Règlement grand-ducal du 10 avril 2025 concernant la réglementation temporaire de la circulation sur la PC3 entre Grevenmacher et Mertert à l’occasion de travaux d’infrastructures. | http://data.legilux.public.lu/eli/etat/leg/rgd/2025/04/10/a167/jo — Luxembourg law | Esheria

Règlement grand-ducal du 10 avril 2025 concernant la réglementation temporaire de la circulation sur la PC3 entre Grevenmacher et Mertert à l’occasion de travaux d’infrastructures.

This preamble says the regulation is about temporary traffic arrangements on the PC3 between Grevenmacher and Mertert during infrastructure works.

AI-assisted research synopsis — verify against the official legal text below.

Jurisdiction
Luxembourg
Instrument
Regulation
Citation
http://data.legilux.public.lu/eli/etat/leg/rgd/2025/04/10/a167/jo
Status
In force
Version
Undated source snapshot
Language
fr
Updated
Official source
View official record ↗
commencement-end-date compliance construction site traffic management lifecycle public administration public works road access restrictions road traffic temporary circulation measures traffic regulation

Publicly available, excluded from search-engine indexing

This page remains available for direct access and API use, but this release emits noindex,follow for the following reason:

  • The record does not meet this release's canonical indexing criteria. (market-indexing-disabled)

Statute overview

About this statute

This preamble says the regulation is about temporary traffic arrangements on the PC3 between Grevenmacher and Mertert during infrastructure works. Pendant les travaux, l’accès à la route indiquée est interdit aux conducteurs de véhicules et d’animaux, sauf pour certains véhicules et machines chargés de la gestion et du contrôle du chantier. Infractions to this regulation are punishable under article 7 of the modified law of 14 February 1955. This regulation stays in force until the works are completed. Le ministre ayant les Travaux publics doit exécuter ce règlement.