Règlement ministériel du 22 juin 2006 concernant la réglementation temporaire de la circulation sur l'autoroute A13 entre le tunnel de Aessen et le giratoire de Pétange-Biff.
This preamble says the ministers are issuing a temporary traffic regulation for the A13 motorway section between the Aessen tunnel and the Pétange-Biff roundabout because roadworks will start on 30 June 2006.
AI-assisted research synopsis — verify against the official legal text below.
- Jurisdiction
- Luxembourg
- Instrument
- Regulation
- Citation
- http://data.legilux.public.lu/eli/etat/leg/rmin/2006/06/22/n1/jo
- Status
- In force
- Version
- Undated source snapshot
- Language
- fr
- Updated
- Official source
- View official record ↗
Publicly available, excluded from search-engine indexing
This page remains available for direct access and API use, but this release emits
noindex,follow for the following reason:
- The record does not meet this release's canonical indexing criteria.
(market-indexing-disabled)
Statute overview
About this statute
This preamble says the ministers are issuing a temporary traffic regulation for the A13 motorway section between the Aessen tunnel and the Pétange-Biff roundabout because roadworks will start on 30 June 2006. This provision closes parts of the A13 around Pétange/Sanem/Differdange for road users, reroutes the chantier, sets reduced speed limits, and bans overtaking in the affected area. Infractions to this regulation are punished under article 7 of the modified law of 14 February 1955. The regulation takes effect on the day it is published in the Mémorial.
Ask AI about this statute
Règlement ministériel du 22 juin 2006 concernant la réglementation temporaire de la circulation sur l'autoroute A13 entre le tunnel de Aessen et le giratoire de Pétange-Biff.
Sign in to ask AI about this statute
Sign in to start authenticated, citation-grounded statute research.
Sign in