Règlement grand-ducal du 8 décembre 2025 concernant la réglementation temporaire de la circulation sur le CR122 et la PC15 entre Hunsdorf et Lorentzweiler à l’occasion de travaux souterrains.
This preamble introduces a temporary traffic regulation for the CR122 and PC15 between Hunsdorf and Lorentzweiler because of underground works.
AI-assisted research synopsis — verify against the official legal text below.
- Jurisdiction
- Luxembourg
- Instrument
- Regulation
- Citation
- http://data.legilux.public.lu/eli/etat/leg/rgd/2025/12/08/a563/jo
- Status
- In force
- Version
- Undated source snapshot
- Language
- fr
- Updated
- Official source
- View official record ↗
Publicly available, excluded from search-engine indexing
This page remains available for direct access and API use, but this release emits
noindex,follow for the following reason:
- The record does not meet this release's canonical indexing criteria.
(market-indexing-disabled)
Statute overview
About this statute
This preamble introduces a temporary traffic regulation for the CR122 and PC15 between Hunsdorf and Lorentzweiler because of underground works. During the works phase, the maximum speed on the specified road section is 50 km/h. Les infractions aux dispositions de ce règlement sont punies selon l’article 7 de la loi modifiée du 14 février 1955 sur la circulation routière. This article says the regulation stays in force until the work is completed. The minister responsible for Public Works must carry out this regulation.
Ask AI about this statute
Règlement grand-ducal du 8 décembre 2025 concernant la réglementation temporaire de la circulation sur le CR122 et la PC15 entre Hunsdorf et Lorentzweiler à l’occasion de travaux souterrains.
Sign in to ask AI about this statute
Sign in to start authenticated, citation-grounded statute research.
Sign in