Règlement grand-ducal du 11 février 2025 concernant la réglementation temporaire de la circulation sur la N10 entre Steinheim et Echternach à l’occasion de travaux d’aménagement.
This provision is the preamble to a grand-ducal regulation setting temporary traffic rules on the N10 between Steinheim and Echternach because of roadworks.
AI-assisted research synopsis — verify against the official legal text below.
- Jurisdiction
- Luxembourg
- Instrument
- Regulation
- Citation
- http://data.legilux.public.lu/eli/etat/leg/rgd/2025/02/11/a64/jo
- Status
- In force
- Version
- Undated source snapshot
- Language
- fr
- Updated
- Official source
- View official record ↗
Publicly available, excluded from search-engine indexing
This page remains available for direct access and API use, but this release emits
noindex,follow for the following reason:
- The record does not meet this release's canonical indexing criteria.
(market-indexing-disabled)
Statute overview
About this statute
This provision is the preamble to a grand-ducal regulation setting temporary traffic rules on the N10 between Steinheim and Echternach because of roadworks. Drivers on the specified road must stop and yield at the designated intersection before entering the road they are approaching. Les infractions au présent règlement sont punies selon l’article 7 de la loi modifiée du 14 février 1955 sur la circulation routière. This provision says the regulation stays in force until the end of the evaluation period. Le ministre chargé des Travaux publics doit assurer l’exécution du règlement.
Ask AI about this statute
Règlement grand-ducal du 11 février 2025 concernant la réglementation temporaire de la circulation sur la N10 entre Steinheim et Echternach à l’occasion de travaux d’aménagement.
Sign in to ask AI about this statute
Sign in to start authenticated, citation-grounded statute research.
Sign in