Règlement grand-ducal du 30 septembre 2025 concernant la réglementation temporaire de la circulation sur le CR122 entre Wormeldange et Dreiborn à l’occasion de travaux d’infrastructures. | http://data.legilux.public.lu/eli/etat/leg/rgd/2025/09/30/a428/jo — Luxembourg law | Esheria

Règlement grand-ducal du 30 septembre 2025 concernant la réglementation temporaire de la circulation sur le CR122 entre Wormeldange et Dreiborn à l’occasion de travaux d’infrastructures.

This preamble says the Grand-Duc is issuing a temporary traffic regulation for the CR122 between Wormeldange and Dreiborn because of infrastructure works.

AI-assisted research synopsis — verify against the official legal text below.

Jurisdiction
Luxembourg
Instrument
Regulation
Citation
http://data.legilux.public.lu/eli/etat/leg/rgd/2025/09/30/a428/jo
Status
In force
Version
Undated source snapshot
Language
fr
Updated
Official source
View official record ↗
construction site traffic management construction works infrastructure road access road traffic compliance traffic restriction transport

Publicly available, excluded from search-engine indexing

This page remains available for direct access and API use, but this release emits noindex,follow for the following reason:

  • The record does not meet this release's canonical indexing criteria. (market-indexing-disabled)

Statute overview

About this statute

This preamble says the Grand-Duc is issuing a temporary traffic regulation for the CR122 between Wormeldange and Dreiborn because of infrastructure works. Pendant les travaux, l’accès au tronçon du CR122 indiqué est interdit aux conducteurs de véhicules et d’animaux, sauf pour les conducteurs de véhicules et machines chargés de la gestion et du contrôle du chantier. During the works phase, access to the listed road is prohibited in both directions for drivers of vehicles and animals, except for residents and their suppliers. Infractions to this regulation are punished under article 7 of the amended 14 February 1955 road traffic law. This regulation stays in force until the works are completed.