals fail, drivers must yield at the narrow section and may not enter until they can pass without forcing oncoming traffic to stop. Breach of this regulation is punishable under article 7 of the modified 14 February 1955 road traffic law. This regulation stays in force until the works are completed. The minister responsible for public works is tasked with executing this regulation.
Ask AI about this statute
Règlement grand-ducal du 11 février 2025 concernant la réglementation temporaire de la circulation sur la N10 entre Putscheid et Untereisenbach à l’occasion de travaux d’infrastructures.
Sign in to ask AI about this statute
Sign in to start authenticated, citation-grounded statute research.
Sign in