Règlement grand-ducal du 2 avril 2026 concernant la réglementation temporaire de la circulation sur l’A7 entre l’échangeur Waldhof et l’échangeur Lorentzweiler à l’occasion de travaux d’infrastructures. | http://data.legilux.public.lu/eli/etat/leg/rgd/2026/04/02/a198/jo — Luxembourg law | Esheria

Règlement grand-ducal du 2 avril 2026 concernant la réglementation temporaire de la circulation sur l’A7 entre l’échangeur Waldhof et l’échangeur Lorentzweiler à l’occasion de travaux d’infrastructures.

This regulation concerns temporary traffic management on the A7 between the Waldhof and Lorentzweiler interchanges because of infrastructure works.

AI-assisted research synopsis — verify against the official legal text below.

Jurisdiction
Luxembourg
Instrument
Regulation
Citation
http://data.legilux.public.lu/eli/etat/leg/rgd/2026/04/02/a198/jo
Status
In force
Version
Undated source snapshot
Language
fr
Updated
Official source
View official record ↗
commencement and expiry infrastructure works lifecycle road traffic compliance road works traffic management traffic regulation

Publicly available, excluded from search-engine indexing

This page remains available for direct access and API use, but this release emits noindex,follow for the following reason:

  • The record does not meet this release's canonical indexing criteria. (market-indexing-disabled)

Statute overview

About this statute

This regulation concerns temporary traffic management on the A7 between the Waldhof and Lorentzweiler interchanges because of infrastructure works. During the works phase, the listed public roads are reduced to one traffic lane and the maximum speed is progressively limited to 90 km/h and then 70 km/h. Infractions au présent règlement sont punies selon l’article 7 de la loi modifiée du 14 février 1955 sur la circulation routière. This regulation stays in force until the works are finished. The minister responsible for public works is charged with executing this regulation, which will be published in the official journal.